About this module
At Level 3 the hard questions come to you: the fault nobody could find, the site nobody has surveyed, the junior who is unsure, and the bank balance at the end of the month.
Who it is for. Technicians who are Competent at Level 2, and experienced installers who want to lead a team or run their own business. In Ghana's TVET framework, National Proficiency II leads on to National Certificate I. This module works at an advanced level comparable to National Certificate I: you work with little supervision, handle problems that are not routine, supervise others and can run your own enterprise.
CTVET status. CTVET lists Computer Hardware and Software, IT Infrastructure, Telecom and Networking, and Electronic Security System programmes. This module is not a CTVET curriculum and gives no CTVET certificate. It follows CTVET's format.
Bridge from Level 2: what you already know
- The six-step fault-finding method; PSU testing from the outside; SMART and heat checks; diagnosis reports
- Laptop part swaps, re-pasting, firmware settings, data rescue without snooping
- Office Windows set-up: standard accounts, encryption with the owner keeping the key, offline backups, ransomware drill
- Shared printers with reserved addresses; laser fuser safety; UPS sizing
- Patch panels, keystone jacks, labelling, IP plans, access points, network documents, the NCA hotspot rule
- IP CCTV design: camera choice, IP ratings, PoE budgets, storage for the agreed days, remote viewing without open ports, the owner's privacy plan and handover pack
- Pricing, maintenance agreements, capability sheets
The safety and legal gates do not change: no mains wiring (Energy Commission certified electricians only); never open a PSU or hard drive; ladders by the rules with a partner; customers' data and footage stay private.
Link to other Hub courses. General bookkeeping and venture skills are taught in the Hub's Money Skills Level 2 and Entrepreneurial Thinking Level 2. User ICT skills and business-centre services are in Basic ICT Skills (Levels 1–3); phone and board-level repair in Phone and Electronics Repair. This book goes deeper and stays specific to an IT support and CCTV installation business.
How the module works
Each unit has learning outcomes, performance criteria, the range and the evidence your assessor needs, and you are judged Competent or Not Yet Competent. Units 1–4 are advanced technical and leadership skills; units 5–7 build your business. Every unit has a practical task, homework, exercises with worked answers where there are sums, and Check yourself questions.
Unit 1 · Hard faults, root cause and quality control
A junior fixes the symptom. A lead technician finds why it happened, stops it happening again, and proves the shop's work is good every time.
Competency standard
| Learning outcome | Performance criteria — the trainee… |
|---|---|
| 1.1 Solve intermittent faults | plans and runs tests that reproduce an intermittent fault, and records the evidence |
| 1.2 Find the root cause | uses the "5 whys" and a fault log to find and remove the root cause of repeat faults |
| 1.3 Control quality | applies a final quality check to every job and keeps a returns and warranty log |
| 1.4 Buy good parts | checks parts and cable for quality and fake goods, and keeps supplier records |
Range. At least three intermittent or repeat faults; one month of the training workshop's job cards for quality review. Evidence. Test plans and results; root-cause reports; quality checklists; returns log; supplier register.
Intermittent faults: make the fault show itself
An intermittent fault comes and goes. The customer says "it switches off sometimes"; on your bench it works. You must make it happen while you watch.
- Get the pattern. When does it happen: after 20 minutes, when it rains, when the generator comes on, when the printer prints, when the laptop is moved?
- Recreate the conditions. Run a heavy load for an hour (heat), move the cable gently (loose contact), run on the customer's power source, use the customer's charger.
- Watch and log. Note temperatures, voltages from a PSU tester, Windows event logs, drive SMART counts.
- Swap one part at a time with a known-good part, and run the same test again for the same time.
- Prove the fix by running the test at least twice as long as it took the fault to appear.
| Intermittent symptom | Likely causes to test |
|---|---|
| Switches off under load | Overheating; PSU rail dropping below limits (±5% of nominal); poor power at the site |
| Freezes, then recovers | Failing drive (rising pending or reallocated sectors); memory |
| Network drops at certain times | Loose plug; damaged cable; Wi-Fi channel crowded at busy hours; DHCP pool full |
| Camera goes offline at night | IR draws more power at night: PoE budget or long cable; water in a joint |
| Camera offline after rain | Water in an outdoor joint; wrong IP rating for the position |
Root cause: the "5 whys"
Ask "why?" until you reach something you can change.
Problem: The school's lab computers keep losing their files. Why? Students save to the desktop, and the computers are re-imaged each term. Why? Nobody told them to use the shared folder. Why? The shared folder is slow. Why? The lab switch runs at 100 Mbps on a damaged cable to the server room. Why? The cable was crushed under a door when it was laid. Root cause: a crushed cable. Fix: replace and re-route the cable in trunking, retest at gigabit, teach students to use the shared folder.
Keep a fault log for every customer site: date, symptom, cause, fix, who did it. Repeat faults on the same site are a sign the root cause was not found.
Quality control on every job
- Job card complete: customer's complaint, diagnosis, parts with serial numbers, time, price agreed before work
- Data check: backup taken where needed; no customer data kept on the bench after handover
- Function test: the original complaint tested for long enough, plus keyboard, screen, ports, Wi-Fi, sound
- Neatness: all screws in, cables tied, no fingerprints or dust, labels where needed
- Network and CCTV: every cable tested and labelled; recording days checked after 24 hours; firmware and passwords changed
- Paperwork: handover sheet, warranty terms, invoice
- Second check by another technician on every installation and on a sample of repairs
Returns and warranty log. Record every job that comes back: date, original job, what failed, whose fault (part, workmanship, customer use), cost to fix. Review it monthly with the team. If more than a small share of jobs return, find the root cause.
Return rate (example figures)
In September the workshop finished 84 repair jobs and 12 installations. 5 repairs and 2 installations came back under warranty. Each repair return cost GH¢80 in time and parts and each installation return GH¢250.
- What percentage of repairs came back? Of installations?
- What did the returns cost in total?
- A second-check procedure would cost 20 minutes per job at GH¢60 an hour. Would it pay for itself if it halved the returns?
Buy good parts
- Cable: the copper cable standard requires copper conductors, so copper-clad aluminium (CCA) cable does not comply. Ghana listings in October 2026 offered both CCA and "pure copper" Cat6. Buy copper; scratch-test a sample from every new box.
- Drives: buy surveillance-rated drives for recorders; check the SMART power-on hours of any "new" drive.
- Memory and SSDs: check the exact type and keying.
- Supplier register: name, location, phone, what they sell, warranty terms, how they handled your last return. Use two suppliers for important items.
Lead technician bench
- Take three intermittent or repeat faults from your trainer's "hard case" box. Write a test plan for each, run it, and find the cause.
- Write a 5-whys root-cause report for one repeat fault on a real or role-play site.
- Review a month of training-workshop job cards with the quality checklist; list the gaps.
- Set up a returns log and a supplier register for your future business.
Field root cause
Find one computer, network or camera problem that keeps coming back somewhere you know (home, school, church). Ask "why?" five times and write what you would change.
Check yourself
- How long should you test after fixing an intermittent fault?
- What is the difference between fixing a symptom and fixing the root cause?
- Why does a camera that works by day but drops at night suggest a power problem?
Unit 2 · Networks for growing businesses: segments, security and links
As a business grows, one flat network becomes a risk: a visitor's phone, a camera and the accounts computer should not all sit in the same room.
Competency standard
| Learning outcome | Performance criteria — the trainee… |
|---|---|
| 2.1 Segment a network | separates office, guest and CCTV traffic using VLANs or separate networks |
| 2.2 Secure the edge | hardens the router or firewall and controls remote access |
| 2.3 Link buildings | plans a cable or point-to-point wireless link between buildings safely |
| 2.4 Monitor and document | sets up basic monitoring and keeps the network document current |
Range. A two-building practice site with office, guest and CCTV networks. Evidence. VLAN and IP plan; configuration screenshots; link plan with height-work method statement; updated network document.
Why separate the network
- Guests should reach the internet, not the office files or printers.
- Cameras should talk to the NVR, not to the internet directly and not to office computers. A camera with old firmware is then less of a door into the office.
- Office computers hold accounts and personal data that the Data Protection Act requires to be protected from unauthorised access.
VLANs in plain words
A VLAN (virtual LAN) lets one switch behave like several separate switches. The IEEE 802.1Q standard adds a small tag to each network frame saying which VLAN it belongs to, and allows up to 4,094 VLANs. A port that carries one VLAN to an ordinary device is often called an access port; a link that carries several tagged VLANs between switches, routers and access points is often called a trunk.
A simple plan:
| VLAN | Name | Addresses (private, /24) | Who |
|---|---|---|---|
| 10 | Office | 192.168.10.0 | Staff computers, printers |
| 20 | CCTV | 192.168.20.0 | Cameras, NVR |
| 30 | Guest | 192.168.30.0 | Visitors' Wi-Fi |
| 99 | Management | 192.168.99.0 | Switches, APs, router admin |
All four ranges are private addresses.
Set it up, step by step:
- Draw the plan above for the site, with which switch port goes to which device.
- On the router or firewall, create the VLANs, give each an address and a DHCP range (CCTV can be all fixed addresses).
- Add rules: Guest → internet only; CCTV → NVR only, no internet except for the NVR's update or app service if the owner needs phone viewing; Office → internet and printers; Management → only from the admin's computer.
- On the managed switch, set access ports for each device and a trunk port to the router and to each access point.
- On the access points, map the office Wi-Fi name to VLAN 10 and the guest Wi-Fi name to VLAN 30.
- Test from each VLAN: a guest phone cannot open the office printer page; an office computer cannot open a camera's page; the NVR still records all cameras.
- Update the network document (Level 2) with the VLAN plan and rules.
Secure the edge
The US cyber agency CISA advises changing default usernames and passwords, updating firmware, using the strongest encryption available (WPA3), disabling WPS and remote management, and keeping the firewall on. For a business, add:
- Separate admin accounts for each technician, never a shared password; remove access when someone leaves
- No open ports to cameras or NVRs from the internet; use the maker's app service or a properly set-up VPN that you maintain
- Firmware checked at every maintenance visit, recorded in the network document
- A copy of every device's configuration saved after each change
- A written list of who may change what
Cybersecurity law. The Cybersecurity Act, 2020 (Act 1038) set up the Cyber Security Authority to regulate cybersecurity activities in Ghana. Whether a small IT support or CCTV business needs any licence or accreditation from the Authority was not verified; check with the Authority before you advertise "cybersecurity services". Report cybercrime to 292.
Link two buildings
Option A: cable. Up to 90 m of fixed copper cable plus patch cords, 100 m in total. Outdoors, use cable rated for outdoor use, in conduit, buried or on a proper catenary wire. Never tie data cable to electricity poles or power lines.
Option B: point-to-point wireless. Two outdoor bridge units aimed at each other, for longer distances or across a road.
- Check there is a clear line of sight (no trees or buildings between).
- Plan the mounting points: walls or poles you are allowed to use, away from power lines.
- Use outdoor-rated units with a suitable IP rating, and power them with standard PoE.
- Write a method statement for the height work (below).
- Align the units using the signal meter in their app; lock the brackets.
- Secure the link with a strong password and encryption; put the units on the management VLAN.
- Test speed and stability for at least a day; record it.
Height work is planned, not improvised. Write a short method statement for every job above ladder height: who does what, which ladder or platform, where power lines are, weather limits, who holds the ladder, rescue plan, first aid. Use the ladder rules: inspect, 4-to-1 angle, at least 3 feet (about 1 m) above the landing, three points of contact, no metal ladders near power lines. If the job needs scaffolding, a lift or roof work beyond your team's skill, subcontract it.
Selling Wi-Fi. An "Internet Hotspot" is an NCA internet service classification; a hotspot provider uses unlicensed bands and may not cover more than three administrative districts. A hostel, café or estate that wants to sell Wi-Fi needs to sort out authorisation with the NCA first; you can design and install it, but do not run a paid service yourself without checking.
Monitor the network
- Set up free monitoring that pings the router, NVR and access points every few minutes and alerts you (by email or app) if one stops answering.
- At each maintenance visit, record: firmware versions, number of DHCP leases in use, Wi-Fi channel and signal at three points, recording days on the NVR.
- A rising number of faults on one switch port or camera is an early warning: find the root cause (Unit 1).
Address space (example figures)
A guest house has 18 rooms. Each guest brings about 2 devices; at full occupancy 18 rooms × 2 guests. Staff have 10 devices; there are 12 cameras and an NVR.
- How many guest devices at full occupancy?
- Will a guest DHCP range of .50 to .199 on a /24 be enough?
- How many fixed addresses do you need on the CCTV VLAN?
Segment and link
- Write a VLAN and IP plan for a two-building practice site (office, CCTV, guest, management).
- Configure the router, managed switch and two access points; prove the separation with the six tests.
- Plan and set up a point-to-point wireless link at low height in the training yard, with a written method statement.
- Set up ping monitoring for the router, NVR and APs; show an alert when you unplug one.
- Update the network document and hand it to your trainer as the "owner".
Read a configuration
Ask an IT person (or use your training router) to show you a configuration backup file. Find where the admin password, the Wi-Fi settings and the firewall rules are stored, and write why that file must be kept secret.
Check yourself
- Why put cameras on their own VLAN?
- Name three rules you would set between the guest, CCTV and office VLANs.
- What five things go in a method statement for height work?
Unit 3 · CCTV projects: survey, tender, install, commission and comply
Larger customers buy on paper first: a survey, a clear proposal, a fair price and proof you will keep their system legal and working.
Competency standard
| Learning outcome | Performance criteria — the trainee… |
|---|---|
| 3.1 Survey a site | completes a site survey with risks, camera positions, cable routes, power points and network plan |
| 3.2 Write a proposal or tender | prepares a bill of quantities, method statement, programme and price |
| 3.3 Run the installation | leads a team through the installation with daily safety and quality checks |
| 3.4 Commission and hand over | commissions, tests and hands over with documents and training |
| 3.5 Keep the customer compliant | advises on the privacy plan, signage, retention, access requests and data protection registration |
Range. One project of 12 or more cameras, real or simulated (school, hotel, warehouse or church). Evidence. Survey report; proposal with bill of quantities; daily site records; commissioning sheet; handover pack.
The site survey
- Customer's goals: what must be seen, and why (purpose); who will watch; how many days of recording
- Site sketch with doors, gates, fences, counters, stores, car park, lighting at night
- Camera list: type, position, height, field of view, IP rating for outdoor positions
- Private areas to avoid or mask: toilets, changing rooms, sleeping rooms, neighbours' property
- Cable routes and lengths (keep fixed runs under 90 m); outdoor and underground sections
- Power: where the existing sockets are; anything new is CEWP work
- Network: existing network, VLAN plan (Unit 2), internet for phone viewing
- Hazards: height, roofs, power lines, traffic, dogs, working hours; how the site is accessed
- Photos of each position (with the owner's permission)
The proposal or tender
A good proposal answers the customer's questions before they ask.
- Summary: what the system will do, in one paragraph.
- Design: site plan, camera list, recorder(s), storage for the agreed days with your calculation, PoE budget, network plan.
- Bill of quantities (BOQ): every item with quantity, unit price and total.
- Labour and programme: days, team size, dates.
- Method statement: how you will work safely and with least disruption.
- Exclusions: mains wiring by the customer's CEWP electrician; civil works; anything you will not do.
- Compliance support: privacy plan, signs, retention set-up, handover training.
- Warranty and maintenance offer.
- Price, validity, payment terms (deposit, stage payment, final payment after commissioning).
- Company documents the customer may ask for (Unit 5): registration, tax identification, VAT certificate if registered, SSNIT clearance if you employ staff.
Bill of quantities (example figures)
A school wants 12 IP cameras and 30 days' recording. Items: 12 cameras at GH¢650; one 16-channel PoE NVR at GH¢3,200; one 8 TB surveillance drive at GH¢4,500; 2 boxes of copper Cat6 at GH¢1,600; 30 RJ45 plugs and boots GH¢150; trunking and clips GH¢900; 6 outdoor junction boxes at GH¢80; UPS GH¢1,800. Labour: 3 people × 4 days at GH¢250 per person-day. Transport GH¢400. Your margin on materials is 15%.
- Total materials at cost?
- Materials price with 15% margin?
- Labour and transport?
- Total price before VAT; and with VAT at 20% if you are VAT-registered?
Run the installation
Every morning (toolbox talk, 10 minutes): today's tasks and who does them; the height work and who holds the ladder; weather; where the power lines are; first aid kit and who is trained; keep customers' areas tidy.
Every evening: what was finished; cables tested and labelled; any damage or near miss recorded; materials used; tomorrow's plan; photos of progress (no people's faces, no screens).
Rules for the team: nobody works on a ladder alone; nobody opens a power supply or touches mains wiring; nobody views or copies footage beyond what testing needs; nobody shares photos of the customer's site on social media.
Commissioning
- Every camera: picture by day and by night, focus, angle agreed with the owner, masking applied where needed
- Every cable: tester result recorded with its label
- NVR: time correct, H.265 where supported, overwrite on, recording schedule as agreed
- After 24 to 48 hours of real recording: measure the actual days of storage; adjust bit rate or schedule if it is short of the agreed number
- PoE: total load under the budget with spare
- Users: owner admin plus named view-only users; default passwords gone; firmware current
- UPS: runtime tested
- Phone viewing without open router ports
- Export test: the owner exports a clip themselves
Keep the customer compliant
Ghana's Data Protection Act, 2012 (Act 843) gives people the right to see data held about them and requires data to be protected from loss, damage and unauthorised access. The Data Protection Commission says all data controllers and processors must register with it. A school's published CCTV notice under Act 843 shows a practical model: purpose (safety and security), what is captured (images, location, time), 60 days' retention stored locally, notices on site, no cameras in washrooms or hostels, and viewing only by named officers with passwords. The UK regulator's guidance (a foreign example) adds that surveillance should be lawful, necessary and proportionate.
Your compliance support package (offer it in every proposal):
- Draft the owner's CCTV privacy plan (Level 2) and a public notice for their notice board or website.
- Supply signs for each entrance.
- Set retention in the NVR to match the plan.
- Create named user accounts; give the owner a user list to keep up to date.
- Provide a footage request log: date, who asked (person or police), what period, who copied it, how it was handed over, signature.
- Remind the owner in writing to check their registration with the Data Protection Commission.
- Review the plan and signs at every maintenance visit.
Know your limits. You are not the owner's lawyer. Give the plan as a template and tell the owner to take advice for anything unusual (audio recording, cameras watching staff, sharing footage with third parties). Whether the Data Protection Commission has published CCTV-specific rules was not verified.
Do security businesses need a licence? Private security organisations in Ghana are licensed by the Ministry of the Interior; one report gave a licence cost of GH¢5,000 with GH¢2,000 annual renewal and said the sector relies on an old footnote in the Police Service Act, 1970 (Act 350). The report's date was not shown. Whether a business that only installs and maintains CCTV (no guards, no monitoring of customers' cameras) needs that licence was not verified. Ask the Ministry of the Interior before you offer monitoring or guarding, and keep your services to installation and maintenance until you have a clear answer.
Maintenance agreements for projects
Offer a service-level agreement (SLA) with: visits per year; response time for faults (for example next working day for a whole system down, 3 working days for one camera); what each visit checks (cleaning lenses, recording days, firmware, user list, signs, UPS test); parts excluded or included; price per year.
A full project
- Survey a real building of 12+ cameras (with permission) or the trainer's simulated site; write the survey report.
- Prepare a proposal with design, BOQ, method statement, programme, exclusions, compliance package and price.
- Lead a team of 3 trainees to install at least 4 cameras of the design on the training site, with toolbox talks and daily records.
- Commission with the checklist, measure recording days after 24 hours, and hand over with training and the compliance package.
- Write a draft SLA for the project.
Read a tender
Find a published tender or request for quotation for CCTV, networking or IT supply (newspaper, notice board or an organisation's website). List what documents the buyer asks for and how they will choose the winner.
Check yourself
- Name six things a site survey records.
- Why measure recording days again after 24–48 hours?
- What goes in a footage request log?
Unit 4 · Lead the team: technicians, apprentices and safety
Your name is on every job your team does. Train them well, check their work, keep them safe and treat them fairly.
Competency standard
| Learning outcome | Performance criteria — the trainee… |
|---|---|
| 4.1 Allocate and check work | plans the week's jobs by skill and checks finished work against the quality checklist |
| 4.2 Train and sign off | uses a skills matrix and signs off tasks only after observed competent work |
| 4.3 Keep the team safe | runs toolbox talks, records incidents and near misses, and enforces the safety gates |
| 4.4 Protect customer data | uses confidentiality agreements and access rules with staff |
| 4.5 Employ fairly | explains basic Labour Act duties, contracts, leave and pay |
Range. A team of three to five (trainees in role), over two weeks of training-workshop work. Evidence. Weekly job plan; skills matrix; toolbox-talk records; incident log; signed confidentiality agreements (practice); a written statement of terms (practice).
The skills matrix
List the tasks down the side and the people across the top. Mark each box: L = learning, S = can do with supervision, C = competent alone, T = can train others.
| Task | Ama | Kofi | Yaw | You |
|---|---|---|---|---|
| Memory and SSD upgrade | C | S | L | T |
| Windows clean install and backup | C | C | S | T |
| Crimp and test cable | C | C | C | T |
| Patch panel termination | S | C | L | T |
| Ladder work and camera mounting | S | C | L | T |
| NVR configuration and privacy set-up | L | S | L | T |
(Names are examples.) Give jobs according to the matrix; pair a learner with someone marked C or T. Sign a box up to C only after you have watched the person do the task correctly at least twice.
Apprentices
Ghana's 2026 budget allocated GH¢170 million for the National Apprenticeship Programme; ask your Assembly or the GEA how small workshops can take part. For your own apprentices:
- A written agreement: length of training, what they will learn, allowance, hours, who pays for tools
- A copy of the skills matrix; review it monthly with them
- Safety first: no ladder work until they have passed the ladder rules on the ground; never alone on a ladder; never inside a PSU or near mains
- Increasing responsibility: from carrying and labelling, to crimping and testing, to configuring with supervision
Safety leadership
- Toolbox talk before every site day (Unit 3).
- Incident and near-miss log: what happened, who was involved, what was done, what will change. A near miss (a ladder slipped but nobody fell) is a free lesson: record it.
- Enforce the gates: stop the work if someone tries to do mains wiring, climb alone or open a power supply. The customer's request does not change the rule.
- Equipment: inspect ladders before use and tag damaged ones out of service; keep the first aid kit stocked; check the fire extinguisher's date.
- E-waste: old drives, boards and batteries go into a labelled box for a proper collector; Ghana's Environmental Protection Act, 2025 (Act 1124) now covers e-waste, and the EPA's e-waste project runs a GH-Waste collection app.
Customer data and your staff
Under the Data Protection Act, data must be protected from unauthorised access. A study found repair technicians looked at customers' personal data in about half of repairs. Make it impossible in your shop:
- Every staff member and apprentice signs a confidentiality agreement before their first job
- Rules: open only what the job needs; never copy, photograph or share customers' files or footage; no customer data on personal phones
- Customer passwords and recovery keys stay with the customer
- Bench data deleted after handover; a log of deletions
- Breaking the rules is a disciplinary matter
Employing fairly: Labour Act basics
From the Labour Act, 2003 (Act 651):
- A worker employed for six months or more must have a written contract (s.12), and you must give a written statement of the main terms within two months of starting (s.13).
- Workers get at least 15 working days of paid leave a year (s.20).
- A woman worker is entitled to at least 12 weeks of maternity leave (s.57).
- Casual workers must be paid the full minimum wage for each day worked (s.74).
- Notice periods for ending employment are set by the Act (s.17).
The national daily minimum wage for 2026 is GH¢21.77, about GH¢587.79 a month at 27 days. Register workers with SSNIT when you hire them. Unit 6 shows the pay sums.
Lead for two weeks
- Draw a skills matrix for your team of trainees.
- Plan the week's jobs by skill; check every finished job against the quality checklist.
- Run five toolbox talks and keep the records; log any near miss.
- Have each team member sign a practice confidentiality agreement.
- Write a practice written statement of terms for a new technician, using the Labour Act points.
- Sign off one task for one team member after watching them do it twice.
Talk to an employer
Ask a workshop owner (any trade) how they train apprentices, how they decide when someone is ready to work alone, and what went wrong when they hired someone. Write three lessons.
Check yourself
- When do you mark a person "competent" on the skills matrix?
- Why record near misses?
- What must a worker employed for six months or more receive under the Labour Act?
Unit 5 · Establish your IT support and CCTV business
Customers who pay well (schools, hotels, companies, NGOs) ask for papers: registration, tax number, VAT certificate, a proper invoice. Get them right from the start.
Competency standard
| Learning outcome | Performance criteria — the trainee… |
|---|---|
| 5.1 Choose a legal form | compares sole proprietor, partnership, company and cooperative for this business |
| 5.2 Register step by step | lists the bodies, steps and current fees: ORC, GRA (TIN, VAT), Assembly, DPC, GNFS, and any others that apply |
| 5.3 Plan premises and start-up money | writes a start-up budget and chooses financing |
| 5.4 Plan staff and insurance | plans hiring, SSNIT, PAYE and insurance |
| 5.5 Write the plan | writes a one-page business plan and a two-minute pitch |
Range. The trainee's own planned business. Evidence. Legal-form comparison; registration checklist with fees; start-up budget; one-page plan.
Choose a legal form
| Form | Fee at ORC (2026) | Good for | Watch out |
|---|---|---|---|
| Sole proprietor (business name) | GH¢130; renewal GH¢70 a year | Starting alone | You are personally liable for all debts |
| Partnership | GH¢270; renewal GH¢100 a year; 2–20 partners | Two technicians starting together | Written, stamped partnership agreement needed |
| Company limited by shares | GH¢585 plus capital duty as stated by ORC | Bigger contracts, tenders, investors | At least 2 directors and a secretary; annual returns |
| Company limited by guarantee | GH¢490 | Not-for-profit training or community ICT work | No profit to members |
| Cooperative | Not registered at ORC | A group of technicians sharing tools and contracts | The Department of Co-operatives route was not verified |
Companies file annual returns at GH¢175 a year, with late penalties of GH¢1,000 (1–4 years late) or GH¢2,000 (5 years or more). All ORC fees are from its 2026 fee page.
Registration, step by step
- Name and form. Check the name is free and register at the ORC (online or at the regional office).
- Tax identity. Your Ghana Card PIN is your individual Taxpayer Identification Number; companies receive a GRA TIN after ORC registration.
- VAT: decide early. Under the Value Added Tax Act, 2025 (Act 1151), the effective VAT rate is 20% (15% VAT + 2.5% NHIL + 2.5% GETFund) and the registration threshold for goods is GH¢750,000. For taxable services there is no turnover threshold: a person making taxable supplies of services must register within 30 days of starting. IT support, installation and maintenance are services, so expect to register for VAT from the start; ask GRA in writing to confirm for your exact services. A VAT-registered business cannot use the Modified Taxation Scheme.
- Income tax. If you are a sole proprietor and not VAT-registered, the Modified Taxation Scheme may apply: turnover GH¢20,001–750,000 pays 3% of turnover (the ceiling was raised from GH¢500,000 by the Income Tax (Amendment) Act 2026, Act 1178). Companies pay corporate income tax, 25% standard rate, with quarterly provisional tax.
- Withholding tax. Companies and institutions that pay you may withhold 7.5% on services from an individual or entity paid over GH¢2,000 a year, and 3% on goods; ask for the withholding tax certificate. It counts towards your income tax, so keep every certificate.
- Assembly business operating permit. In Sekondi-Takoradi, apply through the STMA portal; fees are set in the Assembly's fee-fixing resolution. Confirm your category and the 2026 fee; annual permits are due by 31 March.
- Data Protection Commission. Your business keeps customers' names, numbers, job cards and sometimes their data, so it is a data controller; the Commission says all data controllers and processors must register. L.I. 2512 (2025) lists GH¢156 for a small data controller (turnover of GH¢90,000 or below), GH¢1,170 for medium and GH¢2,340 for large. Confirm your tier with the Commission.
- Fire certificate. Premises need a fire permit and certificate through the GNFS AFCAS platform. Published fees seen were GH¢250 residential, GH¢500 non-residential and GH¢1,000 commercial, plus processing fees. Check today's fee, and ask the landlord whether the building already has one.
- Only if they apply: NCA authorisation if you sell internet access; a Ministry of the Interior licence if you offer guarding or security monitoring (Unit 3; not verified for installers); e-waste rules under Act 1124 for your workshop's waste.
- SSNIT registration as an employer when you hire.
Electrical work stays out of your registration. You do not need, and cannot use, a wiring certificate unless you are an Energy Commission certified electrician. Write "electrical works by the client's certified electrician" in every proposal, or subcontract a CEWP electrician and show their certificate.
Premises and location settings that give good returns
- A small workshop with a bench, secure storage for customers' machines and stock, and a reception table; a shared office is fine at first
- Visible from a main road, near offices, schools, banks and hotels; parking for a motorbike or tricycle
- Steady power with a UPS; good mobile signal and internet for downloads and remote support
- In the Western Region: Takoradi and Sekondi for offices, schools and oil and gas service companies; coastal towns such as Akwidaa and Busua for guest houses and resorts needing Wi-Fi and cameras
Start-up budget (example)
| Item | GH¢ (example) |
|---|---|
| Second-hand motorbike | 8,000 |
| Tools and test equipment (PSU tester, multimeter, crimpers, cable tester, punch-down tool, ladders) | 5,000 |
| Starting stock (cable, plugs, drives, memory, one demo camera kit) | 4,500 |
| ORC business name | 130 |
| DPC registration (medium tier, to confirm) | 1,170 |
| Fire certificate (commercial fee seen, to confirm) | 1,000 |
| Assembly permit (example; confirm) | 300 |
| Signboard, business cards, printed capability sheets | 900 |
| Insurance (example; get quotes) | 500 |
| Bench, cupboard, chairs | 500 |
| Total | 22,000 |
(ORC, DPC and fire figures from their sources above: ORC Business Names; DPC Fees L.I. 2512; AFCAS Charges.)
Financing
- Savings and susu or VSLA for the first tools.
- Microfinance or bank loan: bring your one-page plan and 12-month cash-flow forecast (Unit 7). The Bank of Ghana policy rate was 14.00% when last checked; lenders charge more than that.
- Ghana Enterprises Agency: programmes such as SME GO, Business-in-a-Box and Kaizen, and Business Advisory Centres in Takoradi, Shama, Effia-Kwesimintsim, Mpohor and Ahanta West.
- 2026 Budget programmes: GH¢401 million for the Women's Development Bank, GH¢160 million for Adwumawura and GH¢170 million for the National Apprenticeship Programme. Ask how to apply.
- Disability fund: the Assemblies' share of the Common Fund for persons with disabilities rose from 3% to 5% from 2026.
- Supplier credit: once you have a record, ask suppliers for 30 days' credit on stock.
Insurance
Buy only from insurers licensed by the National Insurance Commission; check at the NIC website. Ask about: cover for tools and stock (theft, fire), the motorbike, public liability (damage to a customer's property while installing), and personal accident cover for staff working at height. Which covers are compulsory for this business was not verified.
Staff
Employer and employee pay SSNIT together: employee 5.5% and employer 13% of basic salary (18.5%); the employer pays within 14 days after the month ends. PAYE is deducted after SSNIT, using the 2026 monthly bands where the first GH¢588 is tax-free, and is due by the 15th of the next month. Unit 6 has a worked payslip.
Market yourself
- Capability sheet (Level 2) with your registration number, TIN, VAT number and references.
- Google Business Profile, verified, so customers find you on Maps.
- WhatsApp Business catalogue with packages; quick replies with prices.
- Organisation visits: schools, churches, hotels, NGOs and companies; offer a free health check.
- Partners: a CEWP electrician, a solar installer, a printer-supplies dealer and a building contractor who will recommend you.
- Portfolio: photos of neat cabinets and camera mounts, with permission; never screens or footage.
Accessibility
Ghana's Persons with Disability Act, 2006 (Act 715) requires anyone who provides a service to the public to provide facilities that make it accessible to persons with disability. As an owner:
- Make your reception reachable without steps, with a bench at seated height.
- Hire on skills: diagnosis, laptop and printer repair, Windows and backup work, configuration of routers, switches and NVRs, documentation and phone support are all workable for staff with many kinds of disability, with screen readers, magnifiers, written job cards and knee-space benches. Ladder and ceiling work goes to team members who can climb safely.
- Offer customers the choice of WhatsApp text, voice notes or phone calls.
- Ask the Assembly's disability desk about support for equipment.
Which tier and which tax? (example figures)
Your forecast sales for the first year are GH¢142,000 (Unit 7), all from IT and CCTV services and equipment you supply with them.
- Which DPC fee tier does the GH¢90,000 line suggest, and what fee?
- Must you register for VAT, and by when?
- Can you use the Modified Taxation Scheme?
- What is the total of the ORC, DPC and fire certificate items in the start-up budget?
Set it up on paper
- Compare the legal forms for your business; choose one and say why.
- Fill in a registration checklist with each body, step, fee and source; mark what you must still confirm.
- Write a start-up budget from real quotes (at least two quotes for the biggest items).
- Write a one-page business plan: services, customers, location, prices, team, money needed, how you will repay.
- Practise a two-minute pitch to your group.
Ask the officials
Visit or call the GRA office, the Assembly's revenue office or the GEA Business Advisory Centre. Ask: "Must an IT support and CCTV installation business register for VAT from the start?" and "Which permit category applies?" Write the answers with the date and the officer's position.
Check yourself
- What does ORC charge to register a business name, and to renew it?
- Why must most IT and CCTV businesses think about VAT from day one?
- Name four bodies you may need to register with.
Unit 6 · Bookkeeping and accounting for an IT and CCTV business
Installers often run out of cash while they are busy: they buy kits for a big job, wait weeks for the school to pay, and pay staff in between. Good books show it coming.
Competency standard
| Learning outcome | Performance criteria — the trainee… |
|---|---|
| 6.1 Keep daily records | keeps a cash book, numbered invoices and receipts, a stock record and a debtors and creditors list |
| 6.2 Cost and price jobs | costs a job, sets a price, and explains margin and mark-up and break-even |
| 6.3 Handle VAT, WHT and payroll | works out VAT on invoices, records withholding tax certificates and calculates a payslip |
| 6.4 Close the month | produces a profit and loss statement and a balance sheet that balances, and reconciles bank and MoMo |
Range. One month of the example business's records; the trainee's own price list. Evidence. Completed cash book page; job costing; payslip; month-end statements; reconciliation.
General bookkeeping is taught in the Hub's Money Skills Level 2; here it is applied to an IT and CCTV business.
The records you keep
| Record | What goes in it |
|---|---|
| Cash book (bank, MoMo and cash columns) | Every amount in and out, every day, with the invoice or receipt number |
| Invoices (numbered) | Customer, job, items, VAT, total, due date; a VAT-registered business issues VAT invoices (GRA's e-VAT invoices carry a QR code) |
| Receipts and supplier invoices | Every purchase; keep the VAT invoices to claim input VAT |
| Job costing sheet | Parts, labour hours, transport for each job; compare quote with actual |
| Stock record | Cable (metres), plugs, drives, memory, cameras: in, out, balance, with serial numbers for drives and cameras |
| Debtors list | Who owes you, how much, since when |
| Creditors list | Whom you owe, how much, when due |
| Fixed asset register | Tools, test kit, motorbike: cost, date, depreciation |
| Payroll record | Gross pay, SSNIT, PAYE, net pay, dates paid |
| WHT certificates | Every certificate from customers who withheld tax |
Keep records in Ghana for at least six years from the end of the year they relate to. Free tools such as Wave or the Zoho Books free plan, or a spreadsheet, can hold these records.
Double entry in one paragraph
Every transaction affects two accounts. Assets = Liabilities + Equity. A debit increases assets and expenses; a credit increases liabilities, capital and income. A trial balance checks that debits equal credits, but it does not catch every mistake.
Margin, mark-up and break-even
- Mark-up is profit as a share of cost; margin is profit as a share of price. A memory stick bought at GH¢450 and sold at GH¢600 has a mark-up of 150 ÷ 450 = 33.3% and a margin of 150 ÷ 600 = 25% (example).
- Break-even sales = fixed costs ÷ gross margin ratio.
Depreciation
Straight-line depreciation = (cost − salvage value) ÷ useful life.
- Tools and test equipment: cost GH¢12,000, no salvage, 4 years → GH¢3,000 a year = GH¢250 a month (example).
- Motorbike: cost GH¢18,000, salvage GH¢3,000, 5 years → GH¢3,000 a year = GH¢250 a month (example).
VAT on your invoices
With an effective rate of 20%: a job priced at GH¢5,000 before VAT carries VAT of GH¢1,000; the customer pays GH¢6,000. You pay GRA the VAT you charged (output VAT) minus the VAT on your business purchases (input VAT), by the last working day of the next month. Keep every supplier's VAT invoice.
Withholding tax
When a company or institution withholds tax from your payment, you receive less cash but a credit against your income tax. Example: on a GH¢5,000 service invoice, 7.5% withheld = GH¢375; record cash received, the GH¢375 as "WHT receivable", and file the certificate. Ask GRA and the payer whether WHT is worked out on the amount before or after VAT; the basis was not verified here.
A worked month: "Coastline TechCare" (all figures are examples)
Opening position, 1 October (a sole proprietor, VAT-registered, one technician):
| Assets | GH¢ | Liabilities and equity | GH¢ |
|---|---|---|---|
| Tools and test equipment (cost) | 12,000 | Loan | 10,000 |
| Motorbike (cost) | 18,000 | Owner's capital | 35,000 |
| Stock of parts and cable | 6,000 | ||
| Cash and bank | 9,000 | ||
| Total | 45,000 | Total | 45,000 |
October transactions:
- Sales (before VAT): CCTV installations GH¢15,000; repairs and upgrades GH¢6,000; maintenance contracts GH¢3,000. Total GH¢24,000; output VAT 20% = GH¢4,800; total invoiced GH¢28,800.
- One school invoice of GH¢6,000 + VAT GH¢1,200 = GH¢7,200 is unpaid at month end (a debtor). Everything else was received in cash, bank or MoMo: 28,800 − 7,200 = GH¢21,600.
- Parts and kits bought: GH¢11,000 + input VAT GH¢2,200. Paid GH¢8,000 + VAT 1,600 = GH¢9,600; owed to a supplier GH¢3,000 + VAT 600 = GH¢3,600 (a creditor).
- Parts used on jobs (cost of sales) GH¢10,000. Closing stock = 6,000 + 11,000 − 10,000 = GH¢7,000.
- Technician's gross pay GH¢1,800 (payslip below). Employer SSNIT 13% = GH¢234.
- Rent GH¢800; fuel and transport GH¢900; data and phone GH¢300 (no VAT, for simplicity).
- Loan repayment GH¢1,000, of which interest GH¢150 and capital GH¢850.
- Owner's drawings GH¢2,000.
- Depreciation GH¢500 (tools 250 + motorbike 250).
Payslip (October):
| Line | GH¢ |
|---|---|
| Gross pay | 1,800.00 |
| Employee SSNIT 5.5% | 99.00 |
| Taxable pay (1,800 − 99) | 1,701.00 |
| PAYE: 588 at 0% = 0; 80 at 5% = 4.00; 100 at 10% = 10.00; 933 at 17.5% = 163.275; total rounded | 177.28 |
| Net pay | 1,523.72 |
| Employer SSNIT 13% (paid on top) | 234.00 |
(PAYE bands from GRA PAYE; SSNIT rates from SSNIT FAQ.) SSNIT of 99 + 234 = GH¢333 is due to SSNIT by the 14th of November, and PAYE GH¢177.28 by the 15th.
Profit and loss statement, October:
| GH¢ | |
|---|---|
| Sales (before VAT) | 24,000.00 |
| Less cost of sales (parts used) | 10,000.00 |
| Gross profit | 14,000.00 |
| Wages 1,800 + employer SSNIT 234 | 2,034.00 |
| Rent | 800.00 |
| Fuel and transport | 900.00 |
| Data and phone | 300.00 |
| Loan interest | 150.00 |
| Depreciation | 500.00 |
| Total expenses | 4,684.00 |
| Net profit | 9,316.00 |
VAT is not income: it belongs to GRA. Drawings and the loan capital repaid are not expenses.
Cash summary, October:
| GH¢ | |
|---|---|
| Opening cash and bank | 9,000.00 |
| Add receipts from customers | 21,600.00 |
| Less parts paid (with VAT) | 9,600.00 |
| Less net wages | 1,523.72 |
| Less rent, fuel, data (800 + 900 + 300) | 2,000.00 |
| Less loan repayment | 1,000.00 |
| Less drawings | 2,000.00 |
| Closing cash and bank | 14,476.28 |
Balance sheet, 31 October:
| Assets | GH¢ |
|---|---|
| Tools (12,000 − 250) | 11,750.00 |
| Motorbike (18,000 − 250) | 17,750.00 |
| Stock | 7,000.00 |
| Debtors | 7,200.00 |
| Cash and bank | 14,476.28 |
| Total assets | 58,176.28 |
| Liabilities and equity | GH¢ |
|---|---|
| Creditors (supplier) | 3,600.00 |
| VAT payable (4,800 − 2,200) | 2,600.00 |
| PAYE payable | 177.28 |
| SSNIT payable (99 + 234) | 333.00 |
| Loan (10,000 − 850) | 9,150.00 |
| Total liabilities | 15,860.28 |
| Owner's capital 35,000 + profit 9,316 − drawings 2,000 | 42,316.00 |
| Total liabilities and equity | 58,176.28 |
It balances: assets GH¢58,176.28 = liabilities GH¢15,860.28 + equity GH¢42,316.00.
What the books tell the owner: a good profit month, but GH¢7,200 is tied up in one school's unpaid invoice, and GH¢6,710.28 (creditor 3,600 + VAT 2,600 + PAYE 177.28 + SSNIT 333) must be paid out in the next few weeks. The real "free" cash is much less than the bank balance.
Break-even for this business: fixed costs (total expenses) GH¢4,684 ÷ gross margin ratio (14,000 ÷ 24,000 = 58.3%) = about GH¢8,030 of sales a month.
Month-end routine
- Add up the cash book columns; check against the bank statement and the MoMo statement (reconciliation): list any differences (bank charges, a deposit not yet recorded) and correct the book.
- Count stock (cable metres, plugs, drives, cameras) and compare with the stock record.
- Update the debtors list; send reminders for anything over 30 days.
- Update the creditors list; plan payments.
- Work out VAT for the month: output minus input; file and pay by the last working day of next month.
- Run payroll; pay SSNIT by the 14th and PAYE by the 15th.
- Post depreciation from the fixed asset register.
- Produce the profit and loss statement and balance sheet; check that it balances.
- Compare actual with the cash-flow forecast; write three lines on what changed.
- File everything for six years.
From 1 January 2027 the IFRS for SMEs 2025 edition applies to companies that use it; a sole proprietor's simple books are fine, but keep them clean so an accountant can convert them when you grow.
Your turn: November (all figures are examples)
Start from the 31 October balance sheet. In November: sales before VAT GH¢20,000 (VAT 20%); the school pays the GH¢7,200 it owed; GH¢4,800 (including VAT) of November's sales is still unpaid at month end; parts bought GH¢8,000 + VAT 1,600, all paid in cash; parts used GH¢9,000; you pay October's VAT, PAYE, SSNIT and the supplier; wages and SSNIT as in October (net pay 1,523.72, and November's PAYE and SSNIT stay owing); rent, fuel and data GH¢2,000; loan repayment GH¢1,000 (interest 140, capital 860); drawings GH¢2,000; depreciation GH¢500.
- Gross profit and net profit for November.
- Closing stock.
- Closing cash.
- Show that the balance sheet at 30 November balances.
Quick sums (example figures)
- An SSD costs you GH¢420 and you sell it for GH¢560. What are the mark-up and the margin?
- A hotel pays a GH¢8,000 service invoice (before VAT) and withholds 7.5% on that amount. How much tax is withheld, and what do you record?
- With fixed costs of GH¢4,684 a month and a 50% gross margin ratio, what are break-even sales?
Close a month
- Enter the October example into a cash book and ledger (paper or spreadsheet).
- Prepare the payslip, the VAT working and the month-end statements yourself and check them against the book.
- Reconcile a practice bank statement and MoMo statement with the cash book.
- Set up your own business's record templates: invoice, job costing sheet, stock record, debtors and creditors lists, fixed asset register.
Price list check
Take your Level 2 price list. For each service, write the cost, the price, the margin and the mark-up. Change any price that is below cost or below your break-even plan.
Check yourself
- Why is VAT not part of your income?
- What is the difference between margin and mark-up?
- Name four steps of the month-end routine.
Unit 7 · Grow, sustain and pitch: the capstone
Growth is not more jobs at any price. It is better customers, steady contracts, a team you trust and cash you can see coming.
Competency standard
| Learning outcome | Performance criteria — the trainee… |
|---|---|
| 7.1 Grow with quality | plans quality systems, service-level agreements and customer care for growth |
| 7.2 Win and keep contracts | prepares for tenders and partnerships, with the records lenders and buyers ask for |
| 7.3 Act ethically and plan succession | writes an ethics code and a plan for the business to run without the owner |
| 7.4 Pitch the plan | presents a one-page plan and a 12-month cash-flow forecast to a panel |
Range. The trainee's own business. Evidence. Growth plan; ethics code; 12-month forecast; capstone presentation scored by the panel.
Ways to grow
| Route | What it needs |
|---|---|
| Maintenance contracts (schools, churches, offices, hotels) | SLA template (Unit 3), visit checklists, reliable staff |
| Projects (CCTV, networks for new buildings) | Proposals, BOQs, cash for materials (ask for deposits), partners (CEWP electrician, contractor) |
| Coastal hospitality | Guest Wi-Fi with VLANs (Unit 2), cameras with privacy plans, NCA check if Wi-Fi is sold |
| Refurbished computers | Testing, data wiping, honest grading, written warranty |
| Training | Short courses for office staff (partner with Basic ICT Skills trainers) |
Customer care and quality
- Answer every enquiry the same day; give a time and keep it.
- Written quotes and job cards for everything; the quality checklist on every job (Unit 1).
- After each job, a short WhatsApp follow-up: "Is everything working?"
- A complaints book: record, reply within two days, fix the cause.
- A yearly review with every contract customer: what went well, what to change, their plans.
Tenders and partnerships
- Keep a tender file ready: registration documents, TIN, VAT certificate, SSNIT clearance (if employing), DPC registration, references, CVs of key staff, photos of past work, insurance certificates.
- Read every tender's requirements twice; answer every point in the same order.
- Price carefully: BOQ, labour, transport, margin, VAT (Unit 3).
- Partnerships: a written agreement with each partner (who does what, who invoices whom, how you split the risk).
Records for loans
Lenders want: six to twelve months of cash book and bank/MoMo statements, monthly profit and loss statements, the latest balance sheet, debtors and creditors lists, tax filings, the forecast and the plan. Unit 6's month-end routine produces all of these.
Ethics code (write your own)
- We never look at, copy or share customers' data or footage beyond what the job needs
- We never install hidden cameras, cameras into private areas or neighbours' property, or audio without the owner's advice
- We never do mains wiring; we use certified electricians
- We use genuine software and copper cable; we tell customers the truth about used parts
- We keep customers' passwords and recovery keys with the customer
- We pay our staff and our taxes on time
Succession: can the business run without you?
- Network documents, handover packs and SLAs stored where a trusted second person can find them.
- At least one other person trained to "T" on the key tasks (Unit 4).
- Bank and MoMo accounts with a second signatory or clear instructions.
- Customers' credentials not held by the business, so nothing is lost if staff change.
The 12-month cash-flow forecast (example)
Assumptions (all example): start-up money GH¢30,000 (savings 15,000 + loan 15,000); start-up spending GH¢22,000 (Unit 5 budget), so opening cash in January is GH¢8,000. Parts and kits cost 40% of receipts. Fixed costs GH¢1,800 a month while the owner works alone (rent 800, fuel 700, data 300); from April a technician is hired, so fixed costs become GH¢4,034 (rent 800, fuel 900, data 300, wages 1,800 and employer SSNIT 234). Loan repayment GH¢1,000 a month; drawings GH¢1,500 a month. Figures exclude VAT: VAT collected is paid over to GRA and is left out to keep the table simple.
| Month | Opening cash | Receipts | Parts (40%) | Fixed costs | Loan | Drawings | Net cash flow | Closing cash |
|---|---|---|---|---|---|---|---|---|
| Jan | 8,000 | 7,000 | 2,800 | 1,800 | 1,000 | 1,500 | -100 | 7,900 |
| Feb | 7,900 | 8,000 | 3,200 | 1,800 | 1,000 | 1,500 | 500 | 8,400 |
| Mar | 8,400 | 9,000 | 3,600 | 1,800 | 1,000 | 1,500 | 1,100 | 9,500 |
| Apr | 9,500 | 11,000 | 4,400 | 4,034 | 1,000 | 1,500 | 66 | 9,566 |
| May | 9,566 | 12,000 | 4,800 | 4,034 | 1,000 | 1,500 | 666 | 10,232 |
| Jun | 10,232 | 11,000 | 4,400 | 4,034 | 1,000 | 1,500 | 66 | 10,298 |
| Jul | 10,298 | 10,000 | 4,000 | 4,034 | 1,000 | 1,500 | -534 | 9,764 |
| Aug | 9,764 | 13,000 | 5,200 | 4,034 | 1,000 | 1,500 | 1,266 | 11,030 |
| Sep | 11,030 | 15,000 | 6,000 | 4,034 | 1,000 | 1,500 | 2,466 | 13,496 |
| Oct | 13,496 | 14,000 | 5,600 | 4,034 | 1,000 | 1,500 | 1,866 | 15,362 |
| Nov | 15,362 | 15,000 | 6,000 | 4,034 | 1,000 | 1,500 | 2,466 | 17,828 |
| Dec | 17,828 | 17,000 | 6,800 | 4,034 | 1,000 | 1,500 | 3,666 | 21,494 |
| Year | 142,000 | 56,800 | 41,706 | 12,000 | 18,000 | 13,494 |
Reading it: cash never goes below GH¢7,900, but April to July are thin after the technician is hired: do not buy big equipment then. September (school term) and December are strong. GH¢3,000 of the GH¢15,000 loan is still owed after 12 months. Year sales of GH¢142,000 are above GH¢90,000, so plan for the DPC medium tier, and VAT is collected and paid every month. Income tax is not in the table; ask GRA or an accountant how much to set aside.
Stress test (example figures)
Using the forecast:
- If a school delays paying GH¢5,000 of September's receipts until November, what is the closing cash at the end of September and of October?
- If receipts are 10% lower every month all year (parts stay 40% of receipts), what is the new net cash flow for the year?
- What one action would you take to protect cash in the thin months?
The capstone: pitch to a panel
Prepare and present (about 10 minutes, then questions):
- One-page business plan: name and legal form; services and packages; target customers; location; team and skills matrix; registration and compliance status (ORC, GRA/VAT, Assembly, DPC, GNFS, others); safety and privacy commitments; marketing; money needed and how you will repay.
- 12-month cash-flow forecast with your assumptions written out.
- One month of example books (P&L and a balance sheet that balances).
- One project proposal (from Unit 3) as proof of your work.
- Your ethics code.
The panel scores: clarity; realistic prices and costs; legal and safety compliance; privacy; money sense; answers to questions.
Capstone
- Write your one-page plan and 12-month forecast in a spreadsheet; check every sum.
- Write your ethics code and a one-page growth plan for year two.
- Rehearse your pitch twice with a partner.
- Present to the panel; write down every question and your improvement plan.
Mentor
Find one experienced business owner (any trade) willing to look at your plan. Ask them for three changes and write what you will do about each.
Check yourself
- Name five documents for a tender file.
- Why should customers' credentials not be held by the business?
- In the forecast, which months are the thinnest and why?
Glossary
| Term | Meaning |
|---|---|
| 5 whys | Asking "why?" repeatedly to find a root cause |
| Balance sheet | List of assets, liabilities and equity on one date; it must balance |
| Bill of quantities (BOQ) | Itemised list of materials and labour with prices |
| Break-even | Sales that just cover all costs |
| Commissioning | Testing and proving a system works as designed before handover |
| Creditor / debtor | Someone you owe / someone who owes you |
| Depreciation | Spreading the cost of tools and vehicles over their useful life |
| Input / output VAT | VAT you pay on purchases / VAT you charge customers |
| Margin / mark-up | Profit as a share of price / of cost |
| Method statement | Written plan for doing a risky task safely |
| Reconciliation | Matching the cash book with the bank and MoMo statements |
| Skills matrix | Table of tasks and each person's level |
| SLA | Service-level agreement: what you promise and how fast |
| Trunk port | Switch link carrying several tagged VLANs |
| VLAN | Virtual network separating traffic on one switch |
| WHT | Withholding tax deducted by the payer |
Logbook
- Unit 1: three test plans and results; root-cause report; quality review; returns log; supplier register
- Unit 2: VLAN and IP plan; separation tests; method statement; monitoring set-up; updated network document
- Unit 3: survey report; proposal with BOQ; daily site records; commissioning sheet; handover and compliance pack; draft SLA
- Unit 4: skills matrix; weekly job plans; toolbox-talk records; near-miss log; confidentiality agreements; statement of terms
- Unit 5: legal-form comparison; registration checklist with fees and sources; start-up budget; one-page plan; officials' answers
- Unit 6: cash book month; payslip; VAT working; P&L; balance sheet; reconciliation; November exercise
- Unit 7: growth plan; ethics code; 12-month forecast; capstone score sheet and improvement plan
- Every homework, dated
Self-check quiz
- How do you prove an intermittent fault is fixed?
- What is a VLAN, and how many does 802.1Q allow?
- Name the four VLANs in the simple business plan and what each is for.
- What must a method statement for height work include?
- Name five items in a CCTV proposal.
- What is in the owner's compliance support package?
- When may you sign off a team member as competent on a task?
- What does ORC charge for a business name, a partnership and a company limited by shares?
- Why does an IT and CCTV business usually register for VAT from the start, and what is the effective rate?
- Work out net pay for a technician on GH¢1,800 gross in 2026.
- In the October example, why is the closing bank balance not all "free" cash?
- What does the panel look for in the capstone pitch?
Further reading and sources
Best next reads: your Level 1 and Level 2 manuals; the Hub's Money Skills Level 2 and Entrepreneurial Thinking Level 2; the ORC, GRA, SSNIT, DPC, NCA and GEA websites; your switch, router and NVR manuals; CISA's network security guidance.
What this module does not cover: mains electrical wiring (CEWP electricians only); guarding or alarm-monitoring services (licensing not verified); legal advice on data protection (the owner takes their own advice); enterprise-scale data centres and servers.
Every source used in this manual is listed, with links, in the Teacher Copy.