About this module
At Level 1 you learned the parts and the rules. At Level 2 you start making decisions: where to put a borehole, whether a quote is fair, which pump to buy and whether the water is safe. You are still working under supervision, but you do real jobs.
Who it is for. Trainees who finished Boreholes and Water Pumps (Level 1) or have equal experience. National Proficiency II holders do mostly routine tasks, with some varied work, under limited supervision. Trainees must be 18 or over.
Bridge from Level 1: what you already know
- Never enter a well, tank or casing; wiring is for a certified electrician
- Rain, aquifer, water table, static water level, drawdown and yield
- Casing, screen, gravel pack, sanitary seal, apron and cap
- Drilling needs a Water Resources Commission (WRC) licence
- Hand pump caretaker checks and sanitary inspection
- Parts of a submersible system and a pump-and-tank rig
- Water can be unsafe without looking dirty; test at an accredited laboratory
- Your costing sheet and one-page plan
This module is not a CTVET curriculum, and it is not a drilling course. The CTVET list of approved competency-based programmes that we found does not include borehole drilling. Ask a qualified expert. Drilling is by licensed drillers only, wiring is by a certified electrician, and water quality needs the WRC and an accredited laboratory. This is general information, not legal or engineering advice.
How the module works
Each unit has learning outcomes, performance criteria, the range and the evidence your assessor needs. You are judged Competent or Not Yet Competent. Every unit ends with a practical task, homework and three "Check yourself" questions. All prices in this book are examples, not verified quotes.
Unit 1 · Siting, the desk study and hiring a licensed driller
The best borehole starts before the rig arrives: a good site, a clear contract and a driller who holds a licence.
Competency standard
| Learning outcome | Performance criteria — the trainee… |
|---|---|
| 1.1 Read a site | notes the slope, drainage, buildings, latrines, septic tanks, farms and power on a sketch |
| 1.2 Apply setback guides | keeps the borehole away from pollution sources and records the distances |
| 1.3 Check a driller | asks for the WRC licence and references |
| 1.4 Compare quotes | lists what each quote includes and excludes and works out totals |
| 1.5 Know the paperwork | lists the permits, registration and records to ask the WRC about |
Range. Household and small-farm boreholes. Evidence. Site sketch; quote comparison; oral questions.
Ask a qualified expert. Where to drill and how deep is for a hydrogeologist or a licensed driller. Ask the Water Resources Commission for current licence, permit and registration rules, and ask a qualified lawyer before you sign a contract. This is general information, not legal advice or an engineering design.
The desk study (before the site visit)
- Ask neighbours with boreholes: depth, yield, taste, problems.
- Ask the driller or a hydrogeologist what they know about the rocks in your area. Rock type matters: in a study of Ashanti Region boreholes, success rates were about 91 percent in Birimian rock but about 72 percent in granitoids. That is another region, so it is an example; for Takoradi it is not verified.
- Check the plan of the property for buildings, drains and future extensions.
Keep away from pollution
- A borehole should be kept away from latrines, septic tanks, soakaways, rubbish and animal pens. CSIR Water Research Institute warns that a borehole less than 30 to 50 metres from a septic tank is likely to be polluted. Use that as a minimum guide.
- The exact distance the WRC requires was not verified; ask the WRC (not verified).
- Place the borehole uphill of pollution sources where possible, so runoff flows away from it.
- Leave room for a rig to enter, for a pump pull-up later, and for the apron and drain.
Hiring a licensed driller
- Drilling without a WRC licence is an offence; Regulation 23 of L.I. 1827 sets a fine of up to 200 penalty units or up to 12 months in prison, or both.
- The WRC has fined firms GH¢60,000, seized rigs, and said people who hire unlicensed drillers may be prosecuted and that owners must register boreholes.
- Ask to see the licence, and ask the WRC to confirm it.
Licence terms not verified. One report says drilling licences last three years, but we could not confirm it, the fee, or the registration form. Ask the WRC.
What a good quote and contract include
| Item | Why it matters |
|---|---|
| Driller's licence number and company details | Proof they may drill |
| Price per metre and what is included (casing, screen, gravel pack, seal, development) | Prevents surprise charges |
| What happens if the hole is dry | Many contracts say you still pay; read it |
| Test pumping: hours, method, who records | Gives the yield you need to size the pump |
| Water test and disinfection | Safety |
| Handover documents: log, depth, levels, yield, water test | Needed for the pump and for the WRC |
| Payment steps (for example part before, rest after the test) | Protects both sides |
Example prices (not verified): a 2026 Ghana article gave drilling at about GH¢8,000 to 20,000 and a water-quality test at GH¢300 to 800; a vendor blog gave GH¢180 to 320 per metre, with an average around GH¢240. Get at least two written quotes.
Compare two quotes
Example: the borehole is planned at 55 m. Quote A: GH¢200 per metre drilling, casing and gravel GH¢1,500, test pumping and water test GH¢800. Quote B: GH¢180 per metre drilling only; casing, gravel pack and test pumping are "to be agreed". (1) What is the total of Quote A? (2) What is Quote B's drilling total? (3) What must you ask Driller B before you can compare?
Site sketch and quote check
- Visit a site (the Hub or a trainer's site) and make a sketch with a tape: buildings, tanks, latrines, drains, slope, power, access.
- Mark the distance from each pollution source to the proposed point.
- Write the questions you would ask the driller and the WRC.
- Compare two sample quotes using the table.
- Record the sketch, questions and comparison in your logbook.
Ask two drillers
With your trainer's help, ask two licensed drillers in Takoradi what their price per metre includes. Write the answers and the date. Do not pay anyone.
From the field: The borehole with no water
The moment. A client paid for a borehole and did not get the water he hoped for.
The problem. The hole was a total loss to the client.
The cause. No proper assessment was made to find the best place for the water.
The lesson. Find the water on paper before you look for it with a drill.
Next time. 1. Look at the land: low-lying places and the water table. 2. Read the geological map of the area. 3. Ask a qualified hydrogeologist before drilling.
Ask a qualified expert: a hydrogeologist or a licensed driller decides where to drill.
Read the site before you read the quote. Ghana's Geological Survey Authority is the office to ask which geological map covers your site (the map itself was not found online for this book: not verified).
Siting steps before any drilling (international method, labelled)
| Step | What happens | Who | Source and tag |
|---|---|---|---|
| 1. Desk study | Collect neighbours' boreholes, geology, rainfall, land use | You with the hydrogeologist | RWSN Code of Practice 2010 (international) |
| 2. Geological map | Read rock type and structures near the site; ask the Geological Survey Authority for the map | Hydrogeologist | Ghana source not found; not verified |
| 3. Site walk | Low ground, drainage, rock outcrops, pollution sources, rig access | You and the hydrogeologist | Good practice |
| 4. Geophysical survey | Resistivity survey (and other methods) to find fractured rock or water layers; one study found the common 4-electrode method gave low success in the Tarkwa area, so a survey does not guarantee water | Qualified hydrogeologist | Good practice; Tarkwa finding is from a search summary, not verified here |
| 5. Decision | Choose the best point; write the expected depth and the risks | Hydrogeologist and owner | International method |
| 6. Coastal check | If near the shore, plan a salt (conductivity) check during drilling | Driller and owner | Ghana Hydrogeology Review (summary only) |
Ask a qualified expert. Siting is the job of a qualified hydrogeologist or a licensed driller. This table is the general method used internationally; it is not a Ghana rule. Check it against the Water Resources Commission requirements when you read them.
Tools and items for this unit
| Item | What it is and its use | Size or type | Who may handle | Also called |
|---|---|---|---|---|
| Resistivity set and GPS | Instruments used by the hydrogeologist or driller to site a borehole. A trainee only needs the names. | n/a | Hydrogeologist | resistivity meter; survey set |
| Dip meter (water-level tape) | A reel of graduated tape with a probe that beeps or lights when it touches water. It gives the static and pumping water level from a fixed mark on the casing. Use before and during pumping. | Tape 50, 100 or 150 m | You (with trainer) | water level meter; well sounder; dip tape |
| Tape measure, plumb bob and spirit level | Measure lengths and heights, hang a vertical line, and check that a tank base is level. | 5 m to 30 m tape | You | measuring tape; plumb line and level |
| Sample bottles | Sterile bottles from the laboratory for germ tests and clean bottles for chemistry. The laboratory tells you which and how to keep the sample. | 250 or 500 mL | You | sample container; sample jar |
| Conductivity (EC) or TDS meter | Measures dissolved salts as electrical conductivity (uS/cm) or total dissolved solids (mg/L). A quick check for salty water, important near the coast. Use before and during pumping. | 0 to 2,000 uS/cm or wider | You | EC meter; TDS meter; salinity meter |
Check yourself
- Name two things a borehole must be kept away from.
- Why compare what each quote includes, not only the price per metre?
- What should you ask to see before work starts?
Unit 2 · Overseeing drilling and test pumping
You do not drill. But you can watch the work, keep records and spot a bad job early.
Competency standard
| Learning outcome | Performance criteria — the trainee… |
|---|---|
| 2.1 Follow the drilling job | lists the stages and what the owner should see at each |
| 2.2 Read a driller's log | reads depths, rock types, water strikes and casing depths |
| 2.3 Record a pumping test | records time, flow and water level correctly |
| 2.4 Calculate yield and specific capacity | works out drawdown, yield and specific capacity |
| 2.5 Spot problems | names signs of a poor job: no seal, no apron, sand in the water |
Range. Household and small-farm boreholes; view only, from a safe distance. Evidence. Log reading; pumping-test calculation; oral questions.
Ask a qualified expert. Drilling and development are done by the licensed driller only; keep clear of the rig. Test pumping uses powered equipment: the driller and a certified electrician run it. Ask a licensed driller or a hydrogeologist to interpret a test. Ask the Water Resources Commission about the records to keep. This is general information, not an engineering design.
What the owner should see (general good practice)
| Stage | What you check |
|---|---|
| Drilling | Licensed driller on site; log kept metre by metre |
| Casing and screen | Casing diameter and depth match the contract; screen at the water layer |
| Gravel pack and seal | Clean gravel around the screen; a seal near the top |
| Development | Water runs clear and sand-free |
| Test pumping | Steady flow measured; levels recorded at set times |
| Apron, cap and handover | Concrete apron with drain; lockable cap; the log and test sheet handed over |
Reading a driller's log (example)
| Depth (m) | What the driller found |
|---|---|
| 0 to 6 | Clay and weathered rock |
| 6 to 22 | Hard rock, no water |
| 22 to 31 | Fractured rock, water strike (small) |
| 31 to 47 | Hard rock |
| 47 to 52 | Fractured rock, water strike (main) |
(An example, not a real borehole.) The driller sets the screen where the water-bearing layers are, and the log shows why.
Test pumping
Test pumping finds how much water the borehole can give. In Ghana studies it is commonly done as a short step test to find a suitable rate, followed by a constant-rate test, with recovery measured afterwards. Test length and method should follow the driller's contract and the WRC's rules; ask the WRC (not verified).
Definitions: specific capacity = yield ÷ drawdown (cubic metres per hour per metre of drawdown). A falling specific capacity at higher pumping rates tells you that the borehole is better at low rates.
Step test and constant-rate test (example numbers)
Static water level (SWL) 18.0 m. Step test, one hour per step: Step 1 pumped at 1.2 m³/h, drawdown 2.5 m. Step 2 at 2.0 m³/h, drawdown 4.9 m. Step 3 at 2.8 m³/h, drawdown 8.4 m. Then a constant-rate test at 2.4 m³/h for 6 hours: water level at the end 25.0 m. After stopping, water was back at 18.4 m after 60 minutes.
(1) Specific capacity for each step. (2) Does it rise or fall as the rate goes up? (3) Drawdown at the end of the constant-rate test. (4) Specific capacity for the constant-rate test. (5) How much of the drawdown had recovered after 60 minutes, as a percentage?
Signs of a poor job
- Sand or mud keeps coming up after development
- No sanitary seal or no apron
- No log, no test sheet or no water test handed over
- Casing that is shorter than the contract says
- A water level that keeps falling during a constant-rate test
Pumping-test record sheet
- Make a record sheet: date, time, minutes since start, flow, water level, drawdown, comments.
- With a dip meter (or weighted tape) on a test well or the Hub's borehole, with the owner's permission and a certified electrician running the pump, measure the static water level.
- Record the pump's flow with the bucket and stopwatch at set times.
- Record water level at 1, 2, 5, 10, 20, 30 and 60 minutes, then hourly (good practice).
- Calculate drawdown and specific capacity.
- Record everything in your logbook.
Read a real log
Ask a borehole owner for a copy of their driller's log or test sheet (with permission). Copy the depth, static level, yield and test length. Note anything missing.
From the field: The driller with only a drilling machine
The problem. Most drilling companies skip steps, such as development and testing, because they have only the drilling machine and not the other equipment.
The lesson. A drilled hole is not a finished borehole.
Next time. 1. Ask before hiring what equipment they bring. 2. Insist on development and a pump test. 3. Ask for the completion record.
Ask a qualified expert: the Water Resources Commission and a qualified lawyer for the contract.
From the field: When the water gushes into the sky
The moment. Drilling hit a pressurised water table and the water shot high into the air.
The problem. Near overhead high-tension lines, a shock is almost unavoidable. Some drills have gone through buried electric cables, with fatal injuries.
The cause. No one checked the surroundings or the power company before work began.
The lesson. Look up and look down before you drill.
Next time. 1. Watch the surroundings carefully. 2. Contact the power company before any work. 3. Keep clear of lines and cables and have a qualified supervisor on site.
Ask a qualified expert: the power company and a qualified safety officer.
Before the rig arrives: the utility and overhead line check
- Ask the power company for the line voltage and for the position of any underground cable on the plot and along the access road.
- Write the answer on the site plan. If the answer is "not sure", treat the line as high voltage.
- Walk the access route for low lines, tall trees near lines and gate heights.
- Mark and fence any buried cable position. Keep the rig out of the mark.
- Agree a stop signal and a standby person who watches the lines.
International distance rule (not Ghana law). The United States OSHA table for cranes and derricks gives these minimum distances from overhead lines (listed here because a drilling mast and a pump hoist are tall): up to 50 kV, 3.05 m (10 ft); over 50 to 200 kV, 4.6 m (15 ft); over 200 to 350 kV, 6.1 m (20 ft); over 350 to 500 kV, 7.6 m (25 ft). One training source says to use 6.1 m (20 ft) when the voltage is unknown. Rain, mist, fog or dust on a mast can carry current, so the stated distance may not be enough in wet air. Distances are measured to the closest part of the rig or load, with the mast fully raised and swinging.
Call-before-you-dig. No Ghana one-call service was found for this book (not verified). Write to or visit the power company, the water company and the road authority before digging or drilling.
Blow-out and gush response (general good practice, not a Ghana rule). If water or air and mud shoot out unexpectedly: the driller stops the machine, everyone steps back well upwind and upslope of any spray, nobody goes near an overhead line or a wet cable, and the driller controls the hole. Call 112 for injury. Never put your hand or tool in the jet.
Ask a qualified expert. Safe distances and utility locating are for the power company and a qualified safety officer. The OSHA figures are international and must be checked against the Energy Commission and the power company rules. This is general information, not electrical or safety advice.
What a good driller does, and the completion record you should demand
| Item | What to see |
|---|---|
| Licence | The company's current WRC drilling licence |
| Notice | The WRC told before drilling (a summary says this is required; read the text) |
| Log | A rock log taken as drilling goes down |
| Casing and screen | Sizes and depths as in the contract; the screen opposite the water layer; centralisers so the screen does not rub the wall and block with clay |
| Gravel pack | Clean, uniform gravel just slightly larger than the slots; none within 3 to 6 m of the ground surface |
| Seal and apron | Sealed top; concrete apron with a drain |
| Development | Continues until the water is clear and fine material has gone; surging is the most common method; overpumping is the simplest but least effective |
| Test pumping | Step test, constant-rate test and recovery, recorded |
| Completion record | A record of the whole borehole; the RWSN Code of Practice has a suggested format |
Screen slot size. If a sieve analysis of the water-bearing material is possible, choose a slot size that retains 40 to 60 percent of the material. The driller decides this; you check that it was decided and recorded.
Plot a step test (uses the Unit 2 example numbers)
Using the step-test figures in the exercise above, work out s/Q (drawdown divided by pumping rate) for each step and decide whether the borehole loses extra head at high rates. See Appendix D for the method.
Safety protocol: test pumping
Before you start
- Written permission from the owner; the driller or electrician sets up the test pump and generator; a stop signal is agreed.
- PPE: boots, gloves, glasses, ear protection near the generator.
- Discharge pipe laid so the water runs away from the borehole and from the people; nobody stands in its path.
- Fuel stored away from the generator; fire extinguisher at hand.
- Record sheet, dip meter, bucket or flow meter and watch ready.
While you work
- Do take readings at the set times and write them down at once.
- Do keep the dip tube clear and the cable off the wet ground.
- Do not refuel a hot generator; do not touch the pump cable or control box; do not leave the test unattended.
After
- Stop the pump on the driller's or electrician's signal; keep measuring recovery.
- Switch off and lock out; let the generator cool before storing it.
- Check the discharge point for erosion; hand over the sheet; report any fault.
Emergency
- Call 112 for any serious injury, fire, shock or someone trapped.
- Switch off the power at the board only if it is safe to reach it; never touch a person who may be in contact with live equipment.
- Give first aid you were trained to give and keep the person warm and still until help arrives. This is not medical advice.
Tools and items for this unit
| Item | What it is and its use | Size or type | Who may handle | Also called |
|---|---|---|---|---|
| Drilling rig, compressor, DTH hammer, drill bit, drill rods and mud pump | The driller's machine and tools. A down-the-hole (DTH) hammer breaks hard rock with air; a mud pump circulates drilling fluid. You only need the names. Never operate them. | Per driller | Driller | drill rig; drilling machine |
| Casing | Plain pipe lining the borehole so it does not collapse and so water from above cannot get in. | uPVC, steel or HDPE; diameter 100 to 200 mm | Driller | well casing; lining pipe |
| Screen (slotted casing) | Slotted pipe opposite the water-bearing layer. Water enters through the slots; sand is kept out. | Slot size in mm; open area | Driller | well screen; slotted casing; strainer pipe |
| Sump and centraliser | The sump is a plain pipe below the screen where silt settles. Centralisers keep the casing in the middle of the hole. | Casing size | Driller | tail pipe; bottom cap |
| Gravel pack (filter pack) | Clean, rounded, sized gravel around the screen. It holds back fine sand and keeps the slots open. | Grain size in mm; volume | Driller | filter pack; gravel filter |
| Sanitary seal (cement or bentonite grout) | A sealed collar near the top of the annulus so dirty surface water cannot run down the outside of the casing. | Depth and material set by the driller | Driller | annular seal; grout seal; sanitary grout |
| Bailer and surge block | Development tools. A bailer lifts mud out; a surge block moves water in and out of the screen to loosen fines. | Per driller | Driller | sand bailer; mud bucket |
| Airlift (compressor and eductor pipe) | Uses compressed air to lift water and mud from the hole during development. | Per driller | Driller | air-lift development |
| Dip meter (water-level tape) | A reel of graduated tape with a probe that beeps or lights when it touches water. It gives the static and pumping water level from a fixed mark on the casing. Use before and during pumping. | Tape 50, 100 or 150 m | You (with trainer) | water level meter; well sounder; dip tape |
| Flow meter (inline) | A meter in the pipe that shows flow rate (L/s or m3/h) and total volume. Gives a better reading than a bucket on large pumps. | Same size as the pipe | You | flow-rate meter; inline meter |
| Marked bucket (20 L) | A bucket with the volume marked on it. Fill it from the spout or pipe and time it to measure flow (bucket test). Use at hand pumps, taps and pump outlets. | 20 L; mark the full line with a measured jug | You | pail; measuring bucket |
| Stopwatch | Times how long the bucket takes to fill. A phone stopwatch is fine. | Seconds | You | timer |
| Sand tester (Imhoff cone) | A clear cone that lets sand in a litre of pumped water settle so you can read it. Use after development and in the first weeks. | 1 L cone | You (with trainer) | Imhoff settling cone; sand cone |
| Conductivity (EC) or TDS meter | Measures dissolved salts as electrical conductivity (uS/cm) or total dissolved solids (mg/L). A quick check for salty water, important near the coast. Use before and during pumping. | 0 to 2,000 uS/cm or wider | You | EC meter; TDS meter; salinity meter |
| Thermometer | Reads the water temperature. Warm water cools a motor less well and changes chlorine action. | 0 to 50 C | You | water thermometer |
| Pressure gauge | A dial that reads pressure in bar or kPa. About 10 m of water head equals 1 bar. Fit on the pump outlet to check the duty point. | 0 to 6 or 0 to 10 bar; thread BSP 1/4 or 1/2 inch | You | pressure gage; manometer |
Check yourself
- What is specific capacity?
- Name two signs of a poor drilling job.
- A borehole gives 3.0 m³/h with 6 m drawdown. What is its specific capacity?
Unit 3 · Size a pump
A pump that is too big empties the borehole and burns out. A pump that is too small never fills the tank. Sizing is arithmetic and care.
Competency standard
| Learning outcome | Performance criteria — the trainee… |
|---|---|
| 3.1 Work out demand | calculates daily demand and the hours of pumping |
| 3.2 Work out total dynamic head | adds pumping level, lift, friction and pressure |
| 3.3 Read a pump curve | finds the flow at the head on a manufacturer's curve |
| 3.4 Check the borehole | keeps the pump flow below the tested yield and the intake safely under water |
| 3.5 Compare pump types | compares price, power and fit |
Range. Household and small-farm borehole pumps. Evidence. Sizing sheet; oral questions.
Ask a qualified expert. Pump sizing for farms and communities should be checked by a qualified engineer or the pump supplier. Electrical supply, cable size and protection are the work of an Energy Commission-certified electrician. These formulas and numbers are examples for learning. Ask a GhIE-registered engineer for larger systems.
Step 1: daily demand
Daily demand = people (or animals or area) × litres each. Example: a farm house with water for 40 litres per person per day for 10 people, plus 1,600 litres for animals and garden: 10 × 40 = 400; 400 + 1,600 = 2,000 litres. For a bigger example below we use 4,000 L/day.
Step 2: pump flow
Pump flow = daily demand ÷ hours of pumping. Example: 4,000 L ÷ 4 hours = 1,000 L/h = 1 m³/h.
Check against the borehole: the pump flow should be well below the tested safe yield. An example planning rule: stay below about 70 percent of the tested yield (an example rule, not a Ghana standard). Tested yield 2.4 m³/h × 0.70 = 1.68 m³/h; 1.0 m³/h is below it.
Step 3: total dynamic head (TDH)
TDH is built from the pumping water level (static level plus drawdown), the lift above ground, the pressure needed and friction in the pipe. Use the worst case: the water level at its lowest in the dry season.
TDH = static water level + drawdown + height above ground to the tank inlet + friction loss + pressure head needed
Example: static water level 18 m; drawdown 7 m (from the test); tank inlet 8 m above the ground; friction from the pipe maker's table 3 m (example); no extra pressure: 18 + 7 + 8 + 3 = 36 m.
Step 4: power
Hydraulic power (W) = total head (m) × flow (litres per second) × 9.81 Electrical power = hydraulic power ÷ overall pump efficiency (use 30–40% for planning)
Flow 1 m³/h = 1,000 ÷ 3,600 = 0.278 L/s. Hydraulic power = 36 × 0.278 × 9.81 = 98 W. At 35% overall efficiency: 98 ÷ 0.35 = 280 W electrical. A real pump motor is chosen from the maker's curves; a bigger size is common to give a margin.
Step 5: pump curve
A pump curve is a graph from the maker: flow along the bottom and head up the side. Find your TDH (36 m) on the head scale, move across to the curve and down to read the flow. If the flow at your head is close to what you need, the pump may fit. The point where the pump curve meets the system's needs is the operating point. Pump makers' curves are the evidence; never size from a shop label alone. Many cheap listings are sewage or garden pumps.
Setting depth
Set the pump intake well below the lowest pumping level and well above the bottom of the borehole and the screen's silt zone. Example: pumping level 25 m; intake set at 40 m: 15 m of water above the pump. The exact margin comes from the pump maker and driller (not verified).
Pump prices (examples)
In Greater Accra listings in October 2026, a 1 HP submersible pump was about GH¢1,095, a 1 HP surface pump about GH¢550 and a DC solar 1 HP surface pump about GH¢6,500. These are classified-ad prices, not a market survey. A 1,000-litre tank was listed at about GH¢1,815 and a 3,000-litre tank at about GH¢5,250.
Size a pump
Example: demand 3,000 L/day, 5 hours of pumping. Static level 22 m, drawdown 6 m, tank inlet 5 m above ground, friction 2 m, tested yield 2.0 m³/h.
(1) Pump flow in L/h and m³/h. (2) Is it below 70% of the tested yield? (3) TDH. (4) Flow in L/s. (5) Hydraulic power. (6) Electrical power at 35% efficiency.
Sizing sheet
- Pick a real farm or home near you (with permission).
- Count the demand: people, animals, garden.
- Choose hours of pumping; calculate flow.
- Find static level, drawdown and tank height; estimate friction from the pipe maker's table.
- Work out TDH, hydraulic power and electrical power.
- Look at two pump leaflets and say which curve fits.
- Record the whole sheet in your logbook.
Collect two pump curves
Collect two manufacturer's leaflets (shop or online). Copy one pump's curve points and say what flow it gives at 35 m.
From the field: The pump bought on price
The problem. People choose the pump by cost instead of working out the depth, the suction power and the cubic metres of water needed.
The lesson. A cheap pump that cannot do the job is the most expensive one.
Next time. 1. Work out the daily water needed. 2. Measure the depth to the water. 3. Choose from the pump curve, not the price.
Ask a qualified expert: a GhIE-registered engineer or the pump supplier checks the sizing.
From the field: The rating that was not true
The problem. Many pumps have a capacity written on them far above what they deliver, and give up after a few days.
The lesson. Do not trust the number on the box.
Next time. 1. Compare with the pump curve. 2. Test the flow with a bucket and a timer. 3. Keep the receipt and ask for a guarantee.
Ask a qualified expert: the pump supplier or a GhIE-registered engineer.
Worked example: calculation against price (all numbers are examples)
Demand 6,000 L per day, pumped over 6 hours, so flow = 6,000 ÷ 6 = 1,000 L/h = 1 m3/h. Static water level 40 m, drawdown 6 m, tank inlet 3 m above ground, friction 1 m: TDH = 40 + 6 + 3 + 1 = 50 m. Hydraulic power = 50 × 0.278 × 9.81 = about 136 W; at 35 percent overall efficiency, about 390 W electrical (formula: Source: PSU Solar Pumping).
A shop sells a cheap pump labelled "5 m3/h". Its maker's curve (an example) reads: head 10 m, flow 5.0 m3/h; 20 m, 3.5; 30 m, 1.8; 40 m, 0.6; 45 m, 0 (shut-off). The label shows the best flow at 10 m head. At 50 m head, above the shut-off head of 45 m, this pump gives no water. The pump you want has a published curve that gives at least 1 m3/h at 50 m head, with margin.
How to read a pump curve and the operating point
The operating point is where the pump curve crosses the system curve. Example pump (labelled generic, not a real maker's curve): head 50 m at zero flow, 48 m at 1 m3/h, 44 at 2, 38 at 3, 30 at 4, 20 at 5. System: static head 33 m plus friction of 3 m per (m3/h) squared: 33 at 0, 36 at 1, 45 at 2, 60 at 3.
| Case | Operating flow | Head |
|---|---|---|
| Normal level (static 33 m) | about 1.94 m3/h | about 44.3 m |
| Dry season, level 4 m lower (static 37 m) | about 1.67 m3/h | about 45.3 m |
When the water level falls, the flow falls. When a screen clogs, the drawdown and head rise and flow falls the same way. Check that the pump flow stays below the tested yield (the 70 percent planning share in this unit is an example, not a Ghana rule).
Suction lift and NPSH (surface pumps)
Air pressure can push water up only a limited height (about 10 m in theory at sea level). In practice a surface pump lifts far less, and the maker gives a net positive suction head (NPSH) figure that must be met. Use the maker's data, and keep the suction pipe short, straight and air-tight (good practice). A borehole deeper than a few metres below the pump needs a submersible or a jet pump designed for it.
Affinity laws (changing the speed of a pump)
If a speed drive (VSD) changes the speed by a ratio r: flow changes by r, head by r squared and power by r cubed. Example: 50 Hz to 40 Hz, r = 0.8, flow 0.8, head 0.64, power 0.512 of the original. A motor cooled by the water pumped past it needs enough flow past the motor; do not lower the speed so far that cooling is lost.
Check a pump label
Example: your sizing gives 1.2 m3/h at TDH 44 m. A shop pump curve reads: 40 m, 1.6 m3/h; 45 m, 1.0 m3/h; 50 m, 0 flow. (1) Estimate the flow at 44 m by interpolating between 40 m and 45 m. (2) Is it enough? (3) What would you ask the shop for?
Parts of a surface pump, every part labelled
| No. | Part | What it does | Safety rule |
|---|---|---|---|
| 1 | Foot valve and strainer | Keeps the suction pipe full and stops debris | Keep the strainer clear; inspect for cracks |
| 2 | Suction pipe | Brings water to the pump | Short, air-tight, no high points |
| 3 | Priming plug | Opening to fill the pump with water before the first start | Fill with the pump switched off |
| 4 | Pump casing (volute) | Collects water from the impeller | Never open while powered |
| 5 | Impeller | Spins and throws water out | Never run dry; keep fingers away |
| 6 | Motor | Turns the impeller | Hot when running; electrician only for repair |
| 7 | Terminal box | Where the cable connects | Electrician only; keep dry and closed |
| 8 | Discharge pipe | Carries water out | Check supports and joints |
| 9 | Pressure gauge | Shows the pressure | Read only; replace a cracked glass |
| 10 | Check valve | Stops back-flow | Arrow with the flow |
| 11 | Isolation valve | Cuts the flow for repair | Close slowly |
| 12 | Base plate | Carries the pump and motor | Bolt it down level |
Safety protocol: starting and running a surface pump (with the electrician)
Before you start
- Electrician confirms the pump is safe to start; guards and covers in place.
- Check the suction pipe, foot valve and priming; isolation valve open; the discharge not blocked.
- PPE: boots, gloves, ear protection if noisy.
While you work
- Do watch the gauge, noise and leaks; do stop at once if it vibrates or runs hot.
- Do not run the pump dry; do not run against a closed valve; do not touch the terminal box.
After
- Switch off at the board; lock out if you will open anything; wait for the motor to stop.
- Drain the pump if frost or long idle; clean the area.
- Report leaks, noise or heat.
Emergency
- Call 112 for any serious injury, fire, shock or someone trapped.
- Switch off the power at the board only if it is safe to reach it; never touch a person who may be in contact with live equipment.
- Give first aid you were trained to give and keep the person warm and still until help arrives. This is not medical advice.
Tools and items for this unit
| Item | What it is and its use | Size or type | Who may handle | Also called |
|---|---|---|---|---|
| Pressure gauge | A dial that reads pressure in bar or kPa. About 10 m of water head equals 1 bar. Fit on the pump outlet to check the duty point. | 0 to 6 or 0 to 10 bar; thread BSP 1/4 or 1/2 inch | You | pressure gage; manometer |
| Flow meter (inline) | A meter in the pipe that shows flow rate (L/s or m3/h) and total volume. Gives a better reading than a bucket on large pumps. | Same size as the pipe | You | flow-rate meter; inline meter |
| Water meter | Counts the total water used, for billing and for the monthly record. | Size of the supply pipe | You | water meter; totaliser |
| Dip meter (water-level tape) | A reel of graduated tape with a probe that beeps or lights when it touches water. It gives the static and pumping water level from a fixed mark on the casing. Use before and during pumping. | Tape 50, 100 or 150 m | You (with trainer) | water level meter; well sounder; dip tape |
| Submersible pump | Pump and motor in one unit hung under the water. The pump end lifts the water and the motor drives it. Use for deep boreholes. | Diameter 3, 4 or 6 inch; kW; single or three phase | Electrician and technician | submersible borehole pump; deep-well pump |
| Pump end and motor | The two halves of a submersible set. The pump end has the stages that lift; the motor sits below it. | Stages; kW | Technician | wet end; stage pack |
| Surface pump (jet or centrifugal) | A pump above ground that sucks water up. Suction lift is limited to a few metres. Use from tanks and shallow sources. | HP; suction size | Technician | centrifugal pump; jet pump; self-priming pump |
| Booster pump | Raises pressure from a tank to taps or sprinklers. | HP | Technician | pressure booster pump |
| Foot valve | A check valve with a strainer at the bottom of a suction pipe. Keeps a surface pump primed. | Suction pipe size | Technician | bottom valve; suction strainer valve |
| Pressure vessel (tank with an air cushion) | A steel tank with an air bag that stops the pump switching on and off too often. | Litres; bar rating | Technician | expansion vessel; accumulator; pressure tank |
| HDPE and uPVC pipe | Two plastic pipes. HDPE is flexible and joined by welding or compression fittings; uPVC is stiff and joined by solvent cement or threads. Both carry a pressure class (PN). | Outside diameter 32 to 110 mm; PN6 to PN16 | Technician | poly pipe; PE pipe; PVC pipe |
| Galvanised steel pipe | Steel pipe with a zinc coat, used where strength is needed. It rusts in aggressive water. | 1 to 3 inch | Technician | GI pipe; steel pipe |
| BSP and NPT threads | Two pipe thread standards. They look alike but do not seal together; match them. | Per fitting | Technician | pipe thread |
Check yourself
- Write the TDH formula in words.
- A pump flow of 900 L/h: how many litres per second?
- Why use the dry-season water level?
Unit 4 · Install the pump, rising main, tank and controls
A good pump fails when it is put in badly. Plan the job, keep it clean, and leave the wires to the electrician.
Competency standard
| Learning outcome | Performance criteria — the trainee… |
|---|---|
| 4.1 Plan an installation | lists materials, tools, people and safety steps |
| 4.2 Assist in lowering a pump | helps lower and secure the pump on a rising main with the lead |
| 4.3 Fit the tank and pipework | fits the tank, valves, float, overflow and pipe supports |
| 4.4 Support the electrician | prepares the site; never touches wiring or the control box |
| 4.5 Commission and record | fills, tests for leaks and records flow and water level |
Range. Household and small-farm submersible systems; the pump lowered by a qualified team. Evidence. Installation checklist; commissioning record; oral questions.
Ask a qualified expert. Pump wiring, earthing and protection are done by an Energy Commission-certified electrician; trainees may only assist with pipe and tank work. Lowering a pump uses heavy parts and a pulley or tripod: follow your supervisor and the maker's instructions, and ask a qualified mechanic or GhIE-registered engineer for lifting questions. Never enter the borehole, tank or pit.
Before the day
- Confirm the driller has finished and the water test and records are handed over.
- Confirm the pump size from Unit 3 and check that it fits inside the casing.
- Get the pump, rising main (drop pipe), safety rope, clamps, cable ties, check valve, tank, valves, float and a lockable cap.
- Brief everyone: one lead, clear signals, keep hands out from under loads.
Installing (supervised)
- Clean the borehole top and cover the opening between steps so nothing falls in.
- Lay out the rising main and cable on clean sheeting. Keep them clean.
- Join the pump to the first pipe length; attach the safety rope or wire as the maker says. A non-return (check) valve sits near the pump or at set points as the maker says.
- Lower pipe by pipe, fixing the cable to the pipe with clips or tape at set spaces. The cable must not be cut, pinched or scraped.
- Stop at the planned setting depth (Unit 3). Secure the pipe to the well cap with the clamp.
- The electrician connects the control box and checks the supply, earthing and protection.
- The first run: open the valve slightly, run the pump on a trial with the electrician present, and watch for sand or air.
The tank and pipework
- Keep the tank on a strong, level stand: a full 1,000-litre tank weighs about a tonne.
- Use isolation valves on each side of the pump and a check valve after it; fit a float switch and an overflow.
- Keep the tank lid closed. For pipe, fittings and pressure tests, see Basic Plumbing in this library.
Dry-run and other protections
A submersible pump can burn out if it runs with no water, with the supply low or with the valve closed. Ask the electrician about protection (low-water or dry-run protection, overload protection) and about a safe way to start and stop.
Commissioning record
- Pump make, size and serial number; setting depth
- Static water level before; water level while pumping
- Flow measured with bucket and stopwatch
- Pressure or leak test result after one hour
- Water clear? Sand? Air?
- Electrician's name; date
- Photo of the installed cap and tank
Pipe and cable
Example: pump setting 40 m deep; the tank inlet is 8 m above ground and 12 m away across the ground. (1) How many metres of rising main and pipe in total, ignoring fittings? (2) Pipe comes in 6-metre lengths: how many lengths? (3) Cost at GH¢35 per length (example)?
Rig installation
- Plan the job on a sheet: materials, tools, people, steps.
- Install a small pump and tank on the training rig with the electrician: pipe, valves, float, overflow.
- Keep every part clean; cover openings.
- The electrician connects power. Stay clear of the control box.
- Commission: fill, check leaks, time the flow, record water levels.
- Complete the commissioning record in your logbook.
Customer handover note
Write a one-page note to a customer: what was installed, what to check each week, who to call, and what they must never do (for example open the control box).
Motor cooling, starts and cable checks (maker data governs)
- Cooling. The motor is cooled by the water that flows past it. Grundfos recommends installing the motor above the well screen so water passing the motor cools it, and gives a section on maximum water temperature and minimum velocity past the motor. Use the maker's figure for your pump. If the pump sits at or below the screen, or in a large casing, ask the supplier about a flow sleeve (a tube round the pump that forces the water past the motor).
- Starts per hour. Motors have a maximum number of starts per hour in the maker's manual. A pressure vessel (a tank with an air cushion) cuts the number of starts.
- Cable size and voltage drop. The electrician chooses the cable. To see why size matters: for a single-phase 230 V motor drawing 8.5 A on a 60 m cable, voltage drop = 2 × current × length × resistivity ÷ cable area. With copper resistivity 0.0175 ohm mm2 per m: 2.5 mm2 gives 2 × 8.5 × 60 × 0.0175 ÷ 2.5 = 7.1 V (3.1 percent of 230 V); 4 mm2 gives 4.5 V (1.9 percent). The acceptable drop is for the electrician and the wiring rules to decide (not verified for Ghana).
- Insulation resistance. The electrician tests the motor and cable with an insulation tester (megger) before and after installation. Makers give their own acceptance values and they differ, so record the reading and use the maker's table; a falling reading means moisture or damage. The Grundfos manual has an insulation-resistance table for motors of 600 V or less.
Water hammer: a simple surge check
When flow stops fast, pressure can jump. The Joukowsky relation gives the worst-case rise: pressure rise = water density × wave speed × change in velocity. In PVC pipe the wave speed is of the order of 400 m/s (sources give 350 to 600); in steel it is over 1,000 m/s. Example: water at 1,000 kg/m3, 400 m/s and a velocity change of 0.6 m/s gives 1,000 × 400 × 0.6 = 240,000 Pa = 2.4 bar; for 1.5 m/s it is 600,000 Pa = 6 bar. Add the surge to the working pressure and compare with the pipe's pressure class from the data sheet. Slow-closing valves, air valves and check valves placed well reduce the surge. An engineer checks the real surge on larger systems.
Ask a qualified expert. Pump wiring, earthing, protection and testing are for an Energy Commission-certified electrician. Water hammer and pressure checks are for a GhIE-registered engineer on larger systems. This is general information, not electrical or engineering advice.
Parts of a submersible pump set, every part labelled
| No. | Part | What it does | Safety rule |
|---|---|---|---|
| 1 | Rope eye | Holds the safety rope | Use a rope rated above the set's weight |
| 2 | Discharge adaptor | Thread for the rising main | Seal with the right thread seal; do not cross-thread |
| 3 | Check valve | Stops the pipe draining | Fit in the flow direction |
| 4 | Pump end | Lifts the water in stages | Never touch when powered |
| 5 | Cable guard | Protects the cable against rubbing | Fit at the maker's spacing |
| 6 | Intake strainer | Keeps sand out | Do not block |
| 7 | Motor | Drives the pump end | Never touch when powered; oil-filled or water-filled per maker |
| 8 | Motor lead and cable splice | Connects the motor to the drop cable | Electrician only; use a waterproof kit |
| 9 | Flow sleeve | Forces water past the motor | Use where the maker or driller says |
| 10 | Coupling | Joins pump end and motor | Never separate without the maker's guide |
Safety protocol: lowering or pulling a submersible pump
Before you start
- Electrician has switched off, locked out and tested the circuit dead; you have seen the lock.
- Check the tripod, pulley or hoist, ropes and clamps, and the safe working load tags; the trained crew leads.
- PPE: hard hat, boots, gloves, glasses; keep a clear area round the borehole.
- Safety rope fixed to the pump; cable clips ready; wellhead cap and a clamp ready so nothing falls in.
While you work
- Do lower and lift slowly in pairs or more; do clip the cable to the pipe at the maker's spacing.
- Do not stand under a load; do not leave a pipe unclamped over the hole.
- Do not force a stuck pump; stop and ask the driller.
After
- Cap the borehole; coil cables; clean tools; keep lifting gear dry and inspected.
- Record the setting depth, cable length and pump details.
- Report any damaged cable or pipe.
Emergency
- Call 112 for any serious injury, fire, shock or someone trapped.
- Switch off the power at the board only if it is safe to reach it; never touch a person who may be in contact with live equipment.
- Give first aid you were trained to give and keep the person warm and still until help arrives. This is not medical advice.
- If the pump or pipe drops in, do not reach in: tell the driller; never enter the casing.
A real pressure tank, pump and switch
| No. | Part | What it does | Safety rule |
|---|---|---|---|
| 1 | Pressure tank | Holds water under pressure so the pump does not start and stop too often | Never open, drill or weld a tank; it holds pressure, so call the installer |
| 2 | Pressure gauge | Shows the pressure in the tank | Read it and record it; report a reading outside the set range |
| 3 | Pump | Pushes the water into the tank and the pipes | Keep hands clear; switch off at the board before any work near it |
| 4 | Electric motor | Turns the pump | Keep it dry; never open the terminal box: electrician only |
| 5 | Pressure switch (grey box) | Switches the pump on and off at the set pressures | The electrician sets it; never open or adjust it |
Parts of a pressure vessel and switch set, every part labelled
| No. | Part | What it does | Safety rule |
|---|---|---|---|
| 1 | Pump | Pushes water into the system | See the pump table |
| 2 | Check valve | Stops back-flow | Arrow with the flow |
| 3 | Pressure gauge | Shows the pressure | Do not exceed the vessel's rating |
| 4 | Pressure switch | Starts and stops the pump | Electrician sets it; do not alter |
| 5 | Relief valve | Opens at the set pressure | Never block or plug it; point its outlet safely |
| 6 | Pressure vessel | Holds water and an air cushion | Never weld or drill it; release pressure before work |
| 7 | Air cushion | Soaks up pressure changes | Check the air pressure only when the water is drained and the pump off |
| 8 | Isolation valve | Cuts the supply | Close slowly |
| 9 | To the taps | Supply |
Ask a qualified expert. Pressure vessels, relief valves and switches hold stored energy. Settings and tests are for a qualified mechanic or GhIE-registered engineer and a certified electrician.
Parts of three instruments: pressure gauge, clamp meter and insulation tester
| No. | Part | What it does | Safety rule |
|---|---|---|---|
| 1 | Gauge dial and scale | Shows pressure in bar | Choose a gauge range 1.5 to 2 times the working pressure (good practice) |
| 2 | Pointer | Shows the value | Tap lightly; never knock |
| 3 | Threaded stem | Screws into the pipe tapping | Seal with PTFE tape; do not overtighten |
| 4 | Clamp jaws | Surround one wire to read current | Clamp ONE conductor only; jaws closed and clean |
| 5 | Trigger | Opens the jaws | Do not force |
| 6 | Display and range selector | Show and set the reading | Set the range before you clamp; never above the rated voltage |
| 7 | Tester display | Shows resistance in megohms | Read after the reading settles |
| 8 | Test voltage button | Applies the test voltage | Press only with the circuit isolated and the leads connected as the electrician instructs |
| 9 | Lead sockets | Connect the test leads | Use undamaged leads; never use damaged leads |
Safety protocol: taking electrical readings (the electrician reads; you record)
Before you start
- Electrician isolates, locks out and tests dead before any lead is connected for a resistance test.
- Inspect the instrument and leads for damage; check the instrument's category rating.
- Insulating gloves and glasses as the electrician decides; keep the area dry.
While you work
- Do record the reading, range and time; do keep the instrument dry.
- Do not hold the probes while the test voltage is on; do not use a megger on a live circuit.
- Do not touch the test leads' metal.
After
- Discharge the circuit as the electrician instructs; remove leads and lock; store the instruments in their cases.
- Write the readings in the record form.
- Report a damaged instrument.
Emergency
- Call 112 for any serious injury, fire, shock or someone trapped.
- Switch off the power at the board only if it is safe to reach it; never touch a person who may be in contact with live equipment.
- Give first aid you were trained to give and keep the person warm and still until help arrives. This is not medical advice.
Tools and items for this unit
| Item | What it is and its use | Size or type | Who may handle | Also called |
|---|---|---|---|---|
| Tripod, pulley and hoist | Lifting gear for lowering and pulling pump and pipe. Trained people only. Never exceed the safe working load. | Safe working load in kg on the tag | Trained crew | A-frame; lifting tripod |
| Pipe clamp (lifting clamp) | Holds the pipe at the wellhead while the next length is joined. | Pipe size | Trained crew | lifting clamp; pipe elevator |
| Safety rope or wire, cable clips and tape | A rope fixed to the pump that holds it if a pipe joint fails. Clips and tape hold the cable to the pipe. | Rated for the pump weight plus margin | Technician | safety wire; lifting rope |
| Torque arrestor | A rubber collar that stops the pump set twisting at start-up. | Fits the casing and pump size | Technician | torque arrester; anti-twist collar |
| Cable splice kit (heat-shrink) | Waterproof joint between motor lead and drop cable. A bad joint is a common cause of burn-out. | Size to suit the cable | Electrician | cable joint kit; waterproof joint |
| Drop cable (submersible cable) | Waterproof cable from the control box down to the motor. | mm2; cores; length | Electrician | submersible cable; flat pump cable |
| Wellhead (well cap and seal plate) | The top closure of the borehole. It carries the pipe and cable and keeps dirt and insects out. | Fits the casing size | Technician | well cap; well seal; sanitary cap |
| Insulation tester (megger) | Applies a test voltage (often 500 V DC, but use the maker's value) to find leaks from the motor or cable to earth. Used before and after pump installation. | 500 V or 1,000 V | Electrician | insulation resistance tester; megohmmeter |
| Clamp meter | Reads motor current by clamping round one wire, without cutting it. Compare the reading with the motor nameplate current. | AC amps range to suit the motor | Electrician | clamp-on ammeter; tong tester |
| Multimeter | Reads volts, ohms and sometimes amps. Used by the electrician; you only watch and record the reading. | Check the category rating on the label | Electrician | multitester; volt-ohm meter |
| Voltage tester (phase tester) | Proves a wire is live or dead before any work. Never trust a switch; test, then work. | Rated for the voltage | Electrician | test pen; voltage detector |
| Lock and tag (lock-out set) | A padlock and tag put on the switch so nobody can switch on while work is being done. Electrician rules apply. | Per site | Electrician | padlock and tag; lockout kit |
| Check valve (non-return valve) | Lets water flow one way only so the pipe does not drain and the pump does not spin backwards. | Same size as the pipe; spring or swing | Technician | non-return valve (NRV); one-way valve |
| Air release valve and vacuum breaker | Let trapped air out of a pipe and let air in to prevent a vacuum. Fit at high points. | Size to suit the pipe | Technician | air vent; air release valve |
| Gate, ball, globe and butterfly valves | Four valve types. Gate and ball valves are for on or off; globe valves throttle flow; butterfly valves are for large pipes. | Pipe size; PN | Technician | sluice valve; stop valve |
| Pressure relief valve | Opens at a set pressure to protect pipe and tank. | Set pressure in bar | Technician | safety valve; pressure relief |
| Adaptors, nipples, unions and flanges | Join the pump to the pipe and one pipe to another. | BSP or NPT thread; size | Technician | pipe fittings; couplings |
| Chain wrench | A wrench with a chain that grips large pipe without crushing it. | For pipe up to 6 inch | Technician | strap wrench |
| Float switch (tank) | A float that rises with the water and stops or starts the pump at set levels. | Type to suit the control | Electrician and you | float control; tank level switch |
| Level probe (borehole) | Sensor that cuts the pump if the borehole water falls too low. | Cable length to suit setting depth | Electrician | dry-run probe; low-level electrode |
| Pressure switch | Starts and stops the pump by pressure in a pressure system. | Set range in bar | Electrician | pressostat; pressure control |
| Overload relay, dry-run and phase-failure protection | Devices that stop the motor if it overheats, runs dry or loses a phase. | Per maker | Electrician | thermal overload; motor protector |
| Earth rod, earth wire and surge arrester | Give fault current a safe path to ground and lead lightning surges away. Electrician only. | Per electrician | Electrician | grounding rod; earth electrode |
| Breaker (MCB), RCD and fuse | Switch off on overload or earth fault. The RCD protects people from shock. | Amps; RCD mA set by the electrician | Electrician | circuit breaker; MCB; trip switch |
Check yourself
- Who connects the power to the pump?
- Why cover the borehole between steps?
- Name two parts that go in the pipe system after the pump.
Unit 5 · Solar pumping and hybrids
A farm in the sun can lift its own water. But solar pumping needs the right licences and the right sums.
Competency standard
| Learning outcome | Performance criteria — the trainee… |
|---|---|
| 5.1 Explain solar pumping | names the parts and why a tank can replace a battery |
| 5.2 Size a solar pump roughly | works out hydraulic, electrical and panel watts |
| 5.3 Know the licences | states who may install a solar water pump |
| 5.4 Compare options | compares solar, grid and generator for a farm |
Range. One small farm. Evidence. Sizing sheet; licence questions.
Ask a qualified expert. Solar water pump installation needs an Energy Commission licence and a certified electrician for the solar side. Panels make power in daylight; never touch the wiring. Ask a GhIE-registered engineer for system design. This is general information, not electrical advice. See Solar Energy in this library for solar basics.
How it works
A solar pump system has panels, a mounting, a pump controller, a surface or submersible pump, and pipes or a storage tank. A tank can replace batteries as storage. The higher you lift water and the more you lift, the more energy you need.
The licence
In Ghana, a solar water pump installer needs an Energy Commission licence for solar PV water pump service providers, a CEWP certificate for the solar side and an NVTI Grade 1 plumbing certificate for the pump side. Commercial renewable work needs an Energy Commission licence, and used or refurbished equipment is not allowed.
Sizing roughly
Hydraulic power (W) = total head (m) × flow (litres per second) × 9.81 Electrical power = hydraulic power ÷ pump efficiency (30–40% for planning) Panel watts = electrical power ÷ 0.8
Example from Unit 3: 4,000 litres in a pumping window of 6 hours (an example; the installer decides from local sunshine). Flow = 4,000 ÷ 6 = 667 L/h = 0.185 L/s. Head 36 m. Hydraulic = 36 × 0.185 × 9.81 = 65 W. Electrical at 35% = 187 W. Panels = 187 ÷ 0.8 = 234 W. A designer adds margin for cloud, dust and wiring.
Pump price example
In Greater Accra listings in October 2026, a DC solar 1 HP surface pump was about GH¢6,500. A solar borehole project (drilling, solar pump and tank) was estimated at GH¢25,000 to 55,000 by a vendor blog. Examples only; get written quotes from licensed installers.
Solar needs a tank. If the tank is small or nobody uses the water when the sun shines, the system wastes its output. Size the tank to match the day's use.
Solar sums
Example: demand 3,000 L in a pumping window of 5 hours, head 35 m. (1) Flow in L/s. (2) Hydraulic power. (3) Electrical power at 35%. (4) Panel watts.
Solar pump visit and options table
- Visit a solar pump (or a demonstration) and name each part.
- Write down the pump size, panel watts, tank size and head.
- Compare with a grid pump and a generator pump for the same farm: running cost, noise, fuel, maintenance, who may install.
- Put the comparison in a table in your logbook.
Ask an installer
Ask a solar installer whether they hold the Energy Commission licence and a CEWP certificate. Write their answers and the date.
Matching the solar array to the pump
- The controller or inverter datasheet gives the allowed array voltage and power. Do not exceed it. The array is sized to the pump power and the sunshine, and solar water pumps in Ghana need a licensed installer.
- Daily water = pump flow at the site's head × hours of useful sun. Example (all numbers are examples): a solar pump gives 3 m3/h at the design head and the array drives it for 5 useful hours: 3 × 5 = 15 m3 per day.
- A raised tank is a cheap way to store energy for night and cloudy spells.
- Solar panel wires stay live in daylight; leave them to the licensed installer.
Ask a qualified expert. Solar pump design and wiring belong to a licensed solar installer and a certified electrician. This is general information, not electrical advice.
A real solar panel array for a pump
| No. | Part | What it does | Safety rule |
|---|---|---|---|
| 1 | Solar panels | Make direct-current electricity in daylight | Never touch the wiring: panels are live whenever there is light |
| 2 | Mounting frame | Rails and struts hold the panels at an angle to the sun | Do not climb on it; the installer checks the bolts |
| 3 | Steel pole | The single post that holds the frame | Keep the ground around it clear; do not lean ladders on it |
| 4 | Concrete base | The footing that keeps the pole upright | Report cracks or any lean to the installer |
Parts of a solar pump system, every part labelled
| No. | Part | What it does | Safety rule |
|---|---|---|---|
| 1 | Solar panel array | Makes DC power from sunlight | Live whenever the sun shines; installer only |
| 2 | Mounting frame | Holds the panels up | Fix firmly against wind; do not climb |
| 3 | DC isolator switch | Cuts the DC supply | Switch off before any work; still treat panels as live |
| 4 | Controller with MPPT | Drives and protects the pump | Closed; installer only |
| 5 | Level probe | Stops the pump when water is low | Check it is at the right depth |
| 6 | Solar pump | Lifts the water | Never touch when powered |
| 7 | Rising main | Carries water up | Check supports |
| 8 | Tank on a stand | Stores water | Stand level and strong; never enter |
| 9 | Float switch | Stops the pump when the tank is full | Check it moves freely |
| 10 | Earth rod | Gives fault current and lightning a path to ground | Electrician or installer only |
| 11 | Wellhead and casing | Closes the borehole | Never enter |
Safety protocol: working near a solar pump system
Before you start
- Only the licensed installer works on panels and wiring; you may clean panels from the ground with a wet cloth only if the installer allows.
- Check the isolator is off for any pipework; remember the wires stay live in daylight.
- PPE: gloves, glasses, boots; no ladders unless the installer is present.
While you work
- Do keep to pipework, tank and valve checks; do record flow and tank level.
- Do not touch cables or the controller; do not walk on the panels.
After
- Switch the isolator back as the installer says; close covers.
- Write the readings; report shading, damage or loose fixings.
Emergency
- Call 112 for any serious injury, fire, shock or someone trapped.
- Switch off the power at the board only if it is safe to reach it; never touch a person who may be in contact with live equipment.
- Give first aid you were trained to give and keep the person warm and still until help arrives. This is not medical advice.
Tools and items for this unit
| Item | What it is and its use | Size or type | Who may handle | Also called |
|---|---|---|---|---|
| Solar pump and controller | A pump driven by solar panels. The controller (with MPPT) converts and protects. | Array kWp; voltage; flow and head | Licensed installer | solar borehole pump; PV pump |
| Solar panel (PV module) and array | A panel makes DC power in daylight. An array is panels joined together. Wires can be live even when the pump is off. | Wp per panel; number | Licensed installer | solar panel; PV panel |
| MPPT (maximum power point tracker) | Electronics in the controller that keeps the panels at their best working point as sun changes. | Per controller | Licensed installer | solar pump controller; charge controller |
| Control box or starter (DOL, star-delta) | Switches and protects the motor. Opening it is electrician-only work. | kW; phase | Electrician | starter; motor starter; control panel |
| Level probe (borehole) | Sensor that cuts the pump if the borehole water falls too low. | Cable length to suit setting depth | Electrician | dry-run probe; low-level electrode |
| Float switch (tank) | A float that rises with the water and stops or starts the pump at set levels. | Type to suit the control | Electrician and you | float control; tank level switch |
| Generator | Backup power. See Small Engines in this library. Size by the motor starting current, not only its running power. | kVA | Electrician | gen set; standby generator |
Check yourself
- Why can a tank replace a battery?
- Who may install a solar water pump?
- Panels = electrical power ÷ what number?
Unit 6 · Water quality, treatment and disinfection
Treat the problem the test finds, not the one you guess. And never treat water for drinking without a laboratory test.
Competency standard
| Learning outcome | Performance criteria — the trainee… |
|---|---|
| 6.1 Read a water test | compares results with the draft standard values |
| 6.2 Take a good sample | takes, labels and delivers a sample correctly |
| 6.3 Explain treatment options | explains aeration, settling, filtration and disinfection |
| 6.4 Calculate a disinfection dose | works out bleach volume for a tank or borehole |
| 6.5 Record and advise | records results and says when to see an expert |
Range. Household and small-farm borehole water. Evidence. Test reading; dose calculation; oral questions.
Ask a qualified expert. Water quality and treatment advice needs an expert. Ask the Water Resources Commission and test at an accredited laboratory. Chlorine is a chemical: use gloves and glasses, never mix it with other cleaners, and keep children away. Strong chlorine in a borehole should be done with the driller or pump installer and a qualified person. Anyone who is ill should see a doctor or nurse. This is general information, not medical or chemical advice.
Reading a water test
| Quality | Draft standard value |
|---|---|
| Turbidity | not above 5 units |
| pH | 6.5 to 8.5 |
| Iron | not above 0.3 mg/L |
| E. coli, total coliform | none in 100 ml |
That was a public review draft, so check the final standard. Sources differ on the iron limit (not verified). In a Western Region study of Mpohor, borehole iron ranged from 0.17 to 0.58 mg/L. An accredited Ghana Standards Authority laboratory is the place for a drinking-water test.
Treatment options (match the test)
| Problem | Common approach (general) | Who decides |
|---|---|---|
| Iron or manganese (taste, stains) | Aerate (let air in), let it settle, filter | Laboratory result and a treatment specialist |
| Muddy water (turbidity) | Settle and filter; check the borehole for sand | Driller or specialist |
| Germs | Disinfect with chlorine; find the cause (pollution, open cap) | Laboratory and a health worker |
| Other chemicals (for example fluoride) | Specialist treatment or another source | Laboratory, WRC and a specialist |
Strong chlorine in water that holds iron or manganese can form solids that clog the pump.
Disinfecting a tank
To sanitise a household tank, use about 1 to 1.5 fluid ounces (2 to 3 tablespoons) of plain household bleach (5.25%) for every 500 US gallons, stir, close the tank and wait at least 8 hours; do not drink until the smell has gone. Convert litres first (1 US gallon is about 3.8 litres). Never enter the tank.
Shock chlorination of a borehole (foreign guidance)
Guidance from Ontario (Canada) says to disinfect a new well with an initial dose of about 50 to 200 mg/L of free chlorine soon after installation, then flush the strongly chlorinated water away and test for bacteria. Penn State Extension (USA) also recommends shock chlorination after a well is built or a pump is installed. This is foreign guidance; the Ghana rules were not verified. Pumping chlorinated water on to crops, into streams or into a pond can do harm: ask the Environmental Protection Agency or the WRC where to discharge it (not verified).
Tools to measure chlorine in water are described in a WHO technical note.
Dose for a borehole (example, foreign method)
Casing diameter 150 mm (0.15 m); depth 55 m; static water level 18 m. Target 50 mg/L free chlorine. Household bleach is 5% (50 g of chlorine per litre).
(1) Height of water in the casing. (2) Volume of water in the casing in litres (area of the circle = 3.14 × radius²; 1 m³ = 1,000 L). (3) Grams of chlorine needed at 50 mg/L. (4) Litres of 5% bleach needed.
Test reading and tank dose
- Take two sample lab reports (real or made-up). Compare each result with the table and mark pass or fail.
- For each failed result, write what you would advise (retest, specialist, treatment) and what you would tell the customer to ask the WRC.
- Practise taking a sample bottle correctly.
- With the trainer, sanitise a small tank from outside using the dose, and record the date, size and dose.
- Record everything in your logbook.
Laboratory visit or call
Ask an accredited laboratory what tests a "drinking-water package" includes and what it costs. Write the answer and date.
Salt is common in borehole water, especially near the coastal shoreline. Test conductivity before pumping on to crops or tanks. No Western Region yield figures were found for this book, so none are printed.
Water quality parameter table
| Parameter | Ghana draft limit | WHO guideline (international) | Likely cause in boreholes | Usual action |
|---|---|---|---|---|
| E. coli | None in 100 mL | None detectable in 100 mL | Surface pollution; open cap; bad seal | Find the cause; disinfect; retest |
| Turbidity | Not above 5 NTU | Not stated here | Sand, clay, new borehole | Develop; filter; check screen |
| pH | 6.5 to 8.5 | No health-based value | Rock chemistry | Ask the laboratory |
| Iron | Not above 0.3 mg/L (draft; sources differ) | Taste problem, not a health limit | Weathered rock | Aerate and filter |
| Manganese | Not found in the draft read | WHO has a 2022 fact sheet; value not verified here | Rock chemistry | Specialist advice |
| Nitrate | Not verified | 50 mg/L (as nitrate; check the WHO text) | Farming, latrines | Move or treat; ask the laboratory |
| Fluoride | Not verified | 1.5 mg/L (check the WHO text) | Rock | Specialist treatment or another source |
| Arsenic | Not verified | 0.01 mg/L (check the WHO text) | Mining areas in some studies (not verified here) | Specialist only |
| Salt (chloride, conductivity) | Not verified | Taste threshold: check the WHO text | Coastal water | Salt cannot be removed with a filter |
The Ghana limits come from a 2021 public review draft; the final standard was not read. The WHO values are international: check against the Ghana Standards Authority text when it is read.
Ask a qualified expert. Water quality results and treatment need an accredited laboratory and the Water Resources Commission. Chlorine is a chemical: wear gloves and glasses, never mix it with other chemicals, and keep children away. Anyone who is ill should see a doctor or nurse. This is general information, not medical advice.
Treatment selection
| Problem | Treatment | Cannot fix |
|---|---|---|
| Iron and manganese | Aeration, settling, sand filter | Not for use where arsenic or fluoride is the problem |
| Germs | Chlorine (dose from the table in Appendix B), contact time, flush | Chemical pollution |
| Salt | Another source or specialist membrane plant | A sand or cartridge filter does nothing |
| Arsenic, fluoride | Specialist treatment or another source | Home filters |
Safety protocol: shock chlorination of a borehole (supervised, general good practice)
Before you start
- The licensed driller or an installer with a qualified expert leads. Ask the Environmental Protection Agency or the WRC where the chlorinated water may be discharged (not verified).
- Read the bleach or HTH label: strength and handling.
- PPE: chemical gloves, goggles, apron, boots; work in open air; water for rinsing ready.
- Calculate the dose with table B4; measure with a clean jug.
While you work
- Do add chlorine to water, not water to chlorine; do pour slowly and keep the pump off while the solution settles.
- Do not mix with other chemicals, acids or fuel; do not breathe the fumes.
- Do not let the strong chlorine reach people, animals, crops or streams.
After
- Close the borehole; flush as planned; put a notice on every tap: not for drinking.
- Test chlorine and bacteria later with the laboratory.
- Store chemicals closed, labelled and away from children; write the record C7.
Emergency
- Eyes: rinse for 15 minutes with clean water and seek a nurse or doctor (first aid, not medical advice). Swallowed or breathed in: move to fresh air and call 112.
Tools and items for this unit
| Item | What it is and its use | Size or type | Who may handle | Also called |
|---|---|---|---|---|
| Sample bottles | Sterile bottles from the laboratory for germ tests and clean bottles for chemistry. The laboratory tells you which and how to keep the sample. | 250 or 500 mL | You | sample container; sample jar |
| pH meter or pH strip | Shows how acid or alkaline the water is, on a scale of 0 to 14. Use on a fresh sample. | 0 to 14 | You | pH tester; pH strip |
| Conductivity (EC) or TDS meter | Measures dissolved salts as electrical conductivity (uS/cm) or total dissolved solids (mg/L). A quick check for salty water, important near the coast. Use before and during pumping. | 0 to 2,000 uS/cm or wider | You | EC meter; TDS meter; salinity meter |
| Turbidity tube or meter | A clear tube or meter that shows how cloudy the water is (NTU). Use for muddy or sandy water. | NTU range | You | turbidity meter; clarity tube |
| Chlorine test kit (DPD comparator) | A small kit that turns pink in proportion to free chlorine. Use after disinfection to check the level. | 0 to 5 mg/L | You | chlorine comparator; pool test kit |
| Iron test kit | A quick field kit for iron in mg/L. Does not replace a laboratory test. | 0 to 5 mg/L | You | iron test kit; colour test kit |
| Hardness test kit | A drop-count kit that shows how hard the water is (scale on pipes and heaters). | mg/L as CaCO3 | You | hardness drop test |
| Sand filter, aeration tower and cartridge filter | Treatment units. Aeration plus sand filtration removes iron and manganese. Cartridge filters catch fine particles. They do not remove salt. | Flow rating | Technician | iron filter; aeration unit |
| Chlorine (HTH granules or liquid bleach) | The disinfectant. HTH is strong granular calcium hypochlorite (strength on the label); household bleach is weaker (often 3.5 to 5 percent: read the label). | Strength on the label | You (with trainer) | calcium hypochlorite; sodium hypochlorite (bleach) |
| Measuring jug and clean bucket | Measure and mix the dose of chlorine. | 1 L jug; 10 to 20 L bucket | You | measuring cup |
| PPE: boots, gloves, safety glasses, hard hat and apron | Protective gear for the eyes, hands, head and feet. Chemical gloves and glasses are needed for chlorine. | Fit and size per person | You | safety gear; protective clothing |
| Flushing valve (washout) | Valve used to flush dirty water out of the system after disinfection. | Pipe size | Technician | washout valve; drain valve |
| Thermometer | Reads the water temperature. Warm water cools a motor less well and changes chlorine action. | 0 to 50 C | You | water thermometer |
| Test strips and colour comparator | Small paper strips or colour charts for quick checks on pH, chlorine and hardness. | Per product | You | test paper; colour chart |
Check yourself
- What is the draft standard limit for iron?
- Why can strong chlorine harm a pump in iron-rich water?
- Where should a drinking-water test be done?
Unit 7 · Your location, business ideas and marketing yourself
Level 1 gave you a small service. Level 2 lets you charge for knowledge: siting advice, quote checks, sizing sheets and commissioning.
Competency standard
| Learning outcome | Performance criteria — the trainee… |
|---|---|
| 7.1 Choose a good location | picks areas with many boreholes and few skilled helpers |
| 7.2 Plan services | lists lawful services for Level 2 skills |
| 7.3 Price a job | works out materials, labour, overhead and profit |
| 7.4 Market yourself | uses WhatsApp Business, referrals and a portfolio |
| 7.5 Know the paperwork | knows the business name, permit and licence questions |
Range. One small service business. Evidence. Price sheet; marketing plan.
Ask a qualified expert. Registration, tax and loans need an expert. This is general information, not legal or financial advice. Check with the Assembly, the Ghana Revenue Authority (GRA) or a qualified accountant. Never advertise drilling, pump wiring or solar installation unless you hold the licence.
Services you may lawfully offer at Level 2
| Service | Notes |
|---|---|
| Site visit and pollution-distance sketch | Hand over a one-page note; advise asking the WRC |
| Quote comparison for owners | Explain what each quote includes |
| Pump sizing sheet | Marked as a helper's calculation; an engineer or supplier checks big systems |
| Pump-and-tank pipework with a licensed plumber | Electrician does wiring |
| Tank cleaning from outside; water-sampling runs | Laboratory tests |
| Hand pump area-mechanic helper | Under the committee or mechanic |
Price a job (example)
Pump-and-tank pipework job
Example costs: pipe and fittings GH¢450; valves and float GH¢220; transport GH¢80; a helper for one day GH¢120; your own labour GH¢250. You want a 20% mark-up on the total cost. (1) Total cost. (2) Selling price. (3) Profit in cedis. (4) Profit as a percentage of the selling price (margin).
Marketing
- WhatsApp Business: your name, services, area; a catalogue of services.
- Referrals: ask each customer to tell two others.
- Portfolio: dated photos of finished tanks and pipework, with permission.
- Google Business Profile once you have steady customers.
- Be honest about what you do: pipework and advice, not drilling or wiring.
Paperwork
A business name for a sole proprietor was GH¢130 to register in 2026, GH¢70 a year to renew. Assembly operating permits and fees are set by the Assembly. Ask the Assembly which permit applies. Hand-pump caretakers work under the community's committee and the area mechanic model.
Accessibility
Persons with disabilities can do many tasks here. Under the Persons with Disability Act 2006 you have the right to training and work. Workable tasks: record keeping, quote comparison, sizing sheets, water-sampling runs, parts sales, customer care and online marketing. Helpful changes: a helper for lifting, a seat at the bench, large-print or voice checklists and clear step cards. Ask the Assembly or the Department of Social Welfare about support.
Service menu and price list
- Choose three services you will offer.
- Price each one with the method above.
- Write a WhatsApp Business message with the menu.
- Make a portfolio page with two photos and notes from your training jobs.
- Show it to your trainer.
Two referrals
Ask two people with tanks or pumps who else may need your service. Write down the names (first names only) and how you will follow up.
Tools and items for this unit
| Item | What it is and its use | Size or type | Who may handle | Also called |
|---|---|---|---|---|
| Hacksaw, pipe wrench, spanners and vice | The plumber's hand tools: cut pipe, grip and turn pipe, tighten bolts, hold work. | Pipe wrench 14 to 24 inch | You | pipe saw |
| Chain wrench | A wrench with a chain that grips large pipe without crushing it. | For pipe up to 6 inch | Technician | strap wrench |
| PTFE tape, jointing compound and solvent cement | PTFE tape seals threaded joints; jointing compound seals larger threads; solvent cement welds uPVC pipe joints. | Per product label | You | thread seal tape; plumber's tape |
| Spares kit (seals, rod couplings, bobbins and bolts) | A box of the parts that wear most, kept by the committee so repairs are quick. | Per pump model | Committee and mechanic | seal kit; repair kit |
| Water meter | Counts the total water used, for billing and for the monthly record. | Size of the supply pipe | You | water meter; totaliser |
Check yourself
- What is the difference between mark-up and margin?
- Name two lawful Level 2 services.
- A job costs GH¢500 and sells for GH¢650. What is the profit?
Glossary
| Term | Meaning |
|---|---|
| Competent / Not Yet Competent | The two possible results of a CBT assessment |
| Constant-rate test | Pumping at a steady rate for hours while recording the water level |
| Drawdown | How far the water level drops when pumping |
| Operating point | Where the pump curve meets what the system needs |
| Pump curve | The maker's graph of flow against head |
| Specific capacity | Yield divided by drawdown |
| Static water level | Water depth when nobody is pumping |
| Step test | Short tests at rising pumping rates |
| TDH | Total dynamic head: the total height the pump must lift against |
| Turbidity | Cloudiness of water |
| Yield | How much water a borehole gives |
Logbook
Copy these pages into an exercise book. Your logbook is part of your assessment evidence.
- Unit 1: site sketch; distances; quote comparison
- Unit 2: pumping-test sheet; log reading
- Unit 3: sizing sheet; two pump curves
- Unit 4: installation plan; commissioning record
- Unit 5: solar visit; options table
- Unit 6: water-test reading; dose calculation; tank record
- Unit 7: price list; marketing message; referrals
- Every homework, dated
Self-check quiz
- Name two things a borehole must be kept away from.
- Why compare what each quote includes?
- What is specific capacity?
- Give two signs of a poor drilling job.
- Write the TDH formula in words.
- Flow 1.5 m³/h is how many L/s?
- Who connects power to a pump?
- What is the check valve for?
- Who may install a solar water pump?
- What is the draft standard limit for iron?
- Why test drinking water at an accredited laboratory?
- Mark-up 25% on cost GH¢400: what is the price?
Appendix A · Formulas page
All the formulas of this book in one place. Each has a worked example.
Ask a qualified expert. Formulas for pumps, pressure, electrical power and chemical dose must be checked by a qualified engineer, certified electrician or the pump maker before any job. This is general information.
| Quantity | Formula | Worked example |
|---|---|---|
| Yield | Volume ÷ time | 20 L in 40 s = 0.5 L/s = 1.8 m3/h |
| Drawdown | Pumping level − static level | 21 − 14 = 7 m |
| Specific capacity | Yield ÷ drawdown | 2.4 ÷ 7.0 = 0.34 m3/h per m |
| Step test | s = BQ + CQ2 | B = 1.37, C = 0.57 (Appendix D) |
| TDH | Static level + drawdown + lift + friction + pressure head | 18 + 7 + 8 + 3 = 36 m |
| Hydraulic power | Head (m) × flow (L/s) × 9.81 | 36 × 0.278 × 9.81 = 98 W |
| Electrical power | Hydraulic power ÷ overall efficiency | 98 ÷ 0.35 = 280 W |
| Energy | Power (kW) × hours | 1.0 kW × 3 h = 3 kWh |
| Friction (Hazen-Williams, SI) | h = 10.67 × L × Q^1.852 ÷ (C^1.852 × d^4.8704); Q in m3/s, d and L in m, C about 150 for new PVC | Appendix B |
| Water hammer | Pressure = density × wave speed × velocity change | 1,000 × 400 × 0.6 = 2.4 bar |
| Pipe or casing volume | 0.7854 × d² × length (d in m, volume in m3) | 150 mm, 37 m: 0.653 m3 = 653 L |
| Chlorine dose | Volume (L) × target (mg/L) ÷ strength (mg/L) | 653 × 50 ÷ 50,000 = 0.65 L of 5 percent bleach |
| Affinity laws | Flow ∝ speed; head ∝ speed²; power ∝ speed³ | Speed ratio 0.8: 0.8, 0.64, 0.512 |
| Voltage drop (1-phase) | 2 × I × L × resistivity ÷ area | 2 × 8.5 × 60 × 0.0175 ÷ 2.5 = 7.1 V |
Symbols: Q flow, H head, d diameter, L length, s drawdown, C roughness coefficient, I current, B and C in the step-test formula are aquifer and well loss coefficients.
Appendix B · Sizing tables
Tag: BUILD (calculated for this book from a formula, example pipe sizes). An engineer must check before use.
Read this first. The pipe sizes are nominal and treated as the inside diameter. A real pipe's inside diameter is smaller than its outside size, so real losses are higher. Get the inside diameter from the supplier's data sheet and recalculate. Values marked * have a velocity above 1.5 m/s, which is a commonly used planning limit (not a Ghana rule).
B1 · Friction loss in metres of head per 100 m of new PVC pipe (C = 150)
| Flow (m3/h) | 32 mm | 40 mm | 50 mm | 63 mm | 75 mm | 90 mm | 110 mm |
|---|---|---|---|---|---|---|---|
| 1 | 0.49 | 0.17 | 0.06 | 0.02 | 0.01 | 0.00 | 0.00 |
| 2 | 1.8 | 0.60 | 0.20 | 0.07 | 0.03 | 0.01 | 0.00 |
| 3 | 3.8 | 1.3 | 0.43 | 0.14 | 0.06 | 0.02 | 0.01 |
| 5 | 9.7 * | 3.3 | 1.1 | 0.36 | 0.15 | 0.06 | 0.02 |
| 10 | 35 * | 12 * | 4.0 | 1.3 | 0.55 | 0.23 | 0.09 |
| 15 | 74 * | 25 * | 8.4 * | 2.7 | 1.2 | 0.48 | 0.18 |
| 20 | 126 * | 43 * | 14 * | 4.7 * | 2.0 | 0.82 | 0.31 |
| 30 | 268 * | 90 * | 30 * | 9.9 * | 4.2 * | 1.7 | 0.65 |
(Formula: Source: LMNO Hazen-Williams.)
B2 · Velocity in m/s
| Flow (m3/h) | 32 mm | 40 mm | 50 mm | 63 mm | 75 mm | 90 mm | 110 mm |
|---|---|---|---|---|---|---|---|
| 1 | 0.35 | 0.22 | 0.14 | 0.09 | 0.06 | 0.04 | 0.03 |
| 2 | 0.69 | 0.44 | 0.28 | 0.18 | 0.13 | 0.09 | 0.06 |
| 3 | 1.04 | 0.66 | 0.42 | 0.27 | 0.19 | 0.13 | 0.09 |
| 5 | 1.73 | 1.11 | 0.71 | 0.45 | 0.31 | 0.22 | 0.15 |
| 10 | 3.45 | 2.21 | 1.41 | 0.89 | 0.63 | 0.44 | 0.29 |
| 15 | 5.18 | 3.32 | 2.12 | 1.34 | 0.94 | 0.65 | 0.44 |
| 20 | 6.91 | 4.42 | 2.83 | 1.78 | 1.26 | 0.87 | 0.58 |
| 30 | 10.36 | 6.63 | 4.24 | 2.67 | 1.89 | 1.31 | 0.88 |
B3 · Pipe volume per metre (for flushing and chlorine)
| Pipe inside diameter (mm) | Volume per metre (L) |
|---|---|
| 32 | 0.80 |
| 50 | 1.96 |
| 63 | 3.12 |
| 75 | 4.42 |
| 90 | 6.36 |
| 110 | 9.50 |
B4 · Casing volume and bleach dose per metre of water column
| Casing inside diameter (mm) | Water per metre of column (L) | Bleach 5% for 50 mg/L (mL per m) | Bleach 3.5% for 50 mg/L (mL per m) | Bleach 5% for 200 mg/L (mL per m) |
|---|---|---|---|---|
| 100 | 7.85 | 7.9 | 11.2 | 31.4 |
| 125 | 12.27 | 12.3 | 17.5 | 49.1 |
| 140 | 15.39 | 15.4 | 22.0 | 61.6 |
| 150 | 17.67 | 17.7 | 25.2 | 70.7 |
| 165 | 21.38 | 21.4 | 30.5 | 85.5 |
| 200 | 31.42 | 31.4 | 44.9 | 125.7 |
(Dose rule: 5 percent bleach holds 50,000 mg/L of chlorine; 3.5 percent holds 35,000 mg/L. Read the label. Foreign guidance uses 50 to 200 mg/L held for hours, then flushing.)
B5 · Constants and conversions
| Item | Value |
|---|---|
| Gravity | 9.81 m/s2 |
| Water density | 1,000 kg/m3 |
| 1 bar | about 10.2 m of water head |
| 1 kPa | about 0.102 m of water head |
| 1 L/s | 3.6 m3/h |
| 1 m3/h | 16.67 L/min |
| 1 HP | 0.746 kW |
| 1 US gallon | 3.785 L |
Appendix C · Forms and checklists
Copy, print or redraw in an exercise book. Keep each filled form as part of the job record.
Ask a qualified expert. Forms are templates. Contract wording must be checked by a qualified lawyer, electrical readings by a certified electrician, and water results by an accredited laboratory. This is general information, not legal advice.
C1 · Site visit checklist
| Item | Yes / no / note |
|---|---|
| Owner's name, plot, access for a rig | |
| Land slope, low ground, drains | |
| Distance to latrine, septic tank, rubbish, animal pens (guide: more than 30 to 50 m) | |
| Overhead lines (voltage?) and buried cables (position?) | |
| Neighbour boreholes: depth, yield, taste | |
| Near the coast? Salt check planned | |
| Geological map checked | |
| Photos taken |
C2 · Driller quote and contract checklist
- Licence number and WRC confirmation
- Price per metre and what it includes (casing, screen, gravel pack, seal, development, test pumping, water test)
- Who supplies the development tools and the test pump
- What happens if the hole is dry
- Test pumping hours and method; who records
- Log, completion record and test sheet handed over
- Payment stages tied to steps done
- Lawyer has read the contract
C3 · Driller's log (blank)
| Depth from (m) | Depth to (m) | Rock or soil | Water strike (yes/no, size) | Notes |
|---|---|---|---|---|
C4 · Test-pumping record (blank)
| Date | Time | Minutes since start | Flow (m3/h) | Water level (m) | Drawdown (m) | Comment |
|---|---|---|---|---|---|---|
C5 · Pump installation and commissioning record
| Item | Reading or tick | Who |
|---|---|---|
| Pump make, model, kW, phase | Technician | |
| Setting depth (m), pumping level (m), water above pump (m) | Technician | |
| Cable size and length | Electrician | |
| Insulation resistance of motor and cable (megohm) before and after | Electrician | |
| Winding resistance between phases (compare) | Electrician | |
| Running current against nameplate current | Electrician | |
| Supply voltage at the control box while running | Electrician | |
| Flow at the outlet (bucket or meter) | You | |
| Pressure at the gauge | You | |
| Check valve, air valve, isolation valve fitted | You | |
| Tank float working | You | |
| Handover: record given to owner | You |
C6 · Monthly monitoring sheet
| Month | Static level (m) | Pumping level (m) | Flow (m3/h) | Energy (kWh) | Faults | Sign |
|---|---|---|---|---|---|---|
C7 · Shock chlorination record
| Item | Entry |
|---|---|
| Date, borehole, casing inside diameter | |
| Water column height (m) | |
| Target mg/L and bleach strength | |
| Bleach volume (from table B4) | |
| Time added; contact hours | |
| Flush: where the water went | |
| Test after: lab and date |
C8 · Toolbox talk and job hazard card
- Overhead lines and buried cables checked and marked
- Power isolated, locked out and tested dead by the electrician
- Lifting gear checked and safe working load known
- Open holes covered
- PPE worn
- Chemicals labelled; gloves and glasses on
- First-aid kit; 112 plan
C9 · Quotation and invoice template
| Line | Description | Quantity | Unit price (GH¢) | Amount (GH¢) |
|---|---|---|---|---|
| 1 | Pump (make, model) | |||
| 2 | Rising main, cable, valves | |||
| 3 | Labour | |||
| 4 | Transport | |||
| Total |
Add: date, your name, validity period, payment terms, job address.
Appendix D · Test-pumping analysis
A simple graph and a line turn a test sheet into decisions.
Ask a qualified expert. Interpreting a pumping test and fixing a safe yield belongs to a qualified hydrogeologist. This is a learning method, not a Ghana rule. Check the Water Resources Commission requirements.
D1 · Step test (s = BQ + CQ2)
For each step, work out s ÷ Q and plot against Q. A straight line has intercept B (aquifer loss) and slope C (well loss). With the Unit 2 numbers the points are Q = 1.2, 2.0, 2.8 m3/h and s ÷ Q = 2.08, 2.45, 3.00; the line gives B = 1.37 and C = 0.57. Well loss share of drawdown is C Q² ÷ s: at 1.2 m3/h about 33 percent, at 2.0 about 46 percent, at 2.8 about 54 percent. If well loss is above half, the screen or development may be poor and a lower pumping rate or better development is needed.
D2 · Constant-rate test and recovery
Plot drawdown (vertical, normal scale) against time (horizontal, log scale). In the Cooper-Jacob straight-line method the transmissivity is T = 2.3 × Q ÷ (4 × pi × Δs), where Δs is the drawdown change over one log cycle of time. Example (all numbers are examples): Q = 18 m3/h = 0.005 m3/s and Δs = 1.2 m give T = 2.3 × 0.005 ÷ (4 × 3.14 × 1.2) = 0.00076 m2/s = about 66 m2/day. A slow recovery or a falling water level at a steady rate warns of a limited aquifer.
D3 · Choosing a pumping rate and setting
- Read the step-test line to the rate where well loss is acceptable.
- Apply a planning share of the tested yield (example 70 percent; not a Ghana rule).
- Set the intake with margin below the lowest pumping level and, where possible, above the screen top, because Grundfos advises the motor above the screen for cooling.
- Check again at the end of the dry season.
Appendix E · Fault-finding charts
Follow the steps in order. Anything electrical is read and recorded by the electrician; you observe, write and report.
Ask a qualified expert. Pump motors, cables and controls are electrical work for an Energy Commission-certified electrician. Pressure, lifting and hand pump repair inside the borehole are for a qualified mechanic or area mechanic. This is general information, not electrical advice.
E1 · Submersible pump
| Symptom | Check in this order | Measure or observe | Who acts |
|---|---|---|---|
| Does not start | 1 Power at the board. 2 Breaker and RCD. 3 Float state. 4 Control box | Voltage at the box; lights on the box | Electrician |
| Runs, no water | 1 Valves open? 2 Tank full? 3 Pipe leak? 4 Water below the pump? | Water level with a dip meter; flow at the outlet | You, then driller or electrician |
| Low flow | 1 Partly closed valve. 2 Leak. 3 Blocked screen or strainer. 4 Worn pump | Pressure and flow against the curve | You, then supplier |
| Trips or overheats | 1 Dry run. 2 Low voltage. 3 Jammed pump or sand. 4 Winding fault | Running current against nameplate; voltage while running; insulation reading | Electrician |
| Cycles on and off | 1 Float. 2 Tank too small. 3 Leak after the check valve. 4 Pressure vessel | Count starts per hour | You and electrician |
| Sand or mud | 1 Pump too deep in silt. 2 Screen damaged. 3 Pump too strong | Sand test (Imhoff cone) | Driller |
| Noise or vibration | 1 Air in the pipe. 2 Pump pulled to its limit. 3 Loose pipe or rope | Listen; check pressure gauge | Technician |
| Bad taste or colour | 1 Iron or manganese. 2 New chlorine. 3 Pollution | Test strip; laboratory | Laboratory |
E2 · Surface pump
| Symptom | Check | Who |
|---|---|---|
| Will not prime | Air leak on suction, foot valve stuck, suction too long | Technician |
| Low flow | Blocked strainer, worn impeller, suction lift too high | Technician |
| Noise like gravel (cavitation) | Suction too high or too restricted | Technician |
| Trips | Overload, low voltage | Electrician |
E3 · Hand pump (Afridev type)
| Symptom | Likely cause | Action |
|---|---|---|
| Handle goes down easily, no water | Broken rod or coupling; cup seal worn out | Area mechanic pulls the rods |
| Stiff handle | Dry bearings, bent rods, rod rubbing | Grease; mechanic |
| Little water | Worn cup seal or U seal; water level low | Area mechanic; check yield |
| Water comes only after many strokes | Foot valve leaking | Area mechanic |
| Leak at the head | Loose bolts, worn gasket | Tighten; replace |
| Rubber seals fail again and again | Seal groove or plunger wear; poor-quality seals | Check the plunger groove and wear; use maker parts (good practice) |
E4 · Solar pump
| Symptom | Check | Who |
|---|---|---|
| No flow in sun | Dirty or shaded panels; breaker; controller lights; dry-run switch | Licensed installer |
| Low flow | Panel dirt; low sun; high head | You (clean from the ground); installer |
| Pump stops early | Tank float; dry-run; controller fault | Installer |
Appendix F · Hand pump care and repair
From the field: The seal that always goes
The problem. On hand pumps the rubber seals fail most often.
The lesson. Keep spare seals before the pump stops.
Next time. 1. Keep a seal kit with the community. 2. Learn the replacement steps. 3. Check the seals at every visit.
Ask a qualified expert: the area mechanic does the replacement.
Ask a qualified expert. Pulling the rods and cylinder is for a trained area mechanic who follows the maker's manual. A pump stuck, a part lost in the hole or water that makes people ill needs a licensed driller, the Water Resources Commission and a health worker.
The standard Afridev manual has a dismantling section, a diagnosis section, a tool and spare-parts list and a replacement-interval table for wearing parts. Ghana's CWSA lists four standard pumps: Nira, Afridev, the Ghana-modified India Mark II and Vergnet.
Plunger seal replacement: the general sequence
- Tell the committee; stop use; lock the handle.
- Wear PPE; clear the apron.
- Remove the pump head following the maker's manual.
- Lift the rods and plunger out section by section; lay the rods down so they do not bend.
- Replace the worn cup or U seal with a maker's seal; check the plunger for wear.
- Check the foot valve if the problem persists.
- Re-lower the rods; refit the head; test the pump with the bucket and stopwatch; record.
Safety protocol: replacing hand pump seals (area mechanic)
Before you start
- Tell the committee; stop use; lock the handle.
- Spares kit, maker's manual, tools and a clean sheet on the ground; bucket and PPE.
- Two people for lifting rods and pipes.
While you work
- Do lift rods and pipes slowly and lay them straight; do keep the rising main clamped when open.
- Do not leave the hole open; do not drop a rod or part in; do not lean over the open casing.
After
- Test the pump with the bucket and stopwatch; clean the apron; cap and lock.
- Write the date, parts used and flow in the logbook; restock the kit.
- Tell the committee the pump is back in use.
Emergency
- Call 112 for any serious injury, fire, shock or someone trapped.
- Switch off the power at the board only if it is safe to reach it; never touch a person who may be in contact with live equipment.
- Give first aid you were trained to give and keep the person warm and still until help arrives. This is not medical advice.
- If a part drops in the borehole, stop, cover the hole and call a licensed driller; do not enter or reach in.
Spares kit (typical content)
| Part | Why |
|---|---|
| Cup or U seals (spare set) | Wear first |
| Rod couplings and bolts | Common failure |
| Bobbins (centralisers) | Wear and break |
| Handle bearings and bushes | Wear |
| Gasket and head bolts | Leaks |
Quantities and exact parts: follow the pump maker's list (not verified here for Ghana stock).
A study of 145 dismantled handpump boreholes in three African countries found 19 percent in aquifers too low in transmissivity for a handpump, the cylinder within 10 m of the water table at 38 percent of sites, and poor rising mains.
Appendix G · Standards and law crosswalk
Ask a qualified expert. This table is a guide to where rules sit. It is not legal advice. Ask the Water Resources Commission, the Energy Commission, the Ghana Standards Authority and a qualified lawyer for current rules and forms.
| Rule | Who enforces | What it says (as far as read) | What you do |
|---|---|---|---|
| L.I. 1827 Drilling Licence and Groundwater Development Regulations 2006 | Water Resources Commission | Drilling a well without a licence is an offence | Ask for the licence |
| L.I. 1692 Water Use Regulations 2001 | Water Resources Commission | Permit categories; exemption threshold not verified | Ask the WRC |
| Solar pump licensing | Energy Commission | Installer needs a licence, a CEWP certificate and an NVTI Grade 1 plumbing certificate | Use a licensed installer |
| Engineering Council Act 819 | Engineering Council and GhIE | Registration of engineers (not verified; ask GhIE for the correct title) | Use a registered engineer |
| GS 175 drinking water | Ghana Standards Authority | Draft read; final not read | Test at an accredited laboratory |
| CWSA guidelines for small communities | CWSA | Community management model of 2010; may have changed | Ask CWSA |
| International practice | Not Ghana law | RWSN Code of Practice for borehole quality; WHO drinking-water guidelines | Label as international; check the Ghana text |
Appendix H · Common mistakes catalogue
| No. | Mistake | What you will see | How to avoid it |
|---|---|---|---|
| 1 | Drilling without assessment | Dry or salty hole | Desk study, site walk, survey |
| 2 | Pump chosen by price | Little water; burn-out | Calculate; read the curve |
| 3 | Trusting the label | Flow far below the label | Bucket test; curve |
| 4 | Pump set too shallow | Dry run | Setting depth margin |
| 5 | Pump set at or below the screen with no sleeve | Overheating | Flow sleeve or move |
| 6 | Pipe too small | High friction, high power bill | Table B1 |
| 7 | No check valve | Pipe drains, pump spins back | Fit one |
| 8 | Fast valve closing | Bang in the pipe | Slow valve; air valve |
| 9 | No dry-run protection | Burn-out | Level probe |
| 10 | Poor cable joints | Insulation failure | Heat-shrink kit |
| 11 | No earthing | Shock | Electrician |
| 12 | Skipped development | Sand and mud | Demand development |
| 13 | No test pumping | Pump beyond the yield | Step and constant-rate tests |
| 14 | No completion record | Cannot repair or rehab | Demand the record |
| 15 | Open borehole | Pollution, falls | Cap |
| 16 | Overhead lines not checked | Shock on site | Call the power company |
| 17 | Hand pump with no spares | Idle pump | Spares kit |
| 18 | No salt test | Unusable water | Conductivity before pumping |
| 19 | Strong chlorine with iron | Clogged pump | Flush and follow the guidance |
| 20 | Prices not dated | Quote disputes | Price data sheet |
Appendix I · Price data sheet (example, update every quarter)
Prices change. Write the shop, the date and the source beside every figure. The prices below are examples from classified ads and blogs and are not verified.
| Item | Example price (GH¢) | Source and date |
|---|---|---|
| 1 HP submersible pump | about 1,095 | October 2026 |
| 1 HP surface pump | about 550 | October 2026 |
| DC solar 1 HP surface pump | about 6,500 | October 2026 |
| 1,000 L tank | about 1,815 | |
| 3,000 L tank | about 5,250 | |
| Drilling | 8,000 to 20,000 | , blog estimate |
| Water test | 300 to 800 | , blog estimate |
| Your quote 1 | ||
| Your quote 2 |
Electricity tariff box. The books use an assumed price per kWh in examples. Read your latest ECG bill and write it here: GH¢ ______ per kWh, date ______ (not verified).
Appendix J · Tools and Items Glossary
Every tool and part named in this book. Sizes are general; check the Ghana supplier's data sheet. Local names differ from town to town: use the standard name and show the picture or the part. The last column gives other common names.
| Item | What it is and its use | Size or type | Who may handle | Also called |
|---|---|---|---|---|
| Adaptors, nipples, unions and flanges | Join the pump to the pipe and one pipe to another. | BSP or NPT thread; size | Technician | pipe fittings; couplings |
| Air release valve and vacuum breaker | Let trapped air out of a pipe and let air in to prevent a vacuum. Fit at high points. | Size to suit the pipe | Technician | air vent; air release valve |
| Airlift (compressor and eductor pipe) | Uses compressed air to lift water and mud from the hole during development. | Per driller | Driller | air-lift development |
| Bailer and surge block | Development tools. A bailer lifts mud out; a surge block moves water in and out of the screen to loosen fines. | Per driller | Driller | sand bailer; mud bucket |
| Barrier tape and cones | Mark an open borehole or work area so people and children keep away. | Visible colour | You | danger tape; safety cones |
| Bobbin and rod centraliser | Plastic guides that keep the pump rod in the middle of the rising main so it does not rub. | Per pump model | Area mechanic | rod guide; centraliser |
| Booster pump | Raises pressure from a tank to taps or sprinklers. | HP | Technician | pressure booster pump |
| Breaker (MCB), RCD and fuse | Switch off on overload or earth fault. The RCD protects people from shock. | Amps; RCD mA set by the electrician | Electrician | circuit breaker; MCB; trip switch |
| BSP and NPT threads | Two pipe thread standards. They look alike but do not seal together; match them. | Per fitting | Technician | pipe thread |
| Cable splice kit (heat-shrink) | Waterproof joint between motor lead and drop cable. A bad joint is a common cause of burn-out. | Size to suit the cable | Electrician | cable joint kit; waterproof joint |
| Capacitor | Helps a single-phase motor start and run. Often inside the control box. | uF | Electrician | run capacitor; start capacitor |
| Casing | Plain pipe lining the borehole so it does not collapse and so water from above cannot get in. | uPVC, steel or HDPE; diameter 100 to 200 mm | Driller | well casing; lining pipe |
| Chain wrench | A wrench with a chain that grips large pipe without crushing it. | For pipe up to 6 inch | Technician | strap wrench |
| Check valve (non-return valve) | Lets water flow one way only so the pipe does not drain and the pump does not spin backwards. | Same size as the pipe; spring or swing | Technician | non-return valve (NRV); one-way valve |
| Chlorine (HTH granules or liquid bleach) | The disinfectant. HTH is strong granular calcium hypochlorite (strength on the label); household bleach is weaker (often 3.5 to 5 percent: read the label). | Strength on the label | You (with trainer) | calcium hypochlorite; sodium hypochlorite (bleach) |
| Chlorine test kit (DPD comparator) | A small kit that turns pink in proportion to free chlorine. Use after disinfection to check the level. | 0 to 5 mg/L | You | chlorine comparator; pool test kit |
| Clamp meter | Reads motor current by clamping round one wire, without cutting it. Compare the reading with the motor nameplate current. | AC amps range to suit the motor | Electrician | clamp-on ammeter; tong tester |
| Clean hose, bucket and jug for sampling | Clean tools for taking a sample without touching the inside of the bottle. | Clean and rinsed | You | sampling hose |
| Concrete apron, drain and soak-away | A concrete slab around the borehole head that sheds spilt water into a drain. | Dimensions set by the designer | You (assist) | platform; pump base; wash slab |
| Conductivity (EC) or TDS meter | Measures dissolved salts as electrical conductivity (uS/cm) or total dissolved solids (mg/L). A quick check for salty water, important near the coast. Use before and during pumping. | 0 to 2,000 uS/cm or wider | You | EC meter; TDS meter; salinity meter |
| Control box or starter (DOL, star-delta) | Switches and protects the motor. Opening it is electrician-only work. | kW; phase | Electrician | starter; motor starter; control panel |
| Cup seal (piston seal) and U seal | Rubber lips that seal the plunger against the cylinder wall. They wear first and are the most frequent repair on community hand pumps. | Per pump model; use maker parts | Area mechanic | piston seal; bucket seal; U-seal |
| Cylinder and plunger (piston) | The cylinder sits in the water. The plunger moves inside it and lifts water on each stroke. | Per pump model | Area mechanic | pump cylinder; working barrel |
| Dip meter (water-level tape) | A reel of graduated tape with a probe that beeps or lights when it touches water. It gives the static and pumping water level from a fixed mark on the casing. Use before and during pumping. | Tape 50, 100 or 150 m | You (with trainer) | water level meter; well sounder; dip tape |
| Drilling rig, compressor, DTH hammer, drill bit, drill rods and mud pump | The driller's machine and tools. A down-the-hole (DTH) hammer breaks hard rock with air; a mud pump circulates drilling fluid. You only need the names. Never operate them. | Per driller | Driller | drill rig; drilling machine |
| Drop cable (submersible cable) | Waterproof cable from the control box down to the motor. | mm2; cores; length | Electrician | submersible cable; flat pump cable |
| Earth rod, earth wire and surge arrester | Give fault current a safe path to ground and lead lightning surges away. Electrician only. | Per electrician | Electrician | grounding rod; earth electrode |
| First-aid kit | Dressings, gloves and washing water. For injuries get a doctor or nurse; call 112 in an emergency. | Kept complete | You | first-aid box |
| Float switch (tank) | A float that rises with the water and stops or starts the pump at set levels. | Type to suit the control | Electrician and you | float control; tank level switch |
| Flow meter (inline) | A meter in the pipe that shows flow rate (L/s or m3/h) and total volume. Gives a better reading than a bucket on large pumps. | Same size as the pipe | You | flow-rate meter; inline meter |
| Flushing valve (washout) | Valve used to flush dirty water out of the system after disinfection. | Pipe size | Technician | washout valve; drain valve |
| Foot valve | A check valve with a strainer at the bottom of a suction pipe. Keeps a surface pump primed. | Suction pipe size | Technician | bottom valve; suction strainer valve |
| Galvanised steel pipe | Steel pipe with a zinc coat, used where strength is needed. It rusts in aggressive water. | 1 to 3 inch | Technician | GI pipe; steel pipe |
| Gate, ball, globe and butterfly valves | Four valve types. Gate and ball valves are for on or off; globe valves throttle flow; butterfly valves are for large pipes. | Pipe size; PN | Technician | sluice valve; stop valve |
| Generator | Backup power. See Small Engines in this library. Size by the motor starting current, not only its running power. | kVA | Electrician | gen set; standby generator |
| Gravel pack (filter pack) | Clean, rounded, sized gravel around the screen. It holds back fine sand and keeps the slots open. | Grain size in mm; volume | Driller | filter pack; gravel filter |
| Hacksaw, pipe wrench, spanners and vice | The plumber's hand tools: cut pipe, grip and turn pipe, tighten bolts, hold work. | Pipe wrench 14 to 24 inch | You | pipe saw |
| Hand pump (Afridev, India Mark II, Nira, Vergnet) | A pump worked by arm or foot with no electricity. Afridev and India Mark II lift water with a handle, rods and a cylinder in the borehole; Nira and Vergnet are other designs on the CWSA list. | India Mark II lifts to about 50 m | Area mechanic | village pump; community pump |
| Hardness test kit | A drop-count kit that shows how hard the water is (scale on pipes and heaters). | mg/L as CaCO3 | You | hardness drop test |
| HDPE and uPVC pipe | Two plastic pipes. HDPE is flexible and joined by welding or compression fittings; uPVC is stiff and joined by solvent cement or threads. Both carry a pressure class (PN). | Outside diameter 32 to 110 mm; PN6 to PN16 | Technician | poly pipe; PE pipe; PVC pipe |
| Insulation tester (megger) | Applies a test voltage (often 500 V DC, but use the maker's value) to find leaks from the motor or cable to earth. Used before and after pump installation. | 500 V or 1,000 V | Electrician | insulation resistance tester; megohmmeter |
| Iron test kit | A quick field kit for iron in mg/L. Does not replace a laboratory test. | 0 to 5 mg/L | You | iron test kit; colour test kit |
| Isolation valve (gate or ball valve) | Opens or shuts the flow so one part can be cut off for repair. | Pipe size; PN | You | stop valve; shut-off valve |
| Level probe (borehole) | Sensor that cuts the pump if the borehole water falls too low. | Cable length to suit setting depth | Electrician | dry-run probe; low-level electrode |
| Lock and tag (lock-out set) | A padlock and tag put on the switch so nobody can switch on while work is being done. Electrician rules apply. | Per site | Electrician | padlock and tag; lockout kit |
| Marked bucket (20 L) | A bucket with the volume marked on it. Fill it from the spout or pipe and time it to measure flow (bucket test). Use at hand pumps, taps and pump outlets. | 20 L; mark the full line with a measured jug | You | pail; measuring bucket |
| Measuring jug and clean bucket | Measure and mix the dose of chlorine. | 1 L jug; 10 to 20 L bucket | You | measuring cup |
| MPPT (maximum power point tracker) | Electronics in the controller that keeps the panels at their best working point as sun changes. | Per controller | Licensed installer | solar pump controller; charge controller |
| Multimeter | Reads volts, ohms and sometimes amps. Used by the electrician; you only watch and record the reading. | Check the category rating on the label | Electrician | multitester; volt-ohm meter |
| Overload relay, dry-run and phase-failure protection | Devices that stop the motor if it overheats, runs dry or loses a phase. | Per maker | Electrician | thermal overload; motor protector |
| pH meter or pH strip | Shows how acid or alkaline the water is, on a scale of 0 to 14. Use on a fresh sample. | 0 to 14 | You | pH tester; pH strip |
| Pipe clamp (lifting clamp) | Holds the pipe at the wellhead while the next length is joined. | Pipe size | Trained crew | lifting clamp; pipe elevator |
| PPE: boots, gloves, safety glasses, hard hat and apron | Protective gear for the eyes, hands, head and feet. Chemical gloves and glasses are needed for chlorine. | Fit and size per person | You | safety gear; protective clothing |
| Pressure gauge | A dial that reads pressure in bar or kPa. About 10 m of water head equals 1 bar. Fit on the pump outlet to check the duty point. | 0 to 6 or 0 to 10 bar; thread BSP 1/4 or 1/2 inch | You | pressure gage; manometer |
| Pressure relief valve | Opens at a set pressure to protect pipe and tank. | Set pressure in bar | Technician | safety valve; pressure relief |
| Pressure switch | Starts and stops the pump by pressure in a pressure system. | Set range in bar | Electrician | pressostat; pressure control |
| Pressure vessel (tank with an air cushion) | A steel tank with an air bag that stops the pump switching on and off too often. | Litres; bar rating | Technician | expansion vessel; accumulator; pressure tank |
| PTFE tape, jointing compound and solvent cement | PTFE tape seals threaded joints; jointing compound seals larger threads; solvent cement welds uPVC pipe joints. | Per product label | You | thread seal tape; plumber's tape |
| Pump end and motor | The two halves of a submersible set. The pump end has the stages that lift; the motor sits below it. | Stages; kW | Technician | wet end; stage pack |
| Pump head, handle and fulcrum | The part above ground that you move. The handle turns the hand movement into up and down rod movement. | Per pump model | Caretaker | pump head assembly |
| Pump rod and rod coupling | Rods inside the rising main that carry the up and down movement to the plunger. Couplings join rods. | Stainless steel or fibreglass; per metre | Area mechanic | sucker rod; lift rod |
| Resistivity set and GPS | Instruments used by the hydrogeologist or driller to site a borehole. A trainee only needs the names. | n/a | Hydrogeologist | resistivity meter; survey set |
| Rising main (drop pipe) | The pipe that carries water from the pump up to the surface. | uPVC, HDPE or galvanised steel; size; pressure class PN | Technician | drop pipe; riser pipe; column pipe |
| Safety rope or wire, cable clips and tape | A rope fixed to the pump that holds it if a pipe joint fails. Clips and tape hold the cable to the pipe. | Rated for the pump weight plus margin | Technician | safety wire; lifting rope |
| Sample bottles | Sterile bottles from the laboratory for germ tests and clean bottles for chemistry. The laboratory tells you which and how to keep the sample. | 250 or 500 mL | You | sample container; sample jar |
| Sand filter, aeration tower and cartridge filter | Treatment units. Aeration plus sand filtration removes iron and manganese. Cartridge filters catch fine particles. They do not remove salt. | Flow rating | Technician | iron filter; aeration unit |
| Sand tester (Imhoff cone) | A clear cone that lets sand in a litre of pumped water settle so you can read it. Use after development and in the first weeks. | 1 L cone | You (with trainer) | Imhoff settling cone; sand cone |
| Sanitary seal (cement or bentonite grout) | A sealed collar near the top of the annulus so dirty surface water cannot run down the outside of the casing. | Depth and material set by the driller | Driller | annular seal; grout seal; sanitary grout |
| Screen (slotted casing) | Slotted pipe opposite the water-bearing layer. Water enters through the slots; sand is kept out. | Slot size in mm; open area | Driller | well screen; slotted casing; strainer pipe |
| Screwdrivers, hammer and pliers | Basic hand tools for the hand pump and tank. | Standard sizes | You | hand tools |
| Solar panel (PV module) and array | A panel makes DC power in daylight. An array is panels joined together. Wires can be live even when the pump is off. | Wp per panel; number | Licensed installer | solar panel; PV panel |
| Solar pump and controller | A pump driven by solar panels. The controller (with MPPT) converts and protects. | Array kWp; voltage; flow and head | Licensed installer | solar borehole pump; PV pump |
| Spares kit (seals, rod couplings, bobbins and bolts) | A box of the parts that wear most, kept by the committee so repairs are quick. | Per pump model | Committee and mechanic | seal kit; repair kit |
| Stopwatch | Times how long the bucket takes to fill. A phone stopwatch is fine. | Seconds | You | timer |
| Submersible pump | Pump and motor in one unit hung under the water. The pump end lifts the water and the motor drives it. Use for deep boreholes. | Diameter 3, 4 or 6 inch; kW; single or three phase | Electrician and technician | submersible borehole pump; deep-well pump |
| Sump and centraliser | The sump is a plain pipe below the screen where silt settles. Centralisers keep the casing in the middle of the hole. | Casing size | Driller | tail pipe; bottom cap |
| Surface pump (jet or centrifugal) | A pump above ground that sucks water up. Suction lift is limited to a few metres. Use from tanks and shallow sources. | HP; suction size | Technician | centrifugal pump; jet pump; self-priming pump |
| Tank level gauge | A float or sight tube that shows how full the tank is. Used in the monitoring log. | Marked in litres | You | level gauge; sight tube |
| Tank, stand, overflow, vent screen and manhole cover | Tank stores water; stand lifts it for pressure; overflow carries surplus away; vent screen keeps insects out; manhole cover is the lockable lid. | Litres; plastic or concrete | You (assist) | storage tank; reservoir |
| Tape measure, plumb bob and spirit level | Measure lengths and heights, hang a vertical line, and check that a tank base is level. | 5 m to 30 m tape | You | measuring tape; plumb line and level |
| Test strips and colour comparator | Small paper strips or colour charts for quick checks on pH, chlorine and hardness. | Per product | You | test paper; colour chart |
| Test-pumping pump and generator (contractor's) | The driller's test pump and its power for the yield test. Check that it can run the full test period. | Flow and head to suit the test | Driller | contractor's test pump |
| Thermometer | Reads the water temperature. Warm water cools a motor less well and changes chlorine action. | 0 to 50 C | You | water thermometer |
| Torque arrestor | A rubber collar that stops the pump set twisting at start-up. | Fits the casing and pump size | Technician | torque arrester; anti-twist collar |
| Tripod, pulley and hoist | Lifting gear for lowering and pulling pump and pipe. Trained people only. Never exceed the safe working load. | Safe working load in kg on the tag | Trained crew | A-frame; lifting tripod |
| Turbidity tube or meter | A clear tube or meter that shows how cloudy the water is (NTU). Use for muddy or sandy water. | NTU range | You | turbidity meter; clarity tube |
| Voltage tester (phase tester) | Proves a wire is live or dead before any work. Never trust a switch; test, then work. | Rated for the voltage | Electrician | test pen; voltage detector |
| Warning sign and fence | A sign and fence around the water point to keep animals and children out. | Visible | You | guard fence; warning board |
| Water meter | Counts the total water used, for billing and for the monthly record. | Size of the supply pipe | You | water meter; totaliser |
| Weighted tape (chalked tape) | A cheap steel tape with a weight. Chalk the end; the wet mark shows the depth to water. Use when no dip meter is available. | Tape 30 to 100 m | You | chalked tape; steel tape |
| Wellhead (well cap and seal plate) | The top closure of the borehole. It carries the pipe and cable and keeps dirt and insects out. | Fits the casing size | Technician | well cap; well seal; sanitary cap |
Kit list for a pump job. Dip meter; bucket and stopwatch; pressure gauge; PPE; pipe wrench and chain wrench; hacksaw; PTFE tape and jointing compound; solvent cement; spare check valve and seals; rope and clips; test strips; sample bottles; first-aid kit. (Good practice list; confirm against your own jobs.)
Appendix K · Index
| Look for | Go to |
|---|---|
| Affinity laws | Unit 3; Appendix A |
| Chlorine dose | Appendix B4; Unit 6 |
| Completion record | Unit 2 |
| Cooling flow | Unit 4 |
| Fault charts | Appendix E |
| Forms | Appendix C |
| Friction table | Appendix B1 |
| Hand pump seals | Appendix F |
| Operating point | Unit 3 |
| Overhead lines | Unit 2 |
| Step test | Unit 2; Appendix D |
| Voltage drop | Unit 4 |
| Water hammer | Unit 4 |
| Water quality table | Unit 6 |
Further reading and sources
Best next reads: the RWSN India Mark II manual; the WRC website; pump makers' curves; Basic Plumbing, Solar Energy in this library; Boreholes and Water Pumps Level 3.
What this module does not cover: drilling, siting surveys, pump wiring, pulling stuck pumps, treatment plants, and current Ghana borehole prices (blog estimates only).
Every source used in this manual is listed, with links, in the Teacher Copy.