← All training manualsBoreholes and Water Pumps Level 3 · read-onlyGet the PDF with Teacher Copy (GH¢50)
Level 3 · Advanced · CTVET formatTrainee Manual

Boreholes and Water Pumps Level 3

Design the supply, manage the contract, keep the pumps running, and build a lawful water-services business with honest books.

A borehole cut open: casing, submersible pump, tank, solar panel and a hand pump A cross-section of the ground. A narrow cased borehole goes down through soil and rock to a blue water table. A submersible pump hangs near the bottom on a pipe that rises to a tank on a steel stand on the left. A solar panel on a frame stands beside the tank. On the right, a hand pump with a long handle stands over a second borehole, and a person fills a yellow bucket at its spout. TANK + SOLARPUMPHAND PUMPSAFE WATER · LICENSED DRILLERS
Trainee name
Training centre
Business name
Start date
Prepared by De-Graft Afful · Version 1.1.0 · November 2026
01

About this module

At Level 3 you stop following checklists and start writing them. You decide what a farm needs, what a contract must say, why a pump keeps failing, and how to build a business that lasts.

Who it is for. Trainees who finished Boreholes and Water Pumps Level 2 or have equal experience, aged 18 or over. In Ghana's framework National Proficiency II leads to National Certificate I. This module is comparable to that level, but it is not a CTVET curriculum.

Bridge from Level 2: what you already know

  • Site sketch, pollution distances and licensed-driller checks
  • Driller's log, step test, constant-rate test, drawdown and specific capacity
  • Demand, total dynamic head, hydraulic and electrical power, pump curves
  • Installation, commissioning record and who connects power
  • Solar pumping rule of thumb and the licences it needs
  • Draft water-quality limits, treatment options and dose arithmetic
  • Mark-up and margin; WhatsApp Business and referrals

Every Level 1 and 2 safety gate stays. Ask a qualified expert. Drilling is for licensed drillers; pump wiring is for an Energy Commission-certified electrician; lifting, pressure and structural design need a GhIE-registered engineer; water quality needs the Water Resources Commission and an accredited laboratory; law, tax and money need a lawyer or accountant. This is general information, not legal, financial, medical or engineering advice.

How the module works

Each unit has learning outcomes, performance criteria, the range and the evidence. Units 5 to 7 go with the hub's Money Skills Level 2 and Entrepreneurial Thinking Level 2; read those first and go deeper here. All prices and business numbers in this book are labelled example unless a source is named.

02

Unit 1 · Assess groundwater and design a water supply

A water supply is a promise: so many litres, every day, clean, for years. You can only make the promise if you have done the sums and respected the aquifer.

Competency standard

Learning outcome Performance criteria — the trainee…
1.1 Estimate demand works out daily and peak demand for people, animals and crops
1.2 Assess the source uses logs and tests to judge the safe yield and its limits
1.3 Design storage and pumping chooses tank size, pump hours and pump flow
1.4 Plan within the law lists the WRC licence, permit and registration questions
1.5 Write a design brief produces a one-page brief that a supplier or engineer can price

Range. One farm or small community scheme. Evidence. Design brief and calculation sheet; oral questions.

Ask a qualified expert. Groundwater assessment and the design of community supplies need a hydrogeologist or a GhIE-registered engineer; your brief is a first draft for them. Ask the Water Resources Commission about permits and registration, and ask a qualified lawyer before you commit to a contract. This is general information, not an engineering design or legal advice.

Demand

Daily demand = sum of (users × litres each). Example (all numbers are examples): a farm with 20 staff at 40 litres each = 800 L; 40 goats at 5 litres = 200 L; a 1,000 m² vegetable plot at 4 litres per square metre per day = 4,000 L. Total = 800 + 200 + 4,000 = 5,000 L/day. Add a peak day margin and growth.

The source

  • Yield and safe yield. The tested yield from Level 2 is the start. A planning rule used in this book is to pump at no more than about 70 percent of the tested yield (an example rule, not a Ghana standard). With a tested yield of 2.4 m³/h: 2.4 × 0.7 = 1.68 m³/h.
  • Dry season. Test and design for the worst time: the water table falls in the dry season, so check the borehole in the dry season (Level 1 Unit 2).
  • Limits. Pumping more than recharge brings in lowers the water table, and pumping should follow the water rules. Boreholes drilled too close can lower each other's water levels; the spacing is for a hydrogeologist.
  • Geology. Success rates and yields differ by rock: in the Ashanti Region study, Birimian zones had a success rate of about 91 percent and granitoids about 72 percent. That is another region; not verified for Takoradi.

Storage and pumping

  • Storage = daily demand × days of cover. 5,000 × 2 days = 10,000 L.
  • Pump hours = daily demand ÷ pump flow. 5,000 L ÷ 1,680 L/h = 2.98 hours, about 3 hours of pumping a day.
  • A 5,000-litre tank was listed at about GH¢7,815 in a 2026 article (an example price), so two tanks cost about GH¢15,630.
  • Pump head and power: use the Level 2 method (total dynamic head, then hydraulic power ÷ efficiency).

Plan within the law

  • Drilling is by a licensed driller only; an offence otherwise, and hiring an unlicensed driller can bring prosecution.
  • A summary of the Water Use Regulations, 2001 (L.I. 1692) says some small mechanical abstraction may be exempt from a permit but must still be registered; the exact threshold was not verified. Ask the WRC whether your scheme needs a water-use permit.
  • A new scheme that serves a community should plan how it will be managed (see Unit 4) and who pays.

Design a supply (example numbers)

A small school: 120 pupils at 10 litres each, 8 staff at 40 litres, plus 600 litres for the garden. Tested yield 3.0 m³/h; planning rule 70 percent; storage 2 days of cover.

(1) Daily demand. (2) Planning pump flow. (3) Pump hours per day. (4) Storage needed.

Design brief

  1. Choose a real farm, school or clinic (with permission) and list who and what uses water.
  2. Work out demand, planning flow, pump hours and storage.
  3. Add TDH and power from the Level 2 method.
  4. List WRC and other questions to ask.
  5. Write a one-page design brief: demand, source, pump, tank, protection, who manages it, open questions.
  6. Present it to your trainer as if the trainer were an engineer.

Dry-season test plan

Write a plan for how you would test the borehole in the dry season: who pumps, how long, what you record, who reads the result. Do not touch any pump.

From the field: The borehole with no water

The moment. A client paid for a borehole and did not get the water he hoped for.

The problem. The hole was a total loss to the client.

The cause. No proper assessment was made to find the best place for the water.

The lesson. Find the water on paper before you look for it with a drill.

Next time. 1. Look at the land: low-lying places and the water table. 2. Read the geological map of the area. 3. Ask a qualified hydrogeologist before drilling.

Ask a qualified expert: a hydrogeologist or a licensed driller decides where to drill.

Desk study and design margins by rock province (what is and is not known)

Rock or zone What was found Tag
Birimian About 90.6 percent success, medium to high yield zones Ashanti Region study; example
Tarkwaian About 79.5 percent success, mostly medium yield Ashanti Region study; example
Granitoids About 72.3 percent success, mostly low yield Ashanti Region study; example
Coastal plain, Western Region Sand and limestone aquifers described in an older national survey Dated; check locally
Coast generally Seawater intrusion is an emerging concern in coastal aquifers National review
Takoradi, Mpohor, Axim No yield or success figure found Not verified; ask a licensed driller and the WRC

Design margin rule. Where local data is missing, size the supply from the tested yield of your own borehole, never from a neighbour's or from another region, and design for the dry season.

Ask a qualified expert. Groundwater assessment and water-supply design are for a hydrogeologist and a GhIE-registered engineer. These figures are examples from other places and are not design values.

Tools and items for this unit

Item What it is and its use Size or type Who may handle Also called
Resistivity set and GPS Instruments used by the hydrogeologist or driller to site a borehole. A trainee only needs the names. n/a Hydrogeologist resistivity meter; survey set
Data logger and pressure transducer A sensor lowered into the borehole that records water level automatically. Used for long tests and monitoring. Range to suit depth Hydrogeologist or driller level logger; pressure transducer logger
Water-level indicator for observation holes A slim dip meter used in monitoring holes to measure levels of other boreholes during a test. Tape 50 to 150 m Hydrogeologist observation-well dip meter
Dip meter (water-level tape) A reel of graduated tape with a probe that beeps or lights when it touches water. It gives the static and pumping water level from a fixed mark on the casing. Use before and during pumping. Tape 50, 100 or 150 m You (with trainer) water level meter; well sounder; dip tape
Conductivity (EC) or TDS meter Measures dissolved salts as electrical conductivity (uS/cm) or total dissolved solids (mg/L). A quick check for salty water, important near the coast. Use before and during pumping. 0 to 2,000 uS/cm or wider You EC meter; TDS meter; salinity meter
Sample bottles Sterile bottles from the laboratory for germ tests and clean bottles for chemistry. The laboratory tells you which and how to keep the sample. 250 or 500 mL You sample container; sample jar
Water meter Counts the total water used, for billing and for the monthly record. Size of the supply pipe You water meter; totaliser

Check yourself

  1. Write the storage formula.
  2. Why design for the dry season?
  3. A demand of 3,000 L/day and a pump flow of 1,500 L/h: how many pump hours?
03

Unit 2 · Manage a drilling and pump contract

Most water projects go wrong on paper before they go wrong in the ground. A clear specification, a priced list and honest records protect everyone.

Competency standard

Learning outcome Performance criteria — the trainee…
2.1 Write a specification states what is to be supplied and the standard of work
2.2 Prepare a bill of quantities lists items, units, rates and totals, with provisional sums and contingency
2.3 Compare tenders scores prices and conditions fairly and checks licences
2.4 Supervise and certify checks work against the contract and records variations
2.5 Close out collects as-built records, test results and guarantees

Range. A pump-and-tank package, with a separately licensed drilling contract if needed. Evidence. Specification; bill of quantities; tender comparison.

Ask a qualified expert. Contracts are legal documents: this is general information, not legal advice. Ask a qualified lawyer to review any contract you sign or issue, and ask a GhIE-registered engineer about the specification of larger works. Check any driller's licence with the Water Resources Commission.

The specification

A specification says what, how good and how tested. For a pump-and-tank package: pump make and size to the pump curve; duty point (flow at head); rising main material and size; check and isolation valves; tank volume and stand; float or controls; protection supplied by the certified electrician; commissioning test; handover records; guarantee period. Write it so that two suppliers would price the same thing.

The bill of quantities (BOQ)

A BOQ lists each item, quantity, unit, rate and amount. Provisional sums hold a place for work whose cost is not yet known (for example the electrician's work). A contingency of about 10 percent is common for unknowns (a planning habit, not a Ghana rule).

Prices below are examples: Jiji listings in October 2026 gave a 1 HP submersible pump at about GH¢1,095; a 2026 article gave a 2,000-litre tank at about GH¢3,175 and a low steel stand for it at GH¢3,000 to 6,500.

Item Qty Unit Rate (GH¢, example) Amount
1 HP submersible pump 1 each 1,095 1,095
Rising main, 6 m lengths 10 each 35 350
Cable and control: provisional sum (electrician) 1 sum 600 600
Check valve 1 each 90 90
Isolation valves 2 each 85 170
Float switch 1 each 120 120
2,000 L tank 1 each 3,175 3,175
Steel stand 1 each 3,000 3,000
Pipework labour, 2 days 2 day 250 500
Helper, 2 days 2 day 120 240
Electrician: provisional sum 1 sum 800 800
Water test: provisional sum 1 sum 500 500
Subtotal 10,640
Contingency 10% 1,064
Total 11,704

Comparing tenders

Ask each bidder for the same list. Check licences, the pump curve, the guarantee, the schedule and the payment terms, then score: price (for example 50%), technical fit (30%), licences and references (20%) (an example scoring scheme). The lowest price is not always the best value. Never ask a bidder to drill or wire without the right licence.

Supervising and certifying

  • Visit at the set stages and record what you see, with photos and dates.
  • A variation is a change to the work or price. Write it, price it, and have it signed before the work is done.
  • Pay in steps against checked work, as the contract says.
  • As-built records at the end: borehole log, depth, casing, test results, pump make and setting depth, cable and pipe route, tank, valve positions, water test, guarantee papers and the electrician's certificate.

Records and the WRC. The WRC says owners must register boreholes. We could not verify the form or fee; ask the WRC and keep a copy of the as-built records.

Check a BOQ

Using the table above: (1) Check the subtotal. (2) Work out the contingency at 10 percent. (3) The owner wants to drop the steel stand and use a GH¢1,500 concrete block base (example). What is the new total with 10 percent contingency?

Specification and BOQ

  1. Take your Unit 1 design brief and write a one-page specification for the pump-and-tank package.
  2. Build a BOQ with at least ten items, one provisional sum and a contingency; use example prices or two real shop prices with dates.
  3. Write a one-page checklist of the as-built records you will ask for.
  4. Swap with a partner and check each other's arithmetic.

Tender comparison

Take two real written quotes for a pump or tank. List what each includes, find what is missing, and write a fair comparison table.

From the field: The driller with only a drilling machine

The problem. Most drilling companies skip steps, such as development and testing, because they have only the drilling machine and not the other equipment.

The lesson. A drilled hole is not a finished borehole.

Next time. 1. Ask before hiring what equipment they bring. 2. Insist on development and a pump test. 3. Ask for the completion record.

Ask a qualified expert: the Water Resources Commission and a qualified lawyer for the contract.

Parts of a test-pumping set-up, every part labelled

Test-pumping set-up (contractor's equipment) A test pump in a borehole on a rising main, with wellhead valve, flow meter, regulating gate valve and a discharge pipe leading away to a drain, a dip tube for water-level readings, a generator and an observation borehole with a data logger. 1Test pump 2Wellhead valve 3Flow meter 4Regulating gate valve 5Pressure gauge 6Discharge pipe to a drain 7Dip tube 8Generator for the test pump 9Observation borehole 10Data logger
A test-pumping set-up. The contractor supplies the test pump, generator and measuring equipment. The owner's supervisor checks that the discharge goes away from the borehole and that readings are taken at the set times.
No. Part What it does Safety rule
1 Test pump Pumps at the planned rate Switch off and lock out before moving it
2 Wellhead valve Isolates the pump line Close slowly
3 Flow meter Records the rate and volume Check calibration against a bucket test
4 Regulating gate valve Sets the rate for each step Open and close slowly (surge)
5 Pressure gauge Shows the line pressure Check it reads zero when off
6 Discharge pipe Carries the water to a drain away from the borehole Fix it so it cannot whip; route clear of people and cables
7 Dip tube Lets the water-level tape pass the pump line Keep clean; never force the tape
8 Generator Powers the test pump Fuel and exhaust rules; never run indoors
9 Observation borehole Shows the effect on a neighbouring borehole Keep covered
10 Data logger Records water level automatically Keep its cable clear of the pump line

Safety protocol: supervising a test pumping

Before you start

  • The contract names who supplies the test pump, generator, flow meter and level instruments, and the length and steps of the test; the owner's supervisor has read it.
  • Overhead lines and buried cables checked and marked; power company contacted.
  • Discharge point chosen so water does not run back or flood neighbours; fuel stored safely; extinguisher present.
  • PPE worn; a first-aider named; 112 plan briefed.

While the test runs

  • Do see that readings are taken at the set times and written on the record sheet.
  • Do keep people away from the discharge and the generator.
  • Do not allow refuelling of a hot generator or work on the pump while it is powered.
  • Do not accept a test that is shortened or interrupted without a written note.

After

  • Recovery is recorded; pump switched off and locked out; discharge pipe drained; generator cooled and stored.
  • Record sheets copied and signed by the contractor and the owner.
  • Any near miss written down.

Emergency

  • Call 112 for injury, fire or shock. Isolate the power at the board only if safe. Do not enter the borehole or casing.

Contract clause library and records (see Appendix F)

Use Appendix F for sample clauses. A qualified lawyer must read the contract, and the WRC licence conditions must be copied into it.

Tools and items for this unit

Item What it is and its use Size or type Who may handle Also called
Test-pumping pump and generator (contractor's) The driller's test pump and its power for the yield test. Check that it can run the full test period. Flow and head to suit the test Driller contractor's test pump
V-notch weir or flow tank A tank with a triangular notch used to measure large flows during a test. Per specification Driller weir tank
Flow meter (inline) A meter in the pipe that shows flow rate (L/s or m3/h) and total volume. Gives a better reading than a bucket on large pumps. Same size as the pipe You flow-rate meter; inline meter
Data logger and pressure transducer A sensor lowered into the borehole that records water level automatically. Used for long tests and monitoring. Range to suit depth Hydrogeologist or driller level logger; pressure transducer logger
Water-level indicator for observation holes A slim dip meter used in monitoring holes to measure levels of other boreholes during a test. Tape 50 to 150 m Hydrogeologist observation-well dip meter
Borehole camera A camera lowered down the casing to see screen condition, corrosion or breaks. Cable length to suit depth Driller or specialist downhole camera
Verticality and alignment check A check that the casing is straight enough for the pump to go down and not rub. Per specification Driller plumbness check
Orifice plate and weir Flow-measuring devices used in larger systems and tests. Per site Engineer flow orifice
Bailer and surge block Development tools. A bailer lifts mud out; a surge block moves water in and out of the screen to loosen fines. Per driller Driller sand bailer; mud bucket
Airlift (compressor and eductor pipe) Uses compressed air to lift water and mud from the hole during development. Per driller Driller air-lift development
Jetting tool Sprays high-pressure water through the screen slots during development. Per driller Driller hydro-jetting tool
Drilling rig, compressor, DTH hammer, drill bit, drill rods and mud pump The driller's machine and tools. A down-the-hole (DTH) hammer breaks hard rock with air; a mud pump circulates drilling fluid. You only need the names. Never operate them. Per driller Driller drill rig; drilling machine

Check yourself

  1. What is a provisional sum?
  2. Name two as-built records.
  3. Why write down a variation before the work?
04

Unit 3 · Pump system design, efficiency and fault diagnosis

A pump that runs well uses less power, lasts longer and fails less. When it fails, a calm method finds the cause faster than guessing.

Competency standard

Learning outcome Performance criteria — the trainee…
3.1 Improve efficiency reduces head losses and chooses the right duty point
3.2 Work out running cost converts power and hours to energy and cost
3.3 Compare power options compares grid, solar, hybrid and generator for a site
3.4 Diagnose faults follows a symptom-to-cause method and decides who must fix it
3.5 Prevent common failures explains dry run, sand, air, cycling and water hammer

Range. Small submersible and surface pump systems. Evidence. Efficiency calculation; fault-finding record; oral questions.

Ask a qualified expert. Pump motors, cables and controls are electrical work: use an Energy Commission-certified electrician for any test or repair involving power, and a licensed solar installer for solar parts. Pipes under pressure can burst: ask a qualified mechanic or GhIE-registered engineer about pressure and lifting. Never touch a live control box. This is general information, not electrical advice.

Reduce head losses

Friction in the pipe adds to total head. Larger pipe, fewer bends and fewer fittings cut friction. Example from Level 2: TDH 36 m with 3 m friction. If larger pipe cuts friction to 1.5 m, TDH becomes 34.5 m. At 1 m³/h (0.278 L/s) the hydraulic power falls from 36 × 0.278 × 9.81 = 98 W to 34.5 × 0.278 × 9.81 = 94 W, about 4 percent less (formula: Source: PSU Solar Pumping). Choose the pipe size from the maker's friction table, not by guess.

Running cost

Energy (kWh) = power (kW) × hours. Example: motor input 1.0 kW, 3 hours a day, 30 days: 1.0 × 3 × 30 = 90 kWh. With an example tariff of GH¢2.00 per kWh (an assumed number; ask ECG for the current tariff): 90 × 2.00 = GH¢180 a month.

Compare power options

Option Good for Watch out for
Grid Sites with steady power Cuts; the supply rules; protection
Solar Farms with no grid and daytime use Licensed installer; storage tank sized to use
Hybrid Sites that need water at night or in cloudy spells Cost and controls; certified electrician
Generator Backup Fuel, noise, fumes; see Small Engines in this library

A solar pump installer needs the Energy Commission licence, a CEWP certificate and an NVTI Grade 1 plumbing certificate.

Fault diagnosis: from symptom to cause

Symptom Possible causes (check from simplest) Who acts
Pump does not start No power; tripped protection; float stuck; control box fault Electrician
Runs, but no water Water level below the pump; blocked pipe; closed valve; broken pipe; air lock You check valves; electrician or driller for the rest
Low flow Partly closed valve; pipe leak; worn pump; head higher than planned You, then the supplier
Pump cycles on and off Float problem; tank too small; leak after the check valve You and the electrician
Sand or mud Pump set too deep in silt; screen damage; pump too strong for the borehole Licensed driller
Trips or overheats Dry run; low voltage; jammed pump Electrician
Sudden bang in the pipe Water hammer from a fast valve closing You: slow the valve; engineer for big systems

Method. (1) Ask what changed. (2) Look and listen. (3) Check the simple things: valves, float, leaks, tank level. (4) Record the measurements: flow with a bucket and stopwatch, water level. (5) Stop and hand over anything electrical. (6) Write the cause and the fix.

Dry run kills pumps. If the water level falls below the intake, the motor can overheat. Check the pump setting depth against the pumping level and ask the electrician about low-water protection.

Cost and fault

Example: motor input 1.5 kW, 4 hours a day for 30 days, tariff GH¢2.00 per kWh (assumed). (1) Energy a month. (2) Cost a month. (3) A customer says "the pump runs but no water comes". List the first three checks in order.

Fault-finding on the rig

  1. The trainer sets two safe faults on the training rig (a closed valve and a stuck float) with the electrician present.
  2. Work through the method and record each check and result.
  3. Measure the flow before and after the fix.
  4. Write a short report: symptom, cause, action, who should be called.
  5. Calculate the running cost of the pump for a month and the effect of larger pipe on head.

One failed pump

Ask a pump owner about a failed pump: what happened, how long it took to fix and what it cost. Use the method to say what you think the cause was.

From the field: The rating that was not true

The problem. Many pumps have a capacity written on them far above what they deliver, and give up after a few days.

The lesson. Do not trust the number on the box.

Next time. 1. Compare with the pump curve. 2. Test the flow with a bucket and a timer. 3. Keep the receipt and ask for a guarantee.

Ask a qualified expert: the pump supplier or a GhIE-registered engineer.

From the field: The pump bought on price

The problem. People choose the pump by cost instead of working out the depth, the suction power and the cubic metres of water needed.

The lesson. A cheap pump that cannot do the job is the most expensive one.

Next time. 1. Work out the daily water needed. 2. Measure the depth to the water. 3. Choose from the pump curve, not the price.

Ask a qualified expert: a GhIE-registered engineer or the pump supplier checks the sizing.

A real pump opened after a seizure

Photograph of a corroded pump with its impeller removedA real water pump opened on a workbench: a blue motor at the back, a shaft in the centre of a rusty, scale-coated housing, and a rusty disc-shaped impeller lying in front. Four numbered callouts point to these parts.1234
A real pump opened on a workbench: heavy rust and mineral deposits in the housing, and the impeller removed. Numbers match the table. (Photo: Matt, public domain)
No. Part What it does Safety rule
1 Motor Turns the shaft Switch off and lock out first; electrician only
2 Shaft Carries the turning movement to the impeller Never turn it by hand while the power is connected
3 Rust and mineral deposits Build up in the housing and can stop the impeller turning Do not scrape them clean in the field; a technician cleans or replaces parts
4 Impeller (taken off) The disc that throws the water outwards Handle it only with the power locked off; wear gloves

Reading faults from measurements

Measurement (taken by the electrician) Normal What a wrong reading suggests
Running current against nameplate current Near the nameplate value High: jammed pump, low voltage, wrong pump for the head. Low: dry run, air lock, closed valve, worn pump
Supply voltage while running Steady and within the maker's range Large drop on starting or running: poor supply or cable too small
Insulation resistance (motor and cable) High and stable; use the maker's table Falling over time: moisture or cable damage; pull the pump before it burns out
Winding resistance between phases Close to equal One phase different: winding or splice fault
Flow against curve at the measured head On the curve Below: wear, blocked intake, leak, high head
Pressure at the gauge As designed High: closed valve or rising level; low: leak or worn pump

Surge, pipe class and valve placement (design check)

  1. Find the velocity change on pump stop or valve closure (for example 1.0 m/s).
  2. Joukowsky pressure rise = water density × wave speed × velocity change; for PVC at about 400 m/s this is 1,000 × 400 × 1.0 = 400,000 Pa = 4 bar.
  3. Add it to the working pressure and compare with the pipe's pressure class from the data sheet.
  4. Reduce it with slow-closing valves, air valves at high points, a check valve placed so the water column cannot slam, or a pressure vessel.
  5. A GhIE-registered engineer signs off a real design.

Variable speed drive (VSD) and the affinity laws

A VSD changes the motor speed by a ratio r: flow changes by r, head by r squared and power by r cubed (all numbers in the Level 2 appendix). Keep the cooling flow past the motor. A VSD must be selected and set by the electrician.

Ask a qualified expert. Pump motors, cables, protection and VSDs are for an Energy Commission-certified electrician; surge and pressure design for a GhIE-registered engineer. This is general information, not electrical or engineering advice.

Tools and items for this unit

Item What it is and its use Size or type Who may handle Also called
Variable speed drive (VSD) Electronic unit that changes motor speed. Gives soft start and lets flow match need. Needs cooling flow past the motor kept up. kW; single or three phase Electrician variable frequency drive (VFD); inverter drive
Pressure vessel (tank with an air cushion) A steel tank with an air bag that stops the pump switching on and off too often. Litres; bar rating Technician expansion vessel; accumulator; pressure tank
Air release valve and vacuum breaker Let trapped air out of a pipe and let air in to prevent a vacuum. Fit at high points. Size to suit the pipe Technician air vent; air release valve
Pressure relief valve Opens at a set pressure to protect pipe and tank. Set pressure in bar Technician safety valve; pressure relief
Orifice plate and weir Flow-measuring devices used in larger systems and tests. Per site Engineer flow orifice
Pressure gauge A dial that reads pressure in bar or kPa. About 10 m of water head equals 1 bar. Fit on the pump outlet to check the duty point. 0 to 6 or 0 to 10 bar; thread BSP 1/4 or 1/2 inch You pressure gage; manometer
Insulation tester (megger) Applies a test voltage (often 500 V DC, but use the maker's value) to find leaks from the motor or cable to earth. Used before and after pump installation. 500 V or 1,000 V Electrician insulation resistance tester; megohmmeter
Clamp meter Reads motor current by clamping round one wire, without cutting it. Compare the reading with the motor nameplate current. AC amps range to suit the motor Electrician clamp-on ammeter; tong tester
HDPE and uPVC pipe Two plastic pipes. HDPE is flexible and joined by welding or compression fittings; uPVC is stiff and joined by solvent cement or threads. Both carry a pressure class (PN). Outside diameter 32 to 110 mm; PN6 to PN16 Technician poly pipe; PE pipe; PVC pipe
Solar pump and controller A pump driven by solar panels. The controller (with MPPT) converts and protects. Array kWp; voltage; flow and head Licensed installer solar borehole pump; PV pump
MPPT (maximum power point tracker) Electronics in the controller that keeps the panels at their best working point as sun changes. Per controller Licensed installer solar pump controller; charge controller
Generator Backup power. See Small Engines in this library. Size by the motor starting current, not only its running power. kVA Electrician gen set; standby generator
Pitless adapter A fitting that lets water leave the casing below ground and still lets the pump be pulled out. Casing size Technician pitless unit

Check yourself

  1. Write the energy formula.
  2. Name two ways to cut head loss.
  3. Who tests a pump control box?
05

Unit 4 · Operation, monitoring, rehabilitation and community management

A scheme works when someone looks after it every week, keeps the numbers and has the money to fix things. Many do not.

Competency standard

Learning outcome Performance criteria — the trainee…
4.1 Plan preventive maintenance writes a schedule for pump, tank and borehole
4.2 Monitor the borehole keeps water-level, flow and water-quality records and reads the trend
4.3 Plan rehabilitation explains when to call the licensed driller and a specialist
4.4 Plan community cost recovery works out a fair monthly contribution
4.5 Lead a crew safely holds toolbox talks and applies lock-out with the electrician

Range. A farm or small-community scheme. Evidence. Maintenance plan; monitoring sheet; safety brief.

Ask a qualified expert. Pulling a pump, cleaning or repairing a borehole and chemical treatment are for licensed and trained people: use a licensed driller, a certified electrician and a qualified safety officer. Ask the Water Resources Commission and test at an accredited laboratory before water is used for drinking again. Never enter a well or tank. This is general information, not an engineering or legal opinion.

Preventive maintenance plan

How often Task Who
Daily Look and listen; check leaks and tank level; cap closed Caretaker
Weekly Record flow (bucket test) and water level; check float, valves, apron and drain Caretaker or you
Monthly Check pipe supports and clamps; clean tank surroundings; check control box is closed (outside only) You
Every 6 months Tank cleaning from outside or by trained staff; sanitise (Level 1 dose); keep the record You and the trainer
Yearly Electrician inspects wiring and protection; water test at an accredited laboratory; review spares Electrician; laboratory

(A planning table; follow your pump maker's manual.) Annual servicing was estimated at GH¢400 to 900 by a vendor blog (an example price).

Monitoring: the numbers tell the story

Record on one sheet: date, static water level (when the pump has rested), pumping level, flow, hours run, any fault. A static level that drops year after year, or a flow that falls, warns you before the pump fails. Compare with the test from the driller's handover.

Rehabilitation (a licensed driller's job)

When yield falls, the cause may be a clogged screen, a worn pump, a falling water table or a damaged casing. A licensed driller or hydrogeologist decides what to do; you collect the records and arrange the visit. Do not let anyone pour chemicals into a borehole without the WRC and a specialist advising. Any rehabilitation that involves drilling or deepening is drilling work and needs a licence.

Community management

Under the CWSA's small-community guidelines, a water and sanitation team signs a contract with an area mechanic for preventive maintenance, paid from water sales, and two trained caretakers (a man and a woman) look after each pump; spare parts should be available at all levels. These are 2010 guidelines and may have changed. One monitoring summary found that half of the management team members said a mechanic took more than three days to come. Nationally, CWSA said in 2024 it oversees 31,388 hand-pump boreholes, 383 solar boreholes and 1,924 pipe systems.

A fair monthly contribution (example)

Cost recovery

Example: a small scheme with 90 households. Monthly costs: caretaker GH¢150; area mechanic visit GH¢100; savings for spare parts GH¢200; electricity GH¢180. (1) Total monthly cost. (2) The contribution per household if all pay. (3) If only 72 households pay, what must each paying household give?

Leading a crew safely

  • Toolbox talk before work: the job, the dangers, who does what, who is first aider, where is the nearest clinic, and the number 112.
  • Lock-out: the certified electrician isolates and locks the supply; no one touches the control box until the electrician says so.
  • Lifting: use a tripod or pulley only if trained; keep out from under loads; no one works alone.
  • No entry: wells, tanks and pits are never entered.
  • Report: write down any near miss.

Maintenance plan and monitoring sheet

  1. Write a maintenance plan for your training rig or the Hub's water point, using the table.
  2. Make a monitoring sheet and record two weeks of readings (dates, flow, level).
  3. Plot the readings on a simple graph and say what the trend shows.
  4. Run a toolbox talk for your group before a practical.
  5. Record everything in your logbook.

Cost recovery plan

Choose a real community or farm water point and write a one-page plan for who pays, how much and how it is collected.

From the field: When the water gushes into the sky

The moment. Drilling hit a pressurised water table and the water shot high into the air.

The problem. Near overhead high-tension lines, a shock is almost unavoidable. Some drills have gone through buried electric cables, with fatal injuries.

The cause. No one checked the surroundings or the power company before work began.

The lesson. Look up and look down before you drill.

Next time. 1. Watch the surroundings carefully. 2. Contact the power company before any work. 3. Keep clear of lines and cables and have a qualified supervisor on site.

Ask a qualified expert: the power company and a qualified safety officer.

From the field: The seal that always goes

The problem. On hand pumps the rubber seals fail most often.

The lesson. Keep spare seals before the pump stops.

Next time. 1. Keep a seal kit with the community. 2. Learn the replacement steps. 3. Check the seals at every visit.

Ask a qualified expert: the area mechanic does the replacement.

Operation and rehabilitation decision table

What you see What to measure What it may mean Who acts
Yield falls Flow, specific capacity, drawdown, pump current Clogged screen, iron encrustation, pump wear, falling water table, casing break Licensed driller or hydrogeologist; pump supplier
Water level falls year by year Static level each month Over-pumping or lower recharge Hydrogeologist; owner reduces use
Sand appears Sand tester Screen damage, pump too strong, pump too deep in silt Licensed driller
Turbidity or iron rises Laboratory test Screen or casing corrosion, new source Laboratory and driller
Taste or salt rises Conductivity Seawater influence, over-pumping Hydrogeologist and WRC

Action levels. The numbers that trigger a call (for example a fall in static level or in specific capacity) were not found in any source read. Leave blank: ______ metres fall in static level; ______ percent fall in specific capacity. A hydrogeologist fills them in for your borehole.

Rehabilitation methods named in the sources are brushing, surging, airlift and chemical treatment; they need a licensed driller and the WRC.

Safety protocol: supervising a pump pull and rehabilitation (crew leader)

Before you start

  • Electrician switches off, locks out and tests dead; you see the lock. Overhead lines and cables checked; power company informed.
  • Lifting gear inspected with current safe-working-load tags; trained crew only.
  • Exclusion zone marked; first-aider named; 112 plan.
  • Chemicals (if any) approved by the WRC and the specialist; PPE for chemicals ready.

While you work

  • Do hold a toolbox talk first; do keep the rope fixed to the pump.
  • Do not let anyone stand under a load or lean over the open casing; do not allow chemicals to be poured in without the specialist.
  • Do not work alone or in poor light.

After

  • Cap the borehole; coil cables; test run with the electrician; clean up; dispose of chemical water as the EPA or WRC advises (not verified).
  • Write the pull record: depth, condition, parts replaced; sign off the lock-out.
  • Report incidents and near misses.

Emergency

  • Call 112; isolate the power at the board only if safe; never enter the casing; for a dropped part call the licensed driller.

Tools and items for this unit

Item What it is and its use Size or type Who may handle Also called
Fishing tool (grab or hook) A tool lowered into a hole to catch a dropped part. Used by the mechanic or driller only. Per job Driller or mechanic grab; hook tool
Borehole camera A camera lowered down the casing to see screen condition, corrosion or breaks. Cable length to suit depth Driller or specialist downhole camera
Data logger and pressure transducer A sensor lowered into the borehole that records water level automatically. Used for long tests and monitoring. Range to suit depth Hydrogeologist or driller level logger; pressure transducer logger
Tool register and maintenance schedule A list of every tool, who holds it, its condition and when it was last checked. One sheet per kit You tool log
Lock and tag (lock-out set) A padlock and tag put on the switch so nobody can switch on while work is being done. Electrician rules apply. Per site Electrician padlock and tag; lockout kit
Tripod, pulley and hoist Lifting gear for lowering and pulling pump and pipe. Trained people only. Never exceed the safe working load. Safe working load in kg on the tag Trained crew A-frame; lifting tripod
Chlorine doser (drip or pump) A small pump or drip unit that adds chlorine to the tank or main continuously. Dose per hour Technician chlorinator; drip feeder
Sand filter, aeration tower and cartridge filter Treatment units. Aeration plus sand filtration removes iron and manganese. Cartridge filters catch fine particles. They do not remove salt. Flow rating Technician iron filter; aeration unit
Flushing valve (washout) Valve used to flush dirty water out of the system after disinfection. Pipe size Technician washout valve; drain valve

Check yourself

  1. Why record the static water level regularly?
  2. Who decides on rehabilitation work?
  3. Costs GH¢400 a month for 80 households: what does each pay if all pay?
06

Unit 5 · Establish your water-services business

A skilled person with no business is a worker. A skilled person with a legal, planned business can grow.

Competency standard

Learning outcome Performance criteria — the trainee…
5.1 Choose a legal form compares sole proprietor, partnership, company and cooperative
5.2 Register and get a tax identity lists the steps, bodies and 2026 fees
5.3 Find the licences that apply states which licences a pump and water-services business needs
5.4 Plan start-up and finance lists equipment, a budget and funding sources
5.5 Hire and protect explains staff, apprentices, insurance and safety duties
5.6 Write a one-page plan writes a plan and pitch

Range. A pump installation, service and water-testing support business. Evidence. One-page plan; start-up budget; oral questions.

Ask a qualified expert. Registration, tax, employment and loans need an expert. This is general information, not legal, tax or financial advice. Ask a qualified lawyer, check with GRA or a qualified accountant, and ask your bank or a licensed financial adviser before you register, hire or borrow. Fees change: confirm each one on the official page before you pay. Never advertise or do drilling, pump wiring or solar installation without the licence.

Which business?

At this level a sensible business is pump installation support, pipework, servicing, hand pump area-mechanic work, tank cleaning from outside and water-sampling runs, with certified electricians and licensed drillers as partners. Drilling is a separate heavy business with its own licence from the WRC; this module does not teach it, and the licence terms were not verified.

Legal forms and fees (ORC, 2026)

Form 2026 fee (GH¢) Notes
Sole proprietor business name 130; renewal 70 a year Owner has unlimited liability
Partnership 270; renewal 100 a year 2 to 20 partners; partnership agreement
Company limited by shares 585 plus capital duty (rate to check) At least 2 directors and a secretary
Company limited by guarantee 490 For NGOs, churches and social enterprises
Cooperative Not registered at the ORC Organisational TIN from GRA; department route not verified

Annual returns cost GH¢175 a year, with late fees of GH¢1,000 (1 to 4 years) or GH¢2,000 (5+ years). (All fees from ORC pages read 7 Oct 2026; check again.)

Tax identity and tax scheme

  • Your Ghana Card number has been your TIN since 1 April 2021; companies get a GRA TIN after ORC registration.
  • The Modified Taxation Scheme is for residents with business income only, not VAT-registered; turnover from GH¢20,001 to 750,000 pays 3 percent of turnover; professionals and owners of several businesses are excluded. GRA's own page still showed GH¢500,000 on 8 Oct 2026; check.
  • VAT from 1 January 2026: the registration threshold for goods is GH¢750,000; for services there is no turnover threshold, and a VAT-registered business cannot use the MTS. Whether your mix of selling pumps (goods) and installing (services) needs VAT registration is a question for GRA or a qualified accountant.
  • A company pays company income tax rather than using the MTS; ask GRA or a qualified accountant which rate and returns apply (not verified here).

Licences that may apply

Body When
Assembly (STMA) business operating permit For almost every business; fees in the fee-fixing resolution
Energy Commission Solar water pump installation: licence, CEWP and NVTI Grade 1 plumbing certificate
Water Resources Commission Drilling licence: only if you drill (not taught here)
Ghana National Fire Service, EPA Ask: depends on the premises and chemicals you store (not verified)

Premises, equipment and start-up budget (example)

Location with good returns: near farms, estates, schools and shops with tanks, with a lockable store, and near fittings suppliers. Start-up budget (example): tools GH¢6,000; opening stock of fittings GH¢1,500; phone and data GH¢150; first month's store rent GH¢500; working cash GH¢1,500. Total GH¢9,650 (6,000 + 1,500 + 150 + 500 + 1,500).

Money and help

Funding options: savings, a susu group, microfinance, banks, grants and government programmes. The 2026 Budget named a GH¢401 million Women's Development Bank, a GH¢170 million National Apprenticeship Programme and GH¢160 million for Adwumawura. The Ghana Enterprises Agency has Business Advisory Centres in Takoradi, Shama, Effia-Kwesimintsim, Mpohor and Ahanta West. The Assemblies' disability fund share was not verified in this book; ask the Assembly. Borrow only what the cash-flow forecast says you can repay. Only borrow from lenders licensed by the Bank of Ghana, and check insurers with the National Insurance Commission.

Hiring and protecting

  • Contracts. A worker engaged for six months or more needs a written contract, and a written statement of terms within two months; leave is 15 working days a year; maternity leave 12 weeks.
  • Pay. The minimum wage for 2026 is GH¢21.77 a day.
  • SSNIT. Employee 5.5 percent plus employer 13 percent of basic pay; register workers when hired; the employer pays by the 14th of the next month.
  • Apprentices. STMA says master artisans must register their trainees. No one under 18 may do hazardous work; follow Level 1.
  • Insurance. Ask a National Insurance Commission-licensed insurer about cover for tools, vehicles and public liability; compulsory covers were not verified.
  • Safety. Toolbox talks, PPE, lock-out, no confined-space entry; keep an accident book.

Marketing

WhatsApp Business with a service menu and prices; a Google Business Profile; a sign at the store; referrals from customers; a portfolio of finished jobs with dates (with permission); written quotes with a clear scope.

Accessibility

Persons with disabilities can run this business. Under the Persons with Disability Act 2006 you have the right to training and work. Workable roles: owner-manager, quoting and design briefs, record keeping, water-sampling runs, parts sales, customer care and online marketing, and supervising crews who do the lifting. Helpful changes: lifting help, accessible premises, large-print or voice checklists, assistive phone tools. Ask the Assembly and the Department of Social Welfare about support.

Start-up and fees

Example: you register as a sole proprietor (GH¢130) and keep the start-up budget above (GH¢9,650). You have GH¢5,000 in savings and a family loan of GH¢2,000. (1) Total cash needed including registration. (2) The gap. (3) Name two ways to close the gap.

One-page business plan

  1. Write your service menu, area, ten possible customers and ten competitors.
  2. List licences and registrations and the fee for each (cite the source or write "not verified").
  3. Work out a start-up budget and how you will fund it.
  4. Write your pricing rule and your first three marketing steps.
  5. Pitch the plan in three minutes to your trainer.

Ask the Business Advisory Centre

Find the nearest GEA Business Advisory Centre. Write the questions you would ask about support for a water-services business. Do not apply before your trainer has checked your plan.

Tools and items for this unit

Item What it is and its use Size or type Who may handle Also called
Water meter Counts the total water used, for billing and for the monthly record. Size of the supply pipe You water meter; totaliser
Pressure gauge A dial that reads pressure in bar or kPa. About 10 m of water head equals 1 bar. Fit on the pump outlet to check the duty point. 0 to 6 or 0 to 10 bar; thread BSP 1/4 or 1/2 inch You pressure gage; manometer
Dip meter (water-level tape) A reel of graduated tape with a probe that beeps or lights when it touches water. It gives the static and pumping water level from a fixed mark on the casing. Use before and during pumping. Tape 50, 100 or 150 m You (with trainer) water level meter; well sounder; dip tape
Hacksaw, pipe wrench, spanners and vice The plumber's hand tools: cut pipe, grip and turn pipe, tighten bolts, hold work. Pipe wrench 14 to 24 inch You pipe saw
Chain wrench A wrench with a chain that grips large pipe without crushing it. For pipe up to 6 inch Technician strap wrench
Tool register and maintenance schedule A list of every tool, who holds it, its condition and when it was last checked. One sheet per kit You tool log

Check yourself

  1. What is the 2026 ORC fee for a sole proprietor business name?
  2. Who must you not replace: a certified electrician or a plumber helper?
  3. What is the employee SSNIT rate?
07

Unit 6 · Bookkeeping and accounting for a pump and water-services business

Your pumps keep water flowing. Your books show whether your business keeps flowing too. See also the hub's Money Skills Level 2 and Entrepreneurial Thinking Level 2.

Competency standard

Learning outcome Performance criteria — the trainee…
6.1 Keep the records writes receipts, invoices and a cash book daily
6.2 Track stock, debtors and creditors keeps a parts stock record and lists who owes and who is owed
6.3 Price and break even works out cost, price, margin and break-even
6.4 Close the month reconciles cash, MoMo and bank and writes a profit statement
6.5 Know the taxes and records keeps records for the required time and knows the main tax dates

Range. One small business. Evidence. A month of books; income statement; balance sheet.

Ask a qualified expert. Tax and accounting rules change. Check with GRA or a qualified accountant before filing, and ask a licensed adviser before you borrow. All figures in this unit are examples, not Ghana price data, unless a source is named. This is general information, not tax or financial advice.

Separate your money

Keep owner money and business money apart: a separate MoMo wallet or account for the business. Take a fixed owner's drawing and write it in the cash book. Never pay personal bills from business cash without recording them.

Receipts and invoices

Give a receipt for every payment: date, customer, what for, amount, signature. Give an invoice for work not yet paid: number, date, customer, items, total, due date. Keep a copy of both. Records should be kept in Ghana for at least 6 years from the end of the year of assessment, longer if there is a dispute.

The cash book (example, November)

Date Detail Cash in Cash out Balance
1 Nov Opening balance 1,500
2 Nov Tank pipework job, Mr A (receipt 01) 1,344 2,844
3 Nov Fittings from shop 450 2,394
5 Nov Transport 80 2,314
7 Nov Service contract fee, Farm B (receipt 02) 400 2,714
9 Nov Helper's pay 120 2,594
10 Nov Pump bought from supplier 1,095 1,499
12 Nov Pump sold to Mr C (receipt 03) 1,400 2,899
20 Nov Owner's drawing 300 2,599
Totals 3,144 2,045 2,599

Check: opening 1,500 + cash in 3,144 − cash out 2,045 = 2,599. The total of the balance column must equal this.

Stock, debtors and creditors

  • Stock record: for each part, date, in, out and balance, and the cost. Count the shelf monthly and compare with the record.
  • Debtors are customers who owe you; list them with the date and age. Creditors are suppliers you owe. Pay on time but keep cash for wages.
  • Petty cash: a small float for small items, with a slip for each; top it up to the same amount each week.

Margin and mark-up

You buy a 1 HP pump for GH¢1,095 and sell it for GH¢1,400 (example prices). Profit = 1,400 − 1,095 = GH¢305. Mark-up = 305 ÷ 1,095 = 27.9% of cost. Margin = 305 ÷ 1,400 = 21.8% of price.

Depreciation (straight line)

Depreciation per year = (cost − salvage value) ÷ useful life. Tools cost GH¢6,000, salvage GH¢600, life 5 years: (6,000 − 600) ÷ 5 = GH¢1,080 a year = GH¢90 a month.

The monthly income statement (example)

Line GH¢
Installation jobs: 3 × 2,500 7,500
Service contracts: 10 × 400 4,000
Water-sampling runs: 6 × 150 900
Revenue 12,400
Parts and materials used 3,100
Gross profit 9,300
Wages: one helper 1,200
Employer SSNIT, 13% of 1,200 156
Transport 1,100
Phone and data 150
Store rent 500
Depreciation of tools 90
Total expenses 3,196
Profit before tax 6,104

Check: 12,400 − 3,100 = 9,300; 1,200 + 156 + 1,100 + 150 + 500 + 90 = 3,196; 9,300 − 3,196 = 6,104.

Break-even. Variable costs are parts 3,100 and transport 1,100 = 4,200. Contribution = 12,400 − 4,200 = 8,200 = 66.1% of revenue. Fixed costs = 1,200 + 156 + 150 + 500 + 90 = 2,096. Break-even revenue = 2,096 ÷ 0.661 = about GH¢3,170 a month.

The simple balance sheet (end of month, example)

Assets GH¢ Liabilities and equity GH¢
Cash 4,200 Supplier (creditor) 600
MoMo wallet 800 Loan 2,000
Parts in stock 1,500 Owner's capital 4,000
Tools (6,000 less 900 depreciation) 5,100 Profits kept 6,000
Customers owing (debtors) 1,000
Total assets 12,600 Total 12,600

Assets = Liabilities + Equity: 2,600 + 10,000 = 12,600. A trial balance is a partial check, not a proof.

Cash flow forecast (three months, example)

Month 1 Month 2 Month 3
Opening cash 1,500 3,300 5,800
Cash in 8,000 9,500 11,000
Cash out 6,200 7,000 7,800
Closing cash 3,300 5,800 9,000

Reconcile MoMo and bank

At month-end, compare the cash book with the MoMo or bank statement. Example: cash book MoMo balance GH¢800; statement GH¢775. The GH¢25 gap is charges not yet written in the cash book. Write the charge, and the two agree.

Tax records and dates

  • Modified Taxation: turnover of GH¢20,001 to 750,000 pays 3 percent of turnover. Example: annual turnover 12,400 × 12 = 148,800; 3% = GH¢4,464.
  • Employer SSNIT is due by the 14th of the next month; PAYE and withholding tax by the 15th.
  • PAYE 2026 monthly bands: first GH¢588 at 0%, next 80 at 5%, next 100 at 10%, next 2,900 at 17.5%, and so on; deduct the employee's SSNIT first.

Month-end for a small business

Example: opening cash GH¢1,000. Receipts: 2 jobs at GH¢1,200 and 1 service at GH¢300. Payments: parts GH¢900, transport GH¢150, helper GH¢400, drawing GH¢200. (1) Total cash in. (2) Total cash out. (3) Closing cash. (4) Profit for the month ignoring depreciation and drawings (count cash in less parts, transport and helper only). (5) PAYE for a helper paid GH¢1,200 a month, with employee SSNIT of 5.5 percent deducted first.

One month of books

  1. Make a cash book, receipt and invoice pad, stock sheet, debtors and creditors list.
  2. Using a case study supplied by your trainer, enter 20 transactions.
  3. Total the cash book and reconcile with a sample MoMo statement.
  4. Build an income statement, a balance sheet and a three-month cash forecast.
  5. Calculate break-even.
  6. Present the books to your trainer and say what they tell you.

Your own cash book

For one week, record all your own spending in a cash book as if it were a business. Total it and write what you notice.

Tools and items for this unit

Item What it is and its use Size or type Who may handle Also called
Tool register and maintenance schedule A list of every tool, who holds it, its condition and when it was last checked. One sheet per kit You tool log
Water meter Counts the total water used, for billing and for the monthly record. Size of the supply pipe You water meter; totaliser

Check yourself

  1. Write the straight-line depreciation formula.
  2. What is the difference between mark-up and margin?
  3. How long must records be kept in Ghana?
08

Unit 7 · Grow and sustain the business

Growth is not more jobs. It is better jobs, steady customers, a good name and a business that survives you.

Competency standard

Learning outcome Performance criteria — the trainee…
7.1 Build a quality system uses checklists, records and guarantees
7.2 Care for customers handles complaints and keeps contracts
7.3 Price and scale sets prices, adds services or staff and tests them with numbers
7.4 Win contracts and partners works with licensed drillers and electricians; bids for work
7.5 Present the capstone presents a one-page plan and a 12-month cash-flow forecast

Range. One enterprise. Evidence. Capstone presentation to a panel.

Ask a qualified expert. Contracts, loans, tax and succession need experts. Ask a qualified lawyer and a qualified accountant before you bid, borrow, take partners or plan for succession. Never take on work that needs a licence you do not hold. This is general information, not legal or financial advice.

Quality systems

  • A job card for every job: customer, date, what was found, what was done, parts, tests, who signed.
  • A commissioning record (Level 2) and a handover note for every installation.
  • A guarantee in writing: what is covered and for how long (set it from the supplier's guarantee).
  • Water-test follow-up: remind the customer to test yearly at an accredited laboratory.
  • Safety record: toolbox talk notes and near-miss log.

Customer care

Answer calls and messages; arrive when you say; explain in simple words; put every price in writing; never promise water you cannot guarantee; fix mistakes at your cost and learn from them. For a complaint: listen, record, check the facts, fix, follow up.

Pricing and scaling

Price from cost and margin (Unit 6), not from the cheapest competitor. Test every new service on paper first. Example: hiring a second helper at GH¢1,200 plus employer SSNIT GH¢156 costs GH¢1,356 a month. If the helper lets you do 4 extra service contracts at GH¢400, extra revenue is GH¢1,600 and the extra gross benefit after GH¢300 of parts is GH¢1,300, which is less than the extra cost: do not hire yet, or find more work first.

Partnerships, contracts and tenders

Partner with a licensed driller and a certified electrician; agree in writing who does what and who is responsible. Schools, clinics, estates and farms may issue written requests for quotations; answer with a clear specification and BOQ (Unit 2). Keep the records you need for loans: cash books, bank statements, invoices, tax papers and contracts. Ask a bank which documents it wants before you apply.

Ethics and succession

Do not take bribes or give them; do not tell a customer a borehole is safe to drink without a laboratory test; do not undercut safety to win a job. Plan for succession: write down procedures, train one person to run the books, keep contracts in writing, and ask a lawyer about a will and about continuing the business.

Water is a public good. Your work can protect or harm a whole community. When the choice is between a fast cheap job and a safe one, choose safe, and explain why.

The capstone

You present to a panel (an engineer, an accountant, a licensed contractor or business adviser) for 10 minutes plus questions:

  1. A one-page business plan: service menu, area, customers, competitors, licences, prices, start-up budget and funding.
  2. A 12-month cash-flow forecast: opening cash, cash in, cash out and closing cash each month, with your assumptions.
  3. A sample job file: design brief or BOQ, commissioning record, handover note and invoice.
  4. A one-minute safety statement: three things you will never do.

Forecast layout (use your own numbers; the first three months are shown in Unit 6).

Month Opening cash Cash in Cash out Closing cash
1
2
3
... to 12

Closing cash of one month is the opening cash of the next. Show a month where cash is tightest and how you will cover it.

Forecast and break-even

Example: monthly fixed costs GH¢2,096; the contribution margin is 66.1 percent. (1) What revenue is needed to cover fixed costs? (2) What revenue is needed to earn GH¢3,000 profit? (3) Complete: opening cash 2,000; cash in 7,000; cash out 5,500: closing cash? Then month 2 with cash in 8,000 and cash out 6,000.

Capstone preparation

  1. Complete your one-page plan and 12-month forecast.
  2. Assemble a sample job file.
  3. Rehearse the presentation twice with a partner and note the questions.
  4. Present to the panel.
  5. Record the panel's feedback in your logbook and write three improvements.

Ninety-day plan

Write what you will do in the first 90 days after the course: three actions in month 1, three in month 2, three in month 3.

Tools and items for this unit

Item What it is and its use Size or type Who may handle Also called
Tool register and maintenance schedule A list of every tool, who holds it, its condition and when it was last checked. One sheet per kit You tool log
Chlorine doser (drip or pump) A small pump or drip unit that adds chlorine to the tank or main continuously. Dose per hour Technician chlorinator; drip feeder
Data logger and pressure transducer A sensor lowered into the borehole that records water level automatically. Used for long tests and monitoring. Range to suit depth Hydrogeologist or driller level logger; pressure transducer logger

Check yourself

  1. Name two things a job card records.
  2. What is closing cash of month 1 also called in month 2?
  3. Name one thing you will never do.
09

Glossary

Term Meaning
As-built records The final record of what was actually built
BOQ Bill of quantities: items, units, rates and totals
Break-even The sales at which profit is zero
Competent / Not Yet Competent The two possible results of a CBT assessment
Contingency An allowance for unknowns
Depreciation The spreading of a tool's cost over its life
Operating point Where the pump curve meets the system's need
Provisional sum A placeholder amount for unpriced work
Specification The written standard of what is to be supplied
TDH Total dynamic head
Variation A change to the contract work or price
10

Logbook

Copy these pages into an exercise book. Your logbook is part of your assessment evidence.

  • Unit 1: demand sheet; design brief; dry-season test plan
  • Unit 2: specification; BOQ; as-built checklist; tender comparison
  • Unit 3: efficiency and cost sums; fault-finding report
  • Unit 4: maintenance plan; monitoring sheet and graph; cost recovery plan
  • Unit 5: one-page business plan; start-up budget
  • Unit 6: one month of books; income statement; balance sheet; forecast
  • Unit 7: sample job file; 12-month forecast; capstone feedback
  • Every homework, dated
11

Self-check quiz

  1. Write the formula for storage.
  2. Why design for the dry season?
  3. What is a provisional sum?
  4. Name two as-built records.
  5. Write the energy formula (kWh).
  6. Who tests a pump control box?
  7. Who decides on borehole rehabilitation?
  8. What is the 2026 ORC fee for a sole proprietor business name?
  9. How long must tax records be kept in Ghana?
  10. Write the straight-line depreciation formula.
  11. Sales GH¢1,400, cost GH¢1,095: what is the margin as a percentage of price?
  12. Name one thing you will never do on any job.
12

Appendix A · Engineer's data: Ghana hydrogeology

Honest data only. Every row says what the source is. Nothing here is a Western Region design value.

Ask a qualified expert. Hydrogeological interpretation is for a qualified hydrogeologist. These are published findings from other places and dates, not design values for your site. Ask the Water Resources Commission and the Ghana Geological Survey Authority.

Topic Finding Source and tag
Success by rock (Ashanti, 2,788 boreholes) Birimian about 90.6 percent; Tarkwaian about 79.5 percent; granitoids about 72.3 percent other region
Yield zones (Ashanti study) Medium 30 to 60 L/min; high over 60 L/min other region
Western Region iron Mpohor boreholes 0.17 to 0.58 mg/L
National picture Fractured and weathered zones are the most productive; aquifer geometry and safe yield are poorly known for most aquifers
Coastal plain, Western Region Sand and limestone aquifers described in an older survey dated
Coastal salinity Seawater intrusion an emerging issue; the Keta basin is one case
Handpump boreholes in three African countries (not Ghana) 19 percent were in aquifers too low in transmissivity for a handpump; at 38 percent of sites the cylinder was within 10 m of the water table international
Takoradi, Tarkwa, Axim yields and depths Not found Not verified: obtain from the WRC, a licensed driller or a hydrogeologist
13

Appendix B · Full test analysis

Ask a qualified expert. Test interpretation and safe yield belong to a qualified hydrogeologist. The method is a textbook method; the WRC may ask for a specific test length and format (not verified).

B1 · Step test (Hantush-Bierschenk method)

Model: s = BQ + CQ², where B is aquifer loss and C is well loss. Plot s ÷ Q against Q and fit a line: intercept B, slope C. Example (all numbers are examples): Q = 1.5, 3.0, 4.5, 6.0 m³/h with drawdowns 2.1, 5.2, 9.6, 15.5 m give s ÷ Q = 1.40, 1.73, 2.13, 2.58. A least-squares line gives B = 0.975 and C = 0.263. Well efficiency (aquifer loss ÷ total drawdown) is B Q ÷ (B Q + C Q²): 71 percent at 1.5, 55 percent at 3.0, 45 percent at 4.5 and 38 percent at 6.0 m³/h. Efficiency falls as the rate rises, so the pumping rate is a trade-off, decided by the hydrogeologist.

B2 · Constant-rate test: Cooper-Jacob

Plot drawdown against the logarithm of time; take the drawdown change Δs over one log cycle. Transmissivity T = 2.3 Q ÷ (4π Δs). Valid at later times when the aquifer response is steady. Example: Q = 18 m³/h = 0.005 m³/s and Δs = 1.2 m give T = 0.00076 m²/s = about 66 m²/day.

B3 · Recovery

After the pump stops, plot residual drawdown against t ÷ t' on a log scale; the same formula gives T. Example: Q = 18 m³/h and residual drawdown change 1.1 m per log cycle gives T = 0.00083 m²/s = about 72 m²/day (all numbers are examples). Agreement between the pumping and recovery values is a good sign. A recovery to 90 percent or more in a short time, as in the Level 2 example, suggests the aquifer is replenishing; a slow recovery warns of limited storage.

B4 · Interference

Pumping one borehole lowers the water level in others nearby. The spacing and rates are a hydrogeologist's decision; do not site a new borehole close to an existing one without advice.

B5 · Safe-yield decision tree

  1. Is the drawdown stable by the end of the constant-rate test? If not, reduce the rate and retest.
  2. Is recovery fast (at least about 90 percent in a reasonable time, a planning guide, not a Ghana rule)?
  3. Is the well efficiency acceptable (from the step test)?
  4. Does the dry-season check hold?
  5. Choose a planning rate at or below the tested yield, with a stated share (example 70 percent), and write the reasons.

B6 · Blank test analysis sheet

Step Q (m³/h) s (m) s ÷ Q Notes
14

Appendix C · Borehole design

Ask a qualified expert. Borehole design is for a licensed driller and a hydrogeologist. These are widely used international practices, not Ghana rules.

Item Practice (international, labelled) Source
Screen slot size With a sieve analysis, choose a slot that retains 40 to 60 percent of the formation
Gravel pack Uniform gravel just slightly larger than the slots; local angular rock is discouraged; none in the top 3 to 6 m
Annulus size 3-inch casing in a 6-inch hole leaves a 1.25-inch pack; larger screens make the pack ineffective
Centralisers Keep the screen off the wall, spread grout and pack evenly
Development Continue until clear and fine material is removed; surging is most common; overpumping simplest but least effective
Completion record The RWSN Code has a suggested format
Casing and pump The casing must be large enough for the pump and the cable; check the pump diameter against the casing inside diameter in the maker's sheet

Drilling methods. A down-the-hole air hammer is used in hard rock, mud rotary in soft formations, and cable tool in some soils; the driller chooses (general knowledge; not a Ghana rule).

Checks on the finished hole. Verticality, depth against the contract, clear water and sand content after development, level readings, and a clean completion record.

15

Appendix D · Pump system design checks

Ask a qualified expert. Pump system design is for a GhIE-registered engineer, with a certified electrician for electrical parts and a licensed installer for solar. These are checks, not a full design.

Check Method Example
Duty point Pump curve against system curve See the Level 2 operating point
Friction Hazen-Williams with C about 150 75 mm at 6.7 m³/h: about 0.26 m per 100 m
Velocity Flow ÷ pipe area 6.67 m³/h in 75 mm = 0.42 m/s
Surge Joukowsky 4 bar for 1.0 m/s in PVC
VSD Affinity laws Speed ratio 0.8: 0.8, 0.64, 0.512
Generator sizing Size from the motor starting current, not only the running power; ask the electrician and supplier Example: a 2.2 kW motor may need a generator several times larger
Solar matching Controller datasheet voltage and power limits; daily energy ÷ (sun hours × system efficiency) 12.6 kWh ÷ (5 × 0.75) = 3.4 kWp (example)
Lightning Earthing and surge protection by the electrician
16

Appendix E · Standards and law crosswalk (Ghana first, then international)

Ask a qualified expert. This is a guide to where rules sit, not legal advice. Ask the Water Resources Commission, the Energy Commission, the Ghana Standards Authority, GhIE and a qualified lawyer for current texts.

Rule or standard Origin What it says (as read) Check
L.I. 1827 Drilling Licence and Groundwater Development Regulations 2006 Ghana Licence needed to drill; a summary says contractors notify the Commission and keep and submit well records; the Commission keeps a public register of licences; a three-year validity was reported but not confirmed Read the gazetted text
L.I. 1692 Water Use Regulations 2001 Ghana Permit categories; exemption threshold not verified Ask the WRC
Energy Commission solar pump licence Ghana Licence plus CEWP plus NVTI Grade 1 plumbing Ask the Energy Commission
Engineering Council Act 819 and L.I. 2410 Ghana Registration of engineers (not verified; ask GhIE for the correct title) Ask GhIE
GS 175 drinking water Ghana Draft read; final not read Ghana Standards Authority
CWSA small-community guidelines 2010 Ghana Community management model Ask CWSA
RWSN Code of Practice for Cost-Effective Boreholes 2010 International Good practice for borehole quality and records Label as international
WHO Guidelines for drinking-water quality International Health-based values Compare with GS 175
WHO sanitary inspection packages 2024 International Forms for tubewell with hand pump and borehole with motorised pump Adapt; keep the lab test
OSHA 29 CFR 1926.1408 International (USA) Clearance from overhead lines Ask the power company
Hazen-Williams, Joukowsky, Cooper-Jacob International methods Formulas used in this book Engineer to check
AWWA C654 and A100 International (paid) Cited only as names of well disinfection and well construction standards; not read Buy and read before use (not verified)
17

Appendix F · Contract documents

Ask a qualified expert. Contract wording must be checked by a qualified lawyer and the licence conditions of the Water Resources Commission copied in. These are sample headings and clauses, not legal advice.

F1 · Specification clause library (sample wording)

  1. The Contractor shall hold a current Water Resources Commission drilling licence and shall notify the Commission before drilling begins.
  2. The Contractor shall keep a log of every rock layer and give the Owner a copy at completion.
  3. The Contractor shall supply and use development equipment and a test pump and instruments that can run the full test.
  4. The Contractor shall carry out a step test, a constant-rate test and a recovery test and give the Owner the recorded data.
  5. The Contractor shall disinfect the borehole and deliver water samples to an accredited laboratory.
  6. The Contractor shall give the Owner a completion record in the format agreed.
  7. Overhead lines and buried cables shall be located and marked before work, and the power company contacted.
  8. Payment shall follow checked stages.

F2 · Tender score sheet

Criterion Weight (example) Bidder A Bidder B
Price 50
Technical fit and equipment list 30
Licences and references 20
Total 100

F3 · Variation order

Item Entry
Variation number and date
Description of change
Reason
Cost change (GH¢)
Time change
Signed: owner, contractor

F4 · Certificate of completion and as-built checklist

  • Borehole log, depth, casing and screen details
  • Test records (step, constant-rate, recovery) and analysis
  • Water test report and disinfection record
  • Pump make, model, setting depth and curve
  • Cable, pipe route and tank details; valve positions
  • Electrician's certificate; guarantee papers
  • WRC registration reference (not verified: ask the WRC)
  • Owner's signature and date
18

Appendix G · Worked complete design from brief to cost

All numbers are examples; arithmetic checked by script. An engineer must review a real design.

Ask a qualified expert. A real design needs a hydrogeologist, a GhIE-registered engineer, a certified electrician and, for solar, a licensed installer. The tariff and prices are assumed examples.

Brief. A 1 ha vegetable farm with drip irrigation needing 4 L per square metre per day.

  1. Demand. 1 ha = 10,000 m² × 4 L = 40,000 L = 40 m³/day.
  2. Pump flow. Pump 6 hours: 40 ÷ 6 = 6.67 m³/h.
  3. Source check. Tested yield 10 m³/h; planning share 70 percent = 7 m³/h; 6.67 is below it.
  4. Drawdown. Specific capacity 1.4 m³/h per m: 6.67 ÷ 1.4 = about 4.8 m; use 5 m.
  5. Head. Static 25 m + drawdown 5 m + lift to the tank 6 m + friction 1 m (75 mm pipe at 6.67 m³/h is 0.26 m per 100 m; fittings add) + drip pressure 15 m = TDH 52 m.
  6. Power. 6.67 ÷ 3.6 = 1.852 L/s; hydraulic power 52 × 1.852 × 9.81 = 945 W; at 45 percent overall efficiency, 2.10 kW.
  7. Energy. 2.10 kW × 6 h = 12.6 kWh/day; 378 kWh in 30 days; at an assumed GH¢2.00 per kWh, GH¢756 a month and about GH¢9,195 a year. Read your own ECG bill for the real tariff (not verified).
  8. Solar option. 12.6 ÷ (5 sun hours × 0.75 system factor) = 3.36 kWp of array (example factors). Divide any solar quote by GH¢9,195 for a simple payback in years.
  9. Storage. Half a day of demand = 20 m³ = four 5,000 L tanks; at the example GH¢7,815 each, GH¢31,260.
  10. Water test and permits. Laboratory test; WRC registration and permit questions.
19

Appendix H · Case studies and what went wrong

Ask a qualified expert. Cases are for learning. Do not copy a fix without a qualified expert checking your own site.

Case What happened Cause Next time
1. Dry borehole Hole paid for gave no useful water No siting assessment Desk study, site walk, survey
2. Pump rated too high Failed after days Label far above delivered flow Curve and bucket test
3. Skipped steps Muddy water No development or test Contract the steps and records
4. Gush near power lines Water shot up near lines Lines and cables not checked Power company first
5. Hand pump seals Pump idle No spare seals Spares kit and mechanic
6. Africa-wide study Many handpump boreholes poor Corroded or damaged rising mains; cylinder near the water table; aquifers too weak Better parts, pump depth and siting
20

Appendix I · Reading list

International references (not Ghana law): Kruseman and de Ridder, Analysis and Evaluation of Pumping Test Data; the Lifewater drilling manual; the RWSN Code of Practice; the Afridev manual; WHO guidelines. Others named but not read for this book: Driscoll, Groundwater and Wells; Misstear et al., Hydrogeology for Water Engineers and Scientists; Karassik et al., Pump Handbook.

21

Appendix J · Tools and Items Glossary (specification names and sizes)

Specification wording: in a contract or BOQ, name each item with its standard name, size, material and pressure class, and say where the maker's data sheet is. Local names differ from town to town: use the standard name and show the picture or the part. The last column gives other common names.

Item What it is and its use Size or type Who may handle Also called
Adaptors, nipples, unions and flanges Join the pump to the pipe and one pipe to another. BSP or NPT thread; size Technician pipe fittings; couplings
Air release valve and vacuum breaker Let trapped air out of a pipe and let air in to prevent a vacuum. Fit at high points. Size to suit the pipe Technician air vent; air release valve
Airlift (compressor and eductor pipe) Uses compressed air to lift water and mud from the hole during development. Per driller Driller air-lift development
Bailer and surge block Development tools. A bailer lifts mud out; a surge block moves water in and out of the screen to loosen fines. Per driller Driller sand bailer; mud bucket
Barrier tape and cones Mark an open borehole or work area so people and children keep away. Visible colour You danger tape; safety cones
Bobbin and rod centraliser Plastic guides that keep the pump rod in the middle of the rising main so it does not rub. Per pump model Area mechanic rod guide; centraliser
Booster pump Raises pressure from a tank to taps or sprinklers. HP Technician pressure booster pump
Borehole camera A camera lowered down the casing to see screen condition, corrosion or breaks. Cable length to suit depth Driller or specialist downhole camera
Breaker (MCB), RCD and fuse Switch off on overload or earth fault. The RCD protects people from shock. Amps; RCD mA set by the electrician Electrician circuit breaker; MCB; trip switch
BSP and NPT threads Two pipe thread standards. They look alike but do not seal together; match them. Per fitting Technician pipe thread
Cable splice kit (heat-shrink) Waterproof joint between motor lead and drop cable. A bad joint is a common cause of burn-out. Size to suit the cable Electrician cable joint kit; waterproof joint
Capacitor Helps a single-phase motor start and run. Often inside the control box. uF Electrician run capacitor; start capacitor
Casing Plain pipe lining the borehole so it does not collapse and so water from above cannot get in. uPVC, steel or HDPE; diameter 100 to 200 mm Driller well casing; lining pipe
Chain wrench A wrench with a chain that grips large pipe without crushing it. For pipe up to 6 inch Technician strap wrench
Check valve (non-return valve) Lets water flow one way only so the pipe does not drain and the pump does not spin backwards. Same size as the pipe; spring or swing Technician non-return valve (NRV); one-way valve
Chlorine (HTH granules or liquid bleach) The disinfectant. HTH is strong granular calcium hypochlorite (strength on the label); household bleach is weaker (often 3.5 to 5 percent: read the label). Strength on the label You (with trainer) calcium hypochlorite; sodium hypochlorite (bleach)
Chlorine doser (drip or pump) A small pump or drip unit that adds chlorine to the tank or main continuously. Dose per hour Technician chlorinator; drip feeder
Chlorine test kit (DPD comparator) A small kit that turns pink in proportion to free chlorine. Use after disinfection to check the level. 0 to 5 mg/L You chlorine comparator; pool test kit
Clamp meter Reads motor current by clamping round one wire, without cutting it. Compare the reading with the motor nameplate current. AC amps range to suit the motor Electrician clamp-on ammeter; tong tester
Clean hose, bucket and jug for sampling Clean tools for taking a sample without touching the inside of the bottle. Clean and rinsed You sampling hose
Concrete apron, drain and soak-away A concrete slab around the borehole head that sheds spilt water into a drain. Dimensions set by the designer You (assist) platform; pump base; wash slab
Conductivity (EC) or TDS meter Measures dissolved salts as electrical conductivity (uS/cm) or total dissolved solids (mg/L). A quick check for salty water, important near the coast. Use before and during pumping. 0 to 2,000 uS/cm or wider You EC meter; TDS meter; salinity meter
Control box or starter (DOL, star-delta) Switches and protects the motor. Opening it is electrician-only work. kW; phase Electrician starter; motor starter; control panel
Cup seal (piston seal) and U seal Rubber lips that seal the plunger against the cylinder wall. They wear first and are the most frequent repair on community hand pumps. Per pump model; use maker parts Area mechanic piston seal; bucket seal; U-seal
Cylinder and plunger (piston) The cylinder sits in the water. The plunger moves inside it and lifts water on each stroke. Per pump model Area mechanic pump cylinder; working barrel
Data logger and pressure transducer A sensor lowered into the borehole that records water level automatically. Used for long tests and monitoring. Range to suit depth Hydrogeologist or driller level logger; pressure transducer logger
Dip meter (water-level tape) A reel of graduated tape with a probe that beeps or lights when it touches water. It gives the static and pumping water level from a fixed mark on the casing. Use before and during pumping. Tape 50, 100 or 150 m You (with trainer) water level meter; well sounder; dip tape
Drilling rig, compressor, DTH hammer, drill bit, drill rods and mud pump The driller's machine and tools. A down-the-hole (DTH) hammer breaks hard rock with air; a mud pump circulates drilling fluid. You only need the names. Never operate them. Per driller Driller drill rig; drilling machine
Drop cable (submersible cable) Waterproof cable from the control box down to the motor. mm2; cores; length Electrician submersible cable; flat pump cable
Earth rod, earth wire and surge arrester Give fault current a safe path to ground and lead lightning surges away. Electrician only. Per electrician Electrician grounding rod; earth electrode
First-aid kit Dressings, gloves and washing water. For injuries get a doctor or nurse; call 112 in an emergency. Kept complete You first-aid box
Fishing tool (grab or hook) A tool lowered into a hole to catch a dropped part. Used by the mechanic or driller only. Per job Driller or mechanic grab; hook tool
Float switch (tank) A float that rises with the water and stops or starts the pump at set levels. Type to suit the control Electrician and you float control; tank level switch
Flow meter (inline) A meter in the pipe that shows flow rate (L/s or m3/h) and total volume. Gives a better reading than a bucket on large pumps. Same size as the pipe You flow-rate meter; inline meter
Flushing valve (washout) Valve used to flush dirty water out of the system after disinfection. Pipe size Technician washout valve; drain valve
Foot valve A check valve with a strainer at the bottom of a suction pipe. Keeps a surface pump primed. Suction pipe size Technician bottom valve; suction strainer valve
Galvanised steel pipe Steel pipe with a zinc coat, used where strength is needed. It rusts in aggressive water. 1 to 3 inch Technician GI pipe; steel pipe
Gate, ball, globe and butterfly valves Four valve types. Gate and ball valves are for on or off; globe valves throttle flow; butterfly valves are for large pipes. Pipe size; PN Technician sluice valve; stop valve
Generator Backup power. See Small Engines in this library. Size by the motor starting current, not only its running power. kVA Electrician gen set; standby generator
Gravel pack (filter pack) Clean, rounded, sized gravel around the screen. It holds back fine sand and keeps the slots open. Grain size in mm; volume Driller filter pack; gravel filter
Hacksaw, pipe wrench, spanners and vice The plumber's hand tools: cut pipe, grip and turn pipe, tighten bolts, hold work. Pipe wrench 14 to 24 inch You pipe saw
Hand pump (Afridev, India Mark II, Nira, Vergnet) A pump worked by arm or foot with no electricity. Afridev and India Mark II lift water with a handle, rods and a cylinder in the borehole; Nira and Vergnet are other designs on the CWSA list. India Mark II lifts to about 50 m Area mechanic village pump; community pump
Hardness test kit A drop-count kit that shows how hard the water is (scale on pipes and heaters). mg/L as CaCO3 You hardness drop test
HDPE and uPVC pipe Two plastic pipes. HDPE is flexible and joined by welding or compression fittings; uPVC is stiff and joined by solvent cement or threads. Both carry a pressure class (PN). Outside diameter 32 to 110 mm; PN6 to PN16 Technician poly pipe; PE pipe; PVC pipe
Insulation tester (megger) Applies a test voltage (often 500 V DC, but use the maker's value) to find leaks from the motor or cable to earth. Used before and after pump installation. 500 V or 1,000 V Electrician insulation resistance tester; megohmmeter
Iron test kit A quick field kit for iron in mg/L. Does not replace a laboratory test. 0 to 5 mg/L You iron test kit; colour test kit
Isolation valve (gate or ball valve) Opens or shuts the flow so one part can be cut off for repair. Pipe size; PN You stop valve; shut-off valve
Jetting tool Sprays high-pressure water through the screen slots during development. Per driller Driller hydro-jetting tool
Level probe (borehole) Sensor that cuts the pump if the borehole water falls too low. Cable length to suit setting depth Electrician dry-run probe; low-level electrode
Lock and tag (lock-out set) A padlock and tag put on the switch so nobody can switch on while work is being done. Electrician rules apply. Per site Electrician padlock and tag; lockout kit
Marked bucket (20 L) A bucket with the volume marked on it. Fill it from the spout or pipe and time it to measure flow (bucket test). Use at hand pumps, taps and pump outlets. 20 L; mark the full line with a measured jug You pail; measuring bucket
Measuring jug and clean bucket Measure and mix the dose of chlorine. 1 L jug; 10 to 20 L bucket You measuring cup
MPPT (maximum power point tracker) Electronics in the controller that keeps the panels at their best working point as sun changes. Per controller Licensed installer solar pump controller; charge controller
Multimeter Reads volts, ohms and sometimes amps. Used by the electrician; you only watch and record the reading. Check the category rating on the label Electrician multitester; volt-ohm meter
Orifice plate and weir Flow-measuring devices used in larger systems and tests. Per site Engineer flow orifice
Overload relay, dry-run and phase-failure protection Devices that stop the motor if it overheats, runs dry or loses a phase. Per maker Electrician thermal overload; motor protector
pH meter or pH strip Shows how acid or alkaline the water is, on a scale of 0 to 14. Use on a fresh sample. 0 to 14 You pH tester; pH strip
Pipe clamp (lifting clamp) Holds the pipe at the wellhead while the next length is joined. Pipe size Trained crew lifting clamp; pipe elevator
Pitless adapter A fitting that lets water leave the casing below ground and still lets the pump be pulled out. Casing size Technician pitless unit
PPE: boots, gloves, safety glasses, hard hat and apron Protective gear for the eyes, hands, head and feet. Chemical gloves and glasses are needed for chlorine. Fit and size per person You safety gear; protective clothing
Pressure gauge A dial that reads pressure in bar or kPa. About 10 m of water head equals 1 bar. Fit on the pump outlet to check the duty point. 0 to 6 or 0 to 10 bar; thread BSP 1/4 or 1/2 inch You pressure gage; manometer
Pressure relief valve Opens at a set pressure to protect pipe and tank. Set pressure in bar Technician safety valve; pressure relief
Pressure switch Starts and stops the pump by pressure in a pressure system. Set range in bar Electrician pressostat; pressure control
Pressure vessel (tank with an air cushion) A steel tank with an air bag that stops the pump switching on and off too often. Litres; bar rating Technician expansion vessel; accumulator; pressure tank
PTFE tape, jointing compound and solvent cement PTFE tape seals threaded joints; jointing compound seals larger threads; solvent cement welds uPVC pipe joints. Per product label You thread seal tape; plumber's tape
Pump end and motor The two halves of a submersible set. The pump end has the stages that lift; the motor sits below it. Stages; kW Technician wet end; stage pack
Pump head, handle and fulcrum The part above ground that you move. The handle turns the hand movement into up and down rod movement. Per pump model Caretaker pump head assembly
Pump rod and rod coupling Rods inside the rising main that carry the up and down movement to the plunger. Couplings join rods. Stainless steel or fibreglass; per metre Area mechanic sucker rod; lift rod
Resistivity set and GPS Instruments used by the hydrogeologist or driller to site a borehole. A trainee only needs the names. n/a Hydrogeologist resistivity meter; survey set
Rising main (drop pipe) The pipe that carries water from the pump up to the surface. uPVC, HDPE or galvanised steel; size; pressure class PN Technician drop pipe; riser pipe; column pipe
Safety rope or wire, cable clips and tape A rope fixed to the pump that holds it if a pipe joint fails. Clips and tape hold the cable to the pipe. Rated for the pump weight plus margin Technician safety wire; lifting rope
Sample bottles Sterile bottles from the laboratory for germ tests and clean bottles for chemistry. The laboratory tells you which and how to keep the sample. 250 or 500 mL You sample container; sample jar
Sand filter, aeration tower and cartridge filter Treatment units. Aeration plus sand filtration removes iron and manganese. Cartridge filters catch fine particles. They do not remove salt. Flow rating Technician iron filter; aeration unit
Sand tester (Imhoff cone) A clear cone that lets sand in a litre of pumped water settle so you can read it. Use after development and in the first weeks. 1 L cone You (with trainer) Imhoff settling cone; sand cone
Sanitary seal (cement or bentonite grout) A sealed collar near the top of the annulus so dirty surface water cannot run down the outside of the casing. Depth and material set by the driller Driller annular seal; grout seal; sanitary grout
Screen (slotted casing) Slotted pipe opposite the water-bearing layer. Water enters through the slots; sand is kept out. Slot size in mm; open area Driller well screen; slotted casing; strainer pipe
Screwdrivers, hammer and pliers Basic hand tools for the hand pump and tank. Standard sizes You hand tools
Solar panel (PV module) and array A panel makes DC power in daylight. An array is panels joined together. Wires can be live even when the pump is off. Wp per panel; number Licensed installer solar panel; PV panel
Solar pump and controller A pump driven by solar panels. The controller (with MPPT) converts and protects. Array kWp; voltage; flow and head Licensed installer solar borehole pump; PV pump
Spares kit (seals, rod couplings, bobbins and bolts) A box of the parts that wear most, kept by the committee so repairs are quick. Per pump model Committee and mechanic seal kit; repair kit
Stopwatch Times how long the bucket takes to fill. A phone stopwatch is fine. Seconds You timer
Submersible pump Pump and motor in one unit hung under the water. The pump end lifts the water and the motor drives it. Use for deep boreholes. Diameter 3, 4 or 6 inch; kW; single or three phase Electrician and technician submersible borehole pump; deep-well pump
Sump and centraliser The sump is a plain pipe below the screen where silt settles. Centralisers keep the casing in the middle of the hole. Casing size Driller tail pipe; bottom cap
Surface pump (jet or centrifugal) A pump above ground that sucks water up. Suction lift is limited to a few metres. Use from tanks and shallow sources. HP; suction size Technician centrifugal pump; jet pump; self-priming pump
Tank level gauge A float or sight tube that shows how full the tank is. Used in the monitoring log. Marked in litres You level gauge; sight tube
Tank, stand, overflow, vent screen and manhole cover Tank stores water; stand lifts it for pressure; overflow carries surplus away; vent screen keeps insects out; manhole cover is the lockable lid. Litres; plastic or concrete You (assist) storage tank; reservoir
Tape measure, plumb bob and spirit level Measure lengths and heights, hang a vertical line, and check that a tank base is level. 5 m to 30 m tape You measuring tape; plumb line and level
Test strips and colour comparator Small paper strips or colour charts for quick checks on pH, chlorine and hardness. Per product You test paper; colour chart
Test-pumping pump and generator (contractor's) The driller's test pump and its power for the yield test. Check that it can run the full test period. Flow and head to suit the test Driller contractor's test pump
Thermometer Reads the water temperature. Warm water cools a motor less well and changes chlorine action. 0 to 50 C You water thermometer
Tool register and maintenance schedule A list of every tool, who holds it, its condition and when it was last checked. One sheet per kit You tool log
Torque arrestor A rubber collar that stops the pump set twisting at start-up. Fits the casing and pump size Technician torque arrester; anti-twist collar
Tripod, pulley and hoist Lifting gear for lowering and pulling pump and pipe. Trained people only. Never exceed the safe working load. Safe working load in kg on the tag Trained crew A-frame; lifting tripod
Turbidity tube or meter A clear tube or meter that shows how cloudy the water is (NTU). Use for muddy or sandy water. NTU range You turbidity meter; clarity tube
V-notch weir or flow tank A tank with a triangular notch used to measure large flows during a test. Per specification Driller weir tank
Variable speed drive (VSD) Electronic unit that changes motor speed. Gives soft start and lets flow match need. Needs cooling flow past the motor kept up. kW; single or three phase Electrician variable frequency drive (VFD); inverter drive
Verticality and alignment check A check that the casing is straight enough for the pump to go down and not rub. Per specification Driller plumbness check
Voltage tester (phase tester) Proves a wire is live or dead before any work. Never trust a switch; test, then work. Rated for the voltage Electrician test pen; voltage detector
Warning sign and fence A sign and fence around the water point to keep animals and children out. Visible You guard fence; warning board
Water meter Counts the total water used, for billing and for the monthly record. Size of the supply pipe You water meter; totaliser
Water-level indicator for observation holes A slim dip meter used in monitoring holes to measure levels of other boreholes during a test. Tape 50 to 150 m Hydrogeologist observation-well dip meter
Weighted tape (chalked tape) A cheap steel tape with a weight. Chalk the end; the wet mark shows the depth to water. Use when no dip meter is available. Tape 30 to 100 m You chalked tape; steel tape
Wellhead (well cap and seal plate) The top closure of the borehole. It carries the pipe and cable and keeps dirt and insects out. Fits the casing size Technician well cap; well seal; sanitary cap

Tool register. For each tool: name, serial or mark, who holds it, condition, last check date, next check date.

22

Appendix K · Index

Look for Go to
Action levels Unit 4
Case studies Appendix H
Contract clauses Appendix F
Design checks Appendix D
Hydrogeology data Appendix A
Rehabilitation Unit 4
Standards crosswalk Appendix E
Step test Appendix B
Surge Unit 3
Test-pumping set-up Unit 2
Tools and items Appendix J
Worked design Appendix G
23

Further reading and sources

Best next reads: the WRC website; pump makers' manuals; the hub's Money Skills Level 2 and Entrepreneurial Thinking Level 2; the GEA Business Advisory Centre; Basic Plumbing and Solar Energy in this library.

What this module does not cover: drilling, pump wiring, solar installation work, treatment plants, hydrogeological modelling, and current Ghana prices (blog estimates only; ask suppliers and licensed drillers for written quotes).

Every source used in this manual is listed, with links, in the Teacher Copy.

One application of the Cold-Start Learning Kit, which stays general-purpose and can build a guide on any topic in any field. Written in CTVET format; not a CTVET curriculum.