About this module
In Level 2 you made safe products and wrote down your rules. In Level 3 you design the system, prove it works with tests and records, pass the inspections, keep the books and build a food business that outlives one batch.
Who it is for. People who have finished Food Processing and Cold Vending Level 2, or who can show the same skills. Ghana's TVET framework describes National Proficiency II as work that is mostly routine and predictable, under limited supervision. It describes National Certificate I as "complex and varied activities under minimum supervision", and National Certificate II as complex, non-routine work with considerable responsibility and the ability to guide others. This module is written at an advanced level, comparable to National Certificate I, reaching toward National Certificate II where you supervise staff. That is the author's matching, not an official ruling.
CTVET status. CTVET lists Culinary Art and Hospitality and Catering Management at the lower levels, but no separate food-processing programme. This module is not those curricula and is not accredited. It follows CTVET's format so it can be put forward later.
Rules and fees change. Every fee, permit and rule in this manual was checked in October 2026 from public pages, and several pages were hard to read or disagreed with each other. Each such place is marked. Confirm with the FDA, the Ghana Standards Authority (GSA), the EPA and your Assembly before you pay or print. Example numbers are labelled "example". This manual is not legal, tax or financial advice.
Bridge from Level 2: what you already know
- Write a flow diagram, a hazard table and daily records; know GMP and the seven HACCP principles in plain words
- List FDA registration documents, explain the Ghana Standards mark and write a Level 2 label
- Pasteurise and hot-fill, start a shelf-life test and choose packaging
- Make juice, shito, groundnut paste and gari safely; know the aflatoxin and cyanide risks
- Compare freezers, run a cold-chain log, do a payback sum and use a margin formula
- Plan a supply offer to a school, shop or hotel and write a one-page growth plan
Level 2 did not cover how to build and prove a full HACCP plan, ISO 22000 and FSSC 22000, laboratory shelf-life testing, batch records and recalls, GS1 barcodes in practice, solar cold-chain sizing, plant layout, export documents, a full set of books or a 12-month forecast. This manual does. For general bookkeeping and venture basics see the hub's Money Skills Level 2 and Entrepreneurial Thinking Level 2; this manual goes deeper for a food processor only.
How the module works
Each unit has learning outcomes, performance criteria, the range and the evidence your assessor needs. You are judged Competent or Not Yet Competent. Units 1 to 4 are technical. Units 5 to 7 are about your own business. The running example is Esi's Cold Kitchen, an invented small business in Sekondi-Takoradi that makes shito and hot-filled pineapple sobolo and sells cold drinks from a solar freezer. All of Esi's figures are examples.
Unit 1 · A food safety management system
At Level 2 you wrote the rules. At Level 3 you design the system, prove that it works, train people to run it and let an auditor test it.
Competency standard
| Learning outcome | Performance criteria — the trainee… |
|---|---|
| 1.1 Write prerequisite programmes | writes procedures, schedules and records for water, cleaning, pests, maintenance, suppliers, people and recall |
| 1.2 Design a HACCP plan | follows the Codex steps: team, product description, flow diagram, site check, hazard analysis, CCPs, limits, monitoring, corrective action |
| 1.3 Validate and verify | collects evidence that the limits work and checks the system with records, calibration and tests |
| 1.4 Compare management systems | explains FDA, GSA, ISO 22000 and FSSC 22000 routes, with costs and when each is worth it |
| 1.5 Train and audit | runs a staff training plan and an internal audit with corrective actions |
Range. One hot-filled drink and one sauce, plus one cold-vending point. Evidence. PRP file; HACCP plan; validation plan; training matrix; internal audit report; oral questions.
Why a system, not just rules
Prerequisite programmes such as good hygienic practice and training must be "well established, fully operational and verified" before HACCP is applied. HACCP then adds focused control at the steps that matter most. Where a hazard has to be controlled and no step controls it, the Codex text says to redesign the product or process. A system means three things in writing: what you do, how you check it and what you do when it fails.
Prerequisite programmes (PRPs) you must write
Each programme is a one-page procedure with an owner, a schedule and a record. Codex asks for effective systems for cleaning, pest control, waste, water, personal hygiene, incoming material control and recall.
| Programme | What the procedure fixes | Record you keep |
|---|---|---|
| Water | Source, treatment, storage and testing; potable water as in the WHO guidelines | Water test results; tank cleaning date |
| Cleaning and sanitising | What, how, how often, which chemical, who; rinse after chemicals | Cleaning schedule signed daily |
| Pest control | Screens, doors, bait points, waste, storage off the floor | Weekly pest check sheet |
| Maintenance and calibration | Thermometers, scales, pH meter, freezer thermostat | Calibration log with dates and results |
| Supplier approval and incoming checks | Specification, inspection on arrival, sorting; refuse mouldy or damaged material | Supplier list; goods-in sheet |
| People | Medical certificate, clothing, handwashing, illness reporting, visitors | Health certificates; illness log; training record |
| Storage and transport | Dry store, cold store, cool box, stock rotation | Temperature logs; stock cards |
| Waste and drains | Bins with lids, daily removal, drains cleaned | Waste log |
| Recall and complaints | Who decides, who calls whom, in what time (Unit 3) | Complaint book; mock recall report |
| Training | Induction, refresher, competence checks (below) | Training matrix |
Do the water test once a year at least and after any tank work. The FDA laboratory lists a drinking-water test for E. coli and coliforms at GH¢115. Ask your lab for the right test and sampling bottle.
HACCP plan design, step by step
Codex lists the steps in this order: assemble the team, describe the product, identify the intended use, draw the flow diagram, confirm it on site, list the hazards and do the hazard analysis, find the CCPs, set critical limits, set monitoring, set corrective actions, set verification and keep records. The seven principles are hazard analysis, CCPs, critical limits, monitoring, corrective action, verification and records. Flexibility for a small business is allowed, but "all seven principles must be applied". The text read for this manual is the 2003 edition; Codex revised it in 2020, so read the current text too. The FAO and WHO also publish guidance for small and less-developed businesses.
Step 1: Team. In a small plant the team can be you, your helper and an outside adviser. Codex says expert advice may come from trade associations, independent experts and regulators. Write the scope: which product, which part of the chain, which hazards.
Step 2: Describe the product. Composition, pH and water activity, the heat or cold treatment, the pack, shelf life, storage and how it is distributed.
Step 3: Intended use. Codex notes that vulnerable groups, for example institutional feeding, may have to be considered. If you supply a school, the plan must say so.
Steps 4 and 5: Flow diagram and site check. Draw every step, then walk the line during real production and correct the diagram. A diagram nobody has checked is not a diagram.
Step 6: Hazards. List biological, chemical and physical hazards at each step and the control for each, noting how likely and how severe they are.
Step 7: CCPs. A CCP is a step where control can be applied and is essential to prevent, eliminate or reduce a hazard to an acceptable level. A decision tree can help.
Step 8: Critical limits. A critical limit "separates acceptability from unacceptability", must be measurable, and must be validated.
Steps 9 to 12: Monitor, correct, verify, record. Monitoring is a planned series of observations or measurements. A corrective action is what you do when monitoring shows loss of control.
Worked example: hot-filled pineapple sobolo (example plan)
This is a teaching example, not an approved plan. Its limits are proposals you would have to validate.
Product description. Hibiscus, water, ginger, pineapple, cloves and sugar, boiled, strained, hot-filled into 500 ml bottles with new caps, chilled, delivered in a cool box. Ready to drink. Sold to the public and to a school (so children are an intended group).
Flow diagram. 1 Receive ingredients, bottles and caps → 2 Store → 3 Sort and wash → 4 Weigh and combine → 5 Boil → 6 Strain and sweeten → 7 Wash and sanitise bottles (in parallel) → 8 Hot-fill → 9 Cap and lay on side → 10 Cool → 11 Label with batch and date → 12 Chill → 13 Deliver in a cool box → 14 Sell.
| Step | Hazard | Control | CCP or PRP | Critical limit (proposed) | Monitor | If it fails |
|---|---|---|---|---|---|---|
| 1 Receive | Mould, dirt, stones | Supplier approval, sort | PRP | Refuse mouldy or damaged lots | Look at every delivery | Return or discard |
| 3 Wash | Dirty water | Safe water | PRP | Water test in date | Check the log | Stop; use boiled or bought water |
| 5 Boil | Disease germs survive | Rolling boil | CCP 1 | Rolling boil for at least 30 minutes | Clock and thermometer, every batch | Keep boiling; if cooled below boil, restart the 30 minutes |
| 7 Bottles | Germs and glass chips | Wash, sanitise, inspect, new caps | PRP | No chips, cracks or old caps | Visual check of every bottle | Discard the bottle |
| 8 Hot-fill | Germs from air, bottle or hands | Fill hot, cap at once | CCP 2 | Fill at or above 85 °C; this is an example inside the 80–95 °C pasteurising range | Probe in the jug every 10 bottles | Reheat; bottles filled cold go on hold and are not sold |
| 12 Chill | Germs grow | Cold | CCP 3 | Below 5 °C | Thermometer, twice a day | Move stock; discard if over 5 °C for more than 2 hours |
| 13 Deliver | Warm drinks | Cool box and ice | PRP | Cool-box test passed (Unit 4) | Check on loading | Do not deliver |
The Takoradi study found harmful bacteria in every sobolo sample, mostly made by cold extraction with poorly washed bottles. That is why CCP 1 and the bottle PRP matter. The 85 °C figure is an example that sits inside the pasteurising range of 80–95 °C for 1–10 minutes in the juice guide.
Worked example: shito (example plan)
Shito is simmered in oil with little or no added water. FDA-registered shito had lower water activity and a lower aerobic count than unregistered shito, and E. coli was found in some samples. So the hazards are germs from raw materials such as dried fish or shrimp powder and peppers, and recontamination at filling. The FDA laboratory also tests food for Sudan dyes, so buy red pepper and oil from suppliers you can trace.
| Step | Hazard | Control | CCP or PRP | Limit |
|---|---|---|---|---|
| Receive fish powder, pepper | Germs, mould, dyes, stones | Approved suppliers, sort, supplier papers | PRP | Refuse damaged lots |
| Simmer | Raw-material germs survive | Simmer until the moisture cooks away, no added water | CCP | Your validated time and temperature (not found; build it with a laboratory, Unit 2) |
| Cool and fill | Recontamination | Clean dry jars, dry spoon, new lids | PRP | Jars dry; no hand contact |
| Store | Mould, rancidity | Dry cool store, shelf-life date | PRP | Within tested shelf life |
A tested recipe with times and temperatures was not found. That is why the CCP limit is left for you to validate.
Validate and verify
Validation is "obtaining evidence that the elements of the HACCP plan are effective". Verification is the use of methods, procedures and tests, in addition to monitoring, to decide whether you comply with the plan. Validation asks, "Are the limits right?" Verification asks, "Are we following the plan?"
- Validate before you sell: run at least three batches at your limits, send retained bottles or jars to a laboratory at the start and end of shelf life (Unit 2), and record the results.
- Verify every week: someone other than the person who monitors reads the records. Codex says verification should be done by a person other than the one doing the monitoring and corrective action.
- Calibrate every thermometer at least once a week, and after any drop: push the probe into crushed ice with a little cold water. A reading within 1 °C of 0 °C is accepted in one state health-department guide; if it is outside, adjust it by the maker's instructions.
- Review the plan whenever the product, process or any step changes.
Classify and limit
For Esi's shito line, decide whether each is a CCP or a PRP, and write one measurable limit or check: (1) simmering the sauce; (2) washing jars; (3) accepting a sack of dried fish powder; (4) fridge storage of fresh sobolo; (5) sieving out stones. Then say who should verify (3).
Standards and certificates: which route?
| Route | What it is | Cost pointers | Think about |
|---|---|---|---|
| Your own HACCP-based system | Plan, records, FDA licence and registration | Costs of Unit 5 | The legal base; buyers may ask to see it |
| FDA HACCP services | The FDA offers HACCP training, system installation, validation and certificate by scale | Small scale: validation and certificate GH¢500; training, installation and certificate GH¢2,500; yearly renewal GH¢500 | Check what a certificate from the FDA gives you with buyers |
| GSA product certification | Standard mark on a product; the GSA asks for a HACCP study for each food product standard | See Unit 5 | Aimed at products, not at the whole system |
| ISO 22000 | The food safety management system standard; second edition 2018; voluntary; for any organisation in the food chain | The GSA offers ISO 22000 and HACCP system certification; fees depend on the size and nature of the organisation | The GSA page says its accreditation scope is ISO 9001; ask whether ISO 22000 is covered |
| FSSC 22000 | A scheme built on ISO 22000, with sector PRP standards and extra FSSC requirements; GFSI-recognised; Version 7 published May 2026; a certificate is valid for three years if the system is maintained | Not found; ask a certification body for a quote | Needed mainly when a large buyer or exporter demands it |
ISO 22000 stresses communication with suppliers and customers along the food chain, works through two plan-do-check-act cycles (one for the management system, one for operations), treats prerequisite programmes as the foundation of HACCP, and separates prerequisite programmes from operational controls. In the author's reading of the standard, operational controls are either CCPs with critical limits or operational prerequisite programmes with action criteria; that reading was not checked against the standard itself, so read ISO 22000:2018 before you plan a certification.
Is HACCP compulsory for you? No page read for this manual says that a cottage or micro processor must hold a written HACCP plan to be licensed. The FDA licensing guideline asks for a business certificate, medical certificates for each production worker, a Site Master File for a new application, and where relevant an EPA schedule. The GSA mark does demand a HACCP study, and the FDA sells HACCP services. Not verified: what an FDA inspector scores for your scale. Ask the FDA Western Regional office.
Staff hygiene training
Codex says everyone who handles food should be trained to a level suited to the work, that managers should be able to judge risk, that training should be checked and that refresher training should be routine. The FDA runs paid courses: Good Manufacturing Practices and Good Hygienic Practices at GH¢200 a person each, Food Safety Supervisors' courses at GH¢500 (introductory) and GH¢800 (advanced), and HACCP courses at GH¢600 (introductory) and GH¢800 (advanced). Production workers also need medical certificates.
A training matrix lists each person, each topic, the date trained, who checked competence, and the date for refresher.
| Person | Induction | GMP and GHP | Handwashing check | HACCP basics | Next refresher |
|---|---|---|---|---|---|
| Esi (owner) | n/a | Done | Done | Introductory | 12 months |
| Helper | Day 1 | Booked | Day 1 | Plan briefing | 6 months |
| Packer | Day 1 | Booked | Day 1 | Plan briefing | 6 months |
Cost the training
Esi has two helpers and herself. Each helper takes the FDA GMP and GHP courses. Esi takes the introductory Food Safety Supervisors' course and the introductory HACCP course. What is the total course cost?
Internal audit
An internal audit is a planned check by someone who does not run the area. Use a checklist built from your own procedures and score each item met, partly met or not met. Every "not met" gets a corrective action with an owner and a date, and a root cause, not just a quick fix. Review the open actions at a short monthly meeting, and look at the whole system once a year in a management review (this is the author's method).
Grade the audit
An audit of Esi's kitchen has 20 items. 14 are met, 4 partly met and 2 not met. The two not met are "no thermometer calibration in the last 3 months" and "fridge log missing for 2 days". (1) What percentage is fully met? (2) Write a corrective action and a root cause for each fault. (3) Which fault is more dangerous, and why?
Build the system
- Choose one product. Write the product description, intended use and a flow diagram of at least ten steps. Walk the real process and correct it.
- Complete the hazard table. Mark each step PRP or CCP, write measurable limits, monitoring, correction and record.
- Write three PRP procedures (cleaning, supplier approval, calibration) and set up the calibration log. Calibrate two thermometers in ice water.
- Fill in a training matrix for yourself and two imagined staff.
- Audit a classmate's kitchen or logbook against a 20-item checklist and write two corrective actions.
Ask an auditor
Phone or visit the FDA Western Regional office or the GSA Takoradi office. The GSA lists takoradi@gsa.gov.gh as the Western Region address for product certification applications. Ask what a micro or small food maker is scored on at inspection. Write the answer and the date.
Unit 2 · Product development, shelf life, packaging and laboratories
A product is not finished when it tastes good. It is finished when you can show, with tests, how long it stays safe and good.
Competency standard
| Learning outcome | Performance criteria — the trainee… |
|---|---|
| 2.1 Develop a product | writes a brief, runs recorded bench trials, holds a taste test and costs the product from the target price |
| 2.2 Use the hurdles | names the heat, cold, acid, water and packaging controls of a product and measures what can be measured |
| 2.3 Plan a shelf-life study | designs a real-time and an accelerated test, reads the results and sets a safe date |
| 2.4 Work with laboratories | chooses a laboratory, lists the tests, prepares samples and reads a certificate of analysis |
| 2.5 Design packaging | compares pack options for safety, shelf life, cost and brand |
Range. One new or improved product; one shelf-life study; one laboratory request. Evidence. Product brief; trial sheets; taste-test results; shelf-life plan and data; laboratory quote; packaging comparison.
From idea to product: the path
| Stage | What you do | What you record |
|---|---|---|
| 1 Brief | Who buys it, at what price, in what pack, with what shelf life | One page, dated |
| 2 Bench trials | Make 1 litre or 500 g at a time; change one thing per trial | Recipe, weights, times, temperatures, notes |
| 3 Taste test | Blind comparison with coded cups, order varied | Counts and comments |
| 4 Costing | Work from the target price back to the maximum cost | Costing sheet |
| 5 Pilot batch | Make a full batch, check yield and the process steps | Batch record (Unit 3) |
| 6 Safety check | Hazard analysis, limits, validation tests (Unit 1) | HACCP page |
| 7 Shelf-life study | Real-time and accelerated tests (below) | Test sheet |
| 8 Label, registration, barcode | Units 3 and 5 | Draft label, checklist |
| 9 Small launch | Sell to a few buyers, collect comments, adjust | Feedback sheet |
This is the author's path, built from good practice; it is not a legal sequence. Change one thing at a time in the trials, or you cannot say what caused a change.
A taste test needs enough people. In a blind paired test, each taster gets two coded samples and says which they prefer. If 40 tasters give 26 for recipe A and 14 for recipe B, A has 65% of the votes. A result near 50-50 means the tasters cannot tell the difference. The author's rule of thumb is to use at least 30 tasters who are not your family, and to repeat the test if the result is close.
Cost from the price back
You plan a mild pepper sauce in a 150 g jar. Shops will sell it at GH¢18 and keep 25% of the shelf price. You want a 35% margin on your own selling price. (1) What do you receive per jar? (2) What is the highest total cost per jar that gives a 35% margin? (3) Your costing shows GH¢9.60. How far over are you, and give two ways to close the gap.
The hurdles that keep food safe
A product stays safe and good because several controls work together: heat, cold, acid, low water, packaging and (where allowed) a preservative. Codex says that temperature controls must take account of the food's water activity and pH, the intended shelf life and the packaging.
- Heat. Boil and hot-fill, as in Level 2.
- Cold. Keep below 5 °C.
- Acid. Measure pH on every batch of a drink or a sauce and write it down.
- Less free water. Shito is simmered in oil with little water, so its water activity falls and it keeps longer. Registered shito in a Ghanaian study had lower water activity and lower germ counts than unregistered shito.
- Packaging. Clean, dry, sealed, new caps.
- Preservatives. Measure them exactly because they "may be subject to local laws". Which preservatives Ghana allows, and at what level, was not verified. As a foreign guide: in the United States, sodium benzoate may be used up to 0.1% of the food (about 1 g per kilogram), and potassium sorbate may be used at the level good manufacturing practice needs, with no fixed number. These are US rules, not Ghana law. Ask the FDA before you add any preservative, weigh it exactly and name it on the label.
In the United States, an "acidified food" is a low-acid food with acid added, water activity above 0.85 and a finished pH of 4.6 or below. That is a US definition quoted by a laboratory company, not Ghana's rule. It shows why pH and water activity are the two numbers a food technologist asks for first. CSIR-FRI lists water activity among its physical tests. Buy or borrow a pH meter, and calibrate it by the maker's instructions.
Plan a shelf-life study
Shelf life ends when the product is no longer safe or no longer good. Decide first which kind of failure you are watching for: a safety failure (germs, toxins), a quality failure (colour, taste, rancidity, texture) or a pack failure (leaks, swollen lids).
Real-time testing keeps the product at its real storage conditions for as long as you plan to claim. Accelerated testing stores the food hotter than normal so a known change runs faster, then uses a model to predict shelf life at the normal temperature. A common shortcut, the Q10 rule, says the rate multiplies by Q10 for every 10 °C rise. A Q10 of 2 is a common planning assumption, but measured values vary widely; in the guide's own example Q10 = 2 predicts 28 weeks at 25 °C and Q10 = 3 predicts 63 weeks. The Arrhenius equation extrapolates more reliably than Q10; all test temperatures must stay below any fat melting point or other change of physical state; only real-time storage under realistic conditions shows that the extrapolation holds; and accelerated testing cannot predict the microbial shelf life of chilled foods.
Never extend a date without data. Write the acceptance rules before you start. Throw away any jar that looks, smells or swells wrongly. Never taste a suspect jar.
Your own real-time study (from Level 2, now with rules).
| Item | Rule |
|---|---|
| Samples | At least 10 sealed units from one batch, stored where the product will really be kept (ambient or fridge); record the room temperature with a min-max thermometer |
| Checks each week | Open one unit: appearance, smell, seal, lid, gas, mould; measure pH; record the date and what you see |
| Laboratory tests | A micro panel at the start, at the middle and at the end; for oil-based products add a rancidity test such as peroxide value (the FDA laboratory lists peroxide value, Source: FDA Fees 2023) |
| Stop rule | Stop when a unit fails any pre-written rule |
| Date on the label | Shorter than the first failure, with a margin the author suggests at about two-thirds of the lowest estimate, and keep the real-time test running |
| Retained samples | Keep two sealed units from every batch until a month past the date (the author's practice) |
Accelerated testing at a laboratory is costly. The FDA laboratory lists accelerated stability testing at GH¢5,000 for the first year and GH¢1,700 for each later year, and the layout of its long-term stability lines was unclear. Compare that with your own study plus the micro panel (below), and ask CSIR-FRI, which lists shelf-life studies among its services. Its price was not found.
Q10 shelf life
A jar of shito stored at 40 °C fails (rancid smell) at 6 weeks. The shop shelf is about 30 °C. (1) With Q10 = 2, what shelf life does the rule predict at 30 °C? (2) With Q10 = 1.5? (3) If you label at two-thirds of the lowest estimate, how many weeks is the label? (4) The shop is actually at 35 °C. With Q10 = 2, what does the rule predict from your 40 °C result?
Laboratory partners
Use an accredited laboratory for the results you show to buyers or the FDA. Accreditation to ISO/IEC 17025 is for specific tests, so ask for the scope of the tests you need.
| Laboratory | What it offers | Notes |
|---|---|---|
| FDA Centre for Laboratory Services and Research (Accra) | Six laboratories. Food Microbiology: sixteen tests listed, including aerobic plate count, coliforms, E. coli, Salmonella, S. aureus, yeasts and moulds. Food Physicochemical: pH, loss on drying, ash and Sudan dye tests accredited; proximate analysis, metals, mycotoxins and pesticide residues done but not listed as accredited | Accreditation certificate AT 1870 from the ANSI National Accreditation Board is shown on its page; its test counts did not always match its lists, so ask for the scope |
| Ghana Standards Authority laboratories | Microbiology accredited for yeasts and moulds, aerobic plate count, S. aureus, E. coli, coliforms and Salmonella in food and environmental swabs | The Western Region address for GSA product certification enquiries is takoradi@gsa.gov.gh; ask which laboratory runs your test |
| CSIR-Food Research Institute (Accra) | Water activity, shelf-life studies, moisture, microbiology; some methods accredited; extension, business incubation and equipment fabrication | Its contact page listed an analytical services line, 024 644 6680; confirm before you call |
| KNUST Department of Food Science and Technology | Food testing laboratory reported as ISO/IEC 17025:2017 accredited | University laboratory; ask for fees and sample rules |
FDA laboratory prices. The schedule is a scan whose table layout is jumbled, so check any figure before you budget.
| Test | GH¢ per sample |
|---|---|
| Registration analysis, microbiology and food chemistry, locally made product | 1,000 |
| Aerobic plate count | 35 |
| Yeasts and moulds | 58 |
| Enterobacteriaceae | 58 |
| E. coli | 81 |
| Salmonella | 81 |
| Staphylococcus aureus | 81 |
| Listeria monocytogenes | 100 |
| Bacillus cereus | 100 |
| Peroxide value | 56 |
| Heavy metals, per metal | 50 |
| Sudan dyes | 173 |
| Drinking water, E. coli and coliforms | 115 |
A five-test routine panel for a ready-to-eat sauce could be aerobic plate count, yeasts and moulds, E. coli, Salmonella and S. aureus: 35 + 58 + 81 + 81 + 81 = GH¢336 (author's choice of tests; ask the laboratory and the relevant Ghana Standard which tests and limits apply).
Take a good sample. Take sealed, labelled units from the real batch; write the batch, date, product, storage and who took it; keep chilled products cold on the way; deliver the same day (author's advice).
Read the certificate of analysis. Check the sample name and batch, the date received, each test and method, the result and unit, the limit used and the laboratory's signature. A result is only useful if you know the limit it is compared with. The FDA will not accept a registration application without a certificate of analysis for each product and variant.
The yearly laboratory budget
Esi sends one sample of each of her two products every quarter for the five-test panel at the individual FDA prices above, and once a year one peroxide value test on the shito. What does she spend in a year?
Packaging design
Packaging protects, keeps, informs and sells. Choose it after you know the hazards and the shelf-life failure.
| Product | Pack idea | Check |
|---|---|---|
| Hot-filled sobolo or juice | Glass bottle or a bottle made for hot-filling, new cap | Cracks and chips, hot-fill rating, cap fit, no old caps |
| Shito | Glass jar with a lid and liner | Dry, clean jar; small headspace; opaque or dark storage for oil products (the author's advice) |
| Groundnut paste | Clean jar or food-grade tub | Dry storage; no water (Level 2) |
| Gari | Clean, dry food-grade bag | Damp makes it mould (Level 2) |
A seal that shows if it has been opened (a band or an inner foil) gives buyers confidence (the author's advice). Ask suppliers in writing that the container is suitable for food. No Ghana rule on food-contact packaging was found (the FDA registers the food, and no separate packaging approval was found in the sources read), so ask the FDA and GSA.
Packaging is a big share of cost. In Esi's shito batch (Level 2 example), jars, lids and labels were GH¢200 out of GH¢610 direct cost: 200 ÷ 610 = 32.8%.
Order size for jars
A jar supplier quotes (examples): 100 jars at GH¢3.50 each, 500 at GH¢2.90, 1,000 at GH¢2.60. Esi uses 240 jars a month. (1) What would 1,000 jars cost, and for how many months do they last? (2) How much does she save per month, against buying 100 at a time? (3) Name two risks of buying 1,000 at once.
Develop and test a product
- Write a one-page brief for a new or improved product. Run three bench trials and record every change.
- Hold a blind paired taste test with at least 30 people (class, staff, visitors) and record the counts.
- Cost the product from a target shelf price. Work out the maximum cost per unit.
- Make a pilot batch and start a 10-unit real-time shelf-life test with written acceptance rules. Measure pH on the batch.
- Write to a laboratory (or phone with your trainer) for a quote and the sample rules for the micro panel, and prepare a labelled sample.
- Compare two packaging quotes by cost per unit and by risk.
Ask a laboratory
Phone or email the FDA laboratory, the GSA Takoradi office or CSIR-FRI. Ask for (a) the test list for your product, (b) the price, (c) how long results take and (d) the sample size and delivery rules. Write down the answers, the date and the name of the person.
Unit 3 · Process control, batch records, traceability, recall, labels and barcodes
A good batch is not luck. It is measured at set points, written down, coded so you can find it again, and labelled so the next person can use it safely.
Competency standard
| Learning outcome | Performance criteria — the trainee… |
|---|---|
| 3.1 Control a process | sets targets and tolerances, checks the measuring tools and spots drift on a run chart |
| 3.2 Keep batch records | completes a batch record, works out yield and reconciles materials and containers |
| 3.3 Trace and recall | codes every lot, links suppliers to customers and runs a mock recall using the FDA guideline |
| 3.4 Handle faults and complaints | decides sell, rework or reject, finds the root cause and writes a corrective action |
| 3.5 Label and code | completes an FDA-style label, explains GS 46:2004 and calculates a GTIN check digit |
Range. Two controlled batches; one mock recall; one label; one barcode exercise. Evidence. Batch records; run charts; mock recall report; complaint file; label; barcode sums.
Control points, targets and tolerances
Every step that matters has a target, a tolerance and a tool. A tolerance is the range around the target that you accept. Codex says that control procedures may be simple, such as checking stock rotation, calibrating equipment or loading refrigerated display units correctly.
| Step | Target | Tolerance | Tool | How often | If out |
|---|---|---|---|---|---|
| Weigh pepper, fish powder, oil | Recipe weight | ± 1% (example) | Checked scale | Every ingredient | Re-weigh |
| Boil sobolo | Rolling boil, 30 minutes | Minimum | Clock, probe | Each batch | Keep boiling |
| Hot-fill | 85 °C or more (example) | Minimum | Probe in jug | Every 10 bottles | Reheat; hold stock |
| Cool box | 5 °C or less | Maximum | Thermometer | At loading | Do not deliver |
| Fridge | Below 5 °C | Maximum | Thermometer | Twice a day | Move stock; apply the 2-hour rule |
| Net content | Label weight | Never below label | Scale | Sample of each batch | Re-fill |
Check your tools. Calibrate thermometers in crushed ice at least weekly. Test the scale with a known weight each morning, and calibrate the pH meter with buffer solutions by the maker's instructions (the author's advice). Codex says temperature recording devices should be checked at regular intervals and tested for accuracy.
Run charts catch drift. Write each reading in time order. A single reading outside the limit is a deviation. A slow rise over days is drift, and it warns you before the limit is broken.
Read the fridge log
Esi's drinks fridge log for one week (example, °C): Mon 3.5 and 4.0; Tue 4.0 and 4.5; Wed 4.5 and 6.5; Thu 7.0 and 4.0; Fri 3.5 and 3.8; Sat 4.2 and 4.6; Sun 4.0 and 8.5. The first number is the morning reading and the second the evening reading. The rule is: below 5 °C, and stock above 5 °C for more than 2 hours is discarded. (1) Which readings break the limit? (2) What do you do about Wednesday evening and Thursday morning? (3) What do you ask about Sunday evening? (4) What three columns would you add to the log sheet?
Batch records
A batch record is the written history of one batch from raw materials to release. Codex says records of processing, production and distribution should be kept for a period that exceeds the shelf life of the product. A good record has:
- Product, lot code, date, who made it, recipe version
- Each ingredient: supplier, supplier lot or delivery date, weight used
- Equipment used and cleaning done before the batch
- CCP readings: time, temperature, who read them
- Yield: finished weight or number of units
- Packaging lot or bottle and jar counts: issued, filled, broken, rejected, left over
- pH or other quick checks; retained samples taken
- Label check: date, batch code and weight correct
- Signature of the person who releases the batch for sale
Example (filled). Lot SH-261006-1 (shito, 6 October 2026, batch 1), recipe v3. Pepper 4.0 kg, onion 3.0 kg, oil 4.0 kg, fish powder 2.0 kg, spices and ginger 1.0 kg: total input 14.0 kg. Jars issued 44, filled 40, broken 2, rejected 1, spare 1. Simmer time and temperature recorded. Net weight check of 5 jars: all 250 g or more.
Yield is finished product as a share of the input weight: 40 jars × 0.25 kg = 10.0 kg; 10.0 ÷ 14.0 = 71.4%. A big fall in yield means water or material is lost, a weighing error, spilled sauce or a changed process, and each of those needs checking.
Yield and cost
A normal shito batch takes 14.0 kg of inputs and gives 40 jars of 250 g, with a direct cost of GH¢610. (1) What is the yield? (2) Another batch gives only 36 jars. What are the yield and the cost per jar now? (3) By what percentage did the cost per jar rise? (4) Name two causes to check first.
Lot codes and traceability
Codex says each container of food should be permanently marked to identify the producer and the lot, because lot identification is essential in recall and also helps stock rotation. The FDA label also needs a batch or lot number.
A simple lot code (the author's scheme). Product letters, then the date as year-month-day, then the batch number that day: SH-261006-1 means shito, 26-10-06, batch 1. Print or stamp it on every jar and write it on every invoice.
Three links make the chain.
- Supplier to batch: the batch record names the supplier and lot of every ingredient and of the packaging.
- Batch to customer: every invoice or delivery note names the lot you sent.
- Customer back to batch: you can start from a jar in a shop and find the record, and you can start from a bad ingredient lot and find every batch and customer.
GS1 Ghana also offers traceability services as well as barcodes. Use first-expire, first-out: sell the oldest dated stock first (the author's advice).
Recall under the FDA's guideline
The FDA's Guideline on Product Recall of 7 August 2023 says the FDA is responsible under section 123 of the Public Health Act (Act 851) to start and supervise the recall of non-compliant products. A voluntary recall is started by you after you find a safety issue, a defect or non-compliance. A statutory recall is requested or ordered by the FDA. A withdrawal of a product that does not break the law, or a stock recovery of product still under your control, is not a recall.
Classes. Class I: a dangerous or defective product that could cause serious health problems or death. Class II: a product that might cause a temporary health problem or pose a slight threat of a serious nature. Class III: a product unlikely to cause any adverse health reaction but that breaks FDA labelling or manufacturing laws.
| Class | How far the recall must reach | Time to start and stop sale |
|---|---|---|
| I | Wholesale, retail and consumer, with a public announcement in print, electronic media and the like | 24 hours |
| II | Wholesale and retail | 48 hours |
| III | Wholesale | 72 hours |
The table above is from the FDA guideline. The guideline also lists physical recall times of 72 hours, up to 10 days and up to 30 days. The table is laid out in columns that are hard to match with the classes, so ask the FDA which time belongs to which class.
What the guideline asks the recalling firm to do:
- Decide on the recall within 24 hours, up to 72 hours at most for Class I, once the information arrives
- Within 24 hours of the decision, tell the whole supply chain by the fastest means: phone, text, email or social media
- Say the name, batch and other identification, the reason, the action needed and the urgency, and what to do with the product
- Follow up with anyone who does not reply, and keep records of the notice, stock and returns
- Notify the FDA in writing with the batch, dates, quantities made, recalled and distributed, the distribution record, the cause and a root-cause report
- Do effectiveness checks: Level A is 100% of outlets, Level B between 10% and 100%, Level C 10% or less, Level D none
- Not dispose of recalled product without the FDA's permission and supervision
Penalties follow section 148 (4) and (5) of the Public Health Act 2012, and the FDA's fee schedule lists administrative charges per offence for unsafe or non-conforming products: for a small-scale industry GH¢10,000 for a high-risk hazard, GH¢5,000 for medium risk and GH¢2,000 for low risk. Codex adds that other products made under similar conditions should be checked and may need withdrawing, and that recalled product must be held under supervision until destroyed or made safe.
Mock recall
Lot SH-261010-1 had 40 jars. Your records show: Supermarket A (invoice 114) 12 jars; Shop B (invoice 115) 10; the school canteen (invoice 116) 5; eight jars sold by WhatsApp order to 7 named customers (7 jars) and one walk-in customer (1 jar); 5 jars left in your stock. A lab result shows Salmonella in a retained jar. (1) How many jars have left your control? (2) How many can you contact by name or outlet? (3) Which recall class does this look like, and what does the guideline require for time and reach? (4) After the recall: stock 5, A 12, B 8, school 5 and 4 direct jars come back. How many jars were recovered, and how many are not? What percentage of the jars that left your control did you get back? (5) What would you do about your other lots?
Faults, complaints and corrective action
A customer complaint is free information. Write it in a complaint book: date, name, product, lot code, what the customer says. Then:
- Stop. If it may be unsafe, pull the lot from sale while you check.
- Find the record. Open the batch record and the retained sample.
- Decide: sell if the product meets every rule; rework only if the process is safe and recorded (never rework mouldy, rancid or temperature-abused product); reject and destroy the rest.
- Find the root cause. Ask "why?" five times (the author's method).
- Fix the cause and change the procedure. Check later that the fix worked.
Hair in the jar
A customer finds a hair in a jar of lot SH-261006-1. Write the complaint entry, the immediate action, a root cause by asking why five times, and one corrective and one preventive action.
Labels
The FDA's general labelling requirements for pre-packaged food list: the product name (brand and generic), net weight or volume (or drained weight), the ingredients (specific names or E-numbers), date of manufacture, best-before or use-by date, batch or lot number, country of origin, the name and complete address of the manufacturer, directions for use and any storage or handling instructions. Labels must be in English and legible in indelible ink. Local manufacturers must also give the specific premises location address, such as house or plot number or the Ghana Post digital address. Where a product has primary and secondary packaging, both must conform. Evidence must be provided for nutrition information and claims. The FDA export guideline names the Ghana Standard GS 46:2004, Food Technology, Labelling of Pre-packaged Foods. The FDA's fee schedule lists a pre-registration label evaluation at GH¢200 per product and variant.
Registration number on the label? One law-firm guide says the FDA registration number must appear on the label. The FDA's label form lists no registration number. Not verified. Ask the FDA label desk and follow their answer. Never print a number you do not hold. Allergen wording is not listed in the FDA form read, so ask the FDA how to declare fish, groundnuts and other allergens. As a foreign guide, UK law lists 14 allergens that must be declared, including fish, crustaceans (such as shrimp) and peanuts, and says each one must be emphasised, for example in bold, every time it appears in the ingredients list, as in "whey (milk)". Writing "dried fish" and "shrimp powder" on a shito label follows the same habit. This is UK law, not Ghana law, so confirm with the FDA.
Fix this label
A jar label reads: "ESI'S SHITO. Hot pepper sauce. Good for your health, no preservatives. Ingredients: pepper, oil, fish. Best before: 3 months. Made in Takoradi." List every fault against the FDA list above.
Barcodes (GS1)
A barcode on a pack carries a GTIN, a Global Trade Item Number. GS1 Ghana issues and verifies barcodes, trains SMEs and offers traceability services. Ghana's GS1 prefix is 603. The first three digits of a 13-digit EAN/GTIN usually identify the GS1 member organisation that issued the number, not where the product was made. After them come a company code and an item code assigned by the company, and the last digit is a check digit that lets scanners catch errors. Barcodes are voluntary in Ghana, but fake ones that scanners cannot read hurt the country's name. The membership fee was not found. Email info@gs1gh.org or phone before you budget. A different size or flavour is a different product and needs its own number; this is the author's understanding of GS1 practice, so confirm with GS1 Ghana.
How to calculate the check digit: write the first 12 digits; multiply the digits alternately by 1 and 3, starting with 1 on the left (so the 12th digit is multiplied by 3); add the products; the check digit is the number that brings the total up to the next multiple of 10 (zero if the total already ends in 0).
Worked example (a textbook number, not a real company's). Body 400638133393: products 4, 0, 0, 18, 3, 24, 1, 9, 3, 9, 9, 9; sum 89; the next multiple of 10 is 90; check digit 1; full number 4006381333931.
Check digits
These bodies are made-up practice numbers, not issued codes. Never print them. (1) Find the check digit for 603123400011, 603123400028 and 603123400035. (2) A scanner rejects 6031234567869. Is the last digit right? What should it have been?
Run it in control
- Make two batches of a product with full batch records: weights, CCP times and temperatures, yield and container reconciliation. Assign lot codes.
- Chart a week of fridge readings and write the action for each deviation.
- Run a mock recall on one lot using your invoices and records. Time it: how long to identify every customer?
- Write a complaint entry for a made-up complaint and complete the root cause and corrective action.
- Write a full label for your product. Have a classmate check it against the FDA list. Work out the check digit for a practice GTIN.
Trace something
Ask a shop owner how they would find and remove a product if a supplier phoned with a recall. Write the answer. Then pick a food item at home and list what its label tells you about where and when it was made.
Unit 4 · Equipment, scale-up, plant layout and cold-chain engineering
The right machine pays for itself. The wrong layout lets germs walk from the raw side to the finished side. A freezer without power is only a box.
Competency standard
| Learning outcome | Performance criteria — the trainee… |
|---|---|
| 4.1 Select equipment | lists needs, compares options on materials, cleaning, power, repair and total cost |
| 4.2 Scale up safely | scales a process in steps, works out heating and fill times and re-checks the controls |
| 4.3 Plan a layout | draws a one-way plan with zones, handwashing, water, drains and waste |
| 4.4 Engineer the cold chain | sets temperature limits, sizes a solar freezer, plans ice and outages and keeps logs |
| 4.5 Maintain | writes a maintenance and breakdown plan for the plant |
Range. One small plant of 10–30 square metres and one cold-vending point. Evidence. Equipment comparison; scale-up sums; layout drawing; cold-chain plan and logs; maintenance plan.
Selecting equipment
Ask: What does it do? How many units an hour or a day? Can I clean it? What power does it need? Who repairs it nearby? What does it really cost over five years?
What Codex asks of equipment:
- Food-contact equipment must be designed so it can be cleaned, disinfected and maintained, and be made of materials with no toxic effect.
- It should be durable and, where needed, movable or able to be taken apart for cleaning, monitoring and pest inspection.
- Equipment that cooks, cools, stores or freezes food should reach the required temperatures quickly, hold them and allow them to be monitored and controlled.
- It should be placed so that it can be maintained and cleaned, and so that monitoring is easy.
A simple buying method.
- Write the process steps and the quantity you must handle per hour.
- Write what each machine must do and the power you have. A mains supply that fails needs a plan (below).
- Get at least three written quotes. Include delivery, installation and warranty.
- Compare total cost over five years: price + installation + energy + repairs. Prefer a machine for which spares and a repairer are in Takoradi.
- Ask for a trial, a reference customer or a visit.
Local fabrication. CSIR-FRI lists the fabrication, installation and maintenance of food processing equipment and industrial dryers among its services.
Asking prices, 7 October 2026 (mostly Accra and Kumasi; Western Region not checked). A chest freezer of about 100 L was advertised at GH¢2,200–2,799; about 200 L at GH¢2,799–3,599; about 300 L at GH¢4,699–5,199. A household slow juicer was about GH¢1,299, and a used commercial juicer about GH¢4,500. These are asking prices, not offers. Household juicers are not made for daily commercial work.
Five-year cost of a pulper
Option A is imported: GH¢12,000, 1.5 kW motor, spares from Accra in weeks, repairs about GH¢200 a year (examples). Option B is made in a local workshop: GH¢7,500, 1.5 kW, repaired in Takoradi in a day, repairs about GH¢300 a year (examples). Either runs 1 hour a day, 26 days a month, on electricity at GH¢2.20 a kWh (example). (1) What is the energy cost over 5 years? (2) What is the five-year cost of each option? (3) What would you ask before choosing the cheaper one? (4) What does a week with the machine broken cost you if it normally adds GH¢400 a week to profit?
Scale up in steps
When you make more, the physics changes. A bigger pot has more food for the same surface, so it heats and cools more slowly. Codex says the HACCP application "should be reviewed and necessary changes made" whenever the product, process or any step is modified. The author's rules for scaling:
- Scale by no more than about three times at a time.
- At each size, re-measure the CCP readings, yield, taste, pH and fill temperatures.
- Re-run a short shelf-life check and update the HACCP file.
- Keep the old batch size available until the new one works.
Heating takes longer. The energy to heat water-like liquid is mass × specific heat × temperature rise. Use 4.18 kJ per kg per °C for juice-like liquids (a textbook value). To heat 150 kg from 28 °C to 90 °C: 150 × 4.18 × 62 = 38,874 kJ. A burner that puts 8 kW into the pot supplies 8 kJ each second, so the heat-up takes 38,874 ÷ 8 = 4,859 seconds, about 81 minutes. For 50 kg: 50 × 4.18 × 62 = 12,958 kJ, so about 27 minutes. Three times the volume takes three times as long, unless you use more burner power (all example figures; a real burner and pot lose heat to the air).
The hot-fill window. Hot-fill only works while the liquid stays above the limit.
Fill window and heating
Esi's hot-fill jug starts at 92 °C and cools by 0.3 °C a minute when the heat is off (example). The limit is 85 °C. She fills 3 bottles a minute. (1) How many minutes until the jug reaches the limit? (2) How many bottles can she fill in that time? (3) She now has 150 bottles to fill. Give two ways to do it safely. (4) She wants to move from 50 kg to 150 kg batches of juice. Using 8 kW of net burner power, from 28 °C to 90 °C, how long does each batch take to heat, and what do you advise?
Plant layout and hygienic design
Codex says to locate premises away from polluted areas, flood-prone ground, pest-prone areas and places where waste cannot be removed, and to lay out rooms so that cross-contamination between and during operations is prevented. It asks for impervious walls and floors with drainage, smooth surfaces, ceilings that do not shed dirt, windows with insect-proof screens that can be removed for cleaning, doors with smooth non-absorbent surfaces, and food-contact surfaces that are smooth, non-absorbent and inert. Raw food should be kept apart from ready-to-eat food, physically or by time, with cleaning between. Where risks are high, staff should enter through a changing area, put on clean clothing and wash their hands.
Services Codex asks for. Potable water as in the WHO guidelines, a separate marked system for non-potable water, drains and waste systems that cannot contaminate food or water, cleaning facilities with hot and cold water, hand-washing and toilet facilities, and waste containers that are identifiable and, for dangerous substances, lockable.
One-way flow (the author's plan, following those principles). Raw and dirty things move one way, towards clean and finished things, and never back.
| Zone | Activity | Rules |
|---|---|---|
| A Entry and staff area | Handwashing basin with soap, hooks, lockers, boots or clean shoes, apron and hairnet | Everyone washes and dresses here; the toilet does not open into the production room |
| B Receiving and dry store | Deliveries checked and logged; dry goods on racks off the floor | Pest-proof; chemicals in a locked cupboard, away from food |
| C Raw preparation | Sorting, washing, peeling | Hard floor with a drain; separate from finished product |
| D Cooking and boiling | Boiling, simmering, hot-filling | Gas cylinder outside; fire extinguisher; heat and steam out; floor not slippery |
| E Filling and packing (clean side) | Capping, labelling, coding | Clean surfaces; no raw items; hand-wash nearby |
| F Cold store and dispatch | Fridge, freezer, cool boxes, loading | Thermometers; log; a separate door to the outside for dispatch |
| G Waste | Bins with lids, waste leaves by a separate route | Never through the clean side |
Layout for all. Make the main route level, with a ramp or step-free entry, wide doors and a turning space for a wheelchair; set one workbench at about 71–86 cm with knee space for a seated worker.
Find the layout faults
Esi rents a room. The front door opens straight into the sorting table. Dried fish powder is stored on the floor beside the finished jars. There is one sink, used for both hands and utensils. The toilet door opens at the filling table. The rubbish bin stands by the door to the clean packing side. The gas cylinder sits next to the cooker inside. Give at least six faults and a fix for each.
Cold-chain engineering
Know your limits. Chilled foods stay below 5 °C. Quick-frozen foods are held at −18 °C or colder at all points of the cold chain, subject to permitted short fluctuations, and the Codex code asks for storage that can control and record temperatures regularly. The limit is under review: WHO and FAO issued a call for data on how freezing temperatures affect the safety of foods, with a deadline in April 2026.
Mains, generator or solar? Mains is cheapest per unit but fails. Non-residential electricity tariffs in Ghana changed several times in 2026: PURC's April decision set non-residential bands of roughly 178 and 216 pesewas per kWh, with the layout of the table hard to read. Rates then rose 3.49% in July and were held unchanged for the fourth quarter. The author uses GH¢2.20 per kWh as an example below; read your own bill.
Solar sizing, step by step. Ghana's solar resource is reported at about 4 to 6 kWh per square metre per day, with coastal zones at 4.0–6.0 and the middle forest zone, which includes the Western Region, at 3.1–5.8. A site-specific Takoradi figure was not found, so use a modest 4.5 and check the Energy Commission or a local installer. Calculators commonly allow for losses by multiplying by 0.8 and recommend 24–48 hours of battery cover for cloudy spells.
- Daily energy: measure the freezer with a plug-in energy meter over several days with a typical load; take the average kWh a day.
- Panel power (kW) = daily kWh ÷ (peak sun hours × 0.8).
- Battery energy (kWh) = days of cover × daily kWh ÷ 0.8 usable.
- Battery capacity (Ah) = battery kWh × 1,000 ÷ system volts.
Using the example of 0.9 kWh a day: panels = 0.9 ÷ (4.5 × 0.8) = 0.25 kW = 250 W. One day of battery = 0.9 ÷ 0.8 = 1.125 kWh, which is 1,125 ÷ 12 = 94 Ah at 12 V; two days = 2.25 kWh = 188 Ah. A freezer with a direct-current compressor avoids inverter losses.
What is sold in Ghana. One Ghanaian dealer of KoolBoks lists models of 110, 200, 358 (chiller) and 530 litres and above, with claimed hold-over of up to 48, 72, 24 and 96 hours, pay-as-you-go plans with a small deposit and daily or weekly instalments by mobile money over terms of 6 to 36 months, and a warranty of 3 years on the unit and 8 years on the inverter compressor. It also lists service in Takoradi. These are the seller's claims and no price was given. Koolboks has filled an order for FanMilk micro-franchise vendors. Ask for a written quote, the kWh a day, the hold-over test and the monthly instalment.
Does the solar freezer pay?
A 200 L mains chest freezer costs GH¢3,200 and a solar freezer system GH¢11,000 (examples). The freezer uses 0.9 kWh a day; electricity is GH¢2.20 a kWh; one month is 30 days. (1) What is the monthly electricity cost? (2) What is the extra cost of the solar system? (3) How many months would the electricity saving alone take to repay that extra cost? (4) Esi loses 30 bottles at GH¢6.50 direct cost in one power cut a month. Add that avoided loss: how long now? (5) On a pay-as-you-go plan with a 20% deposit and 24 equal instalments, what is each instalment, ignoring any finance charge?
Ice and cold water. Ice is food. Use potable water, as the WHO guidelines define. Ice machines can carry germs even when the water is clean, so a study of ice machines recommends regular cleaning and disinfection, treating the water, staff hygiene training, a HACCP plan for ice, and periodic microbiological testing of the ice. Keep ice in a clean covered bin, take it with a clean scoop held by the handle, and never by hand (the author's advice). Keep ice packs sealed and away from food contact.
Temperature logs. Keep a log sheet for every fridge, freezer and cool box: date, time, reading, initials, action taken. Use a minimum-maximum thermometer so you see the worst reading between checks (the author's advice). Calibrate it weekly. The FDA fee schedule lists cold-chain monitoring log books at GH¢5 (as read from a jumbled table; Source: FDA Fees 2023).
Cool-box test. Load a cool box with chilled product at 4 °C and your usual ice packs. Put a probe in the middle of the load. Read every 30 minutes for 4 hours. The time until the middle reaches 5 °C is your safe delivery time. Write it on the box (the author's method).
Outage plan. Do not open the door. Note the time the power failed. If the contents have been above 5 °C for more than 2 hours, discard them (Level 1 and 2 rule). Do not refreeze thawed food that has warmed above 5 °C (the author's advice). Have a backup: a generator you can start safely outdoors, a solar freezer, rented cold space, or a pre-arranged ice supply. A solar cold store called AkoFresh rents space for about US$0.30 a day per 20 kg crate, for farm produce.
Cold storage licensing. The FDA's schedule lists local inspections of cold storage and dry warehouse facilities at GH¢800 (large), 500 (medium), 240 (small) and 120 (micro) and a licence for food distribution vans at GH¢60. Whether a small freezer inside a licensed kitchen needs a separate licence was not verified. STMA's fee table lists cold storage facilities by size but its columns were jumbled. Ask both.
Write the cold-chain plan
Choose your product. (1) Write the limit and the log schedule. (2) State the safe delivery time from a cool-box test. (3) Write an outage plan in five lines. (4) List what you would ask a solar dealer.
Maintenance and breakdowns
A maintenance plan lists each machine, what is checked and how often, who does it, and the spare parts to keep (the author's method).
| Item | Daily | Weekly | Monthly | Yearly |
|---|---|---|---|---|
| Fridge and freezer | Reading; door shut | Clean door seal; defrost if needed | Thermostat check against the thermometer | Service by the dealer |
| Burner and hose | Leak check with soapy water | Clean jets | Check hose clips | Replace hose as advised |
| Pots and fillers | Wash, dry | Check welds, handles | Check seals | Re-tin or replace worn parts |
| Thermometers, scales, pH meter | Scale check | Ice-point check | Buffer calibration | Replace if drifting |
| Solar system | Look at the panel; keep clear of shade | Wipe the panel | Check battery terminals | Installer service |
Keep a breakdown log: date, item, fault, cost, days lost. A repeat fault is a signal to replace the part or the machine.
Plan your plant
- Compare three real quotes (or advertisements) for one key machine on five-year cost and local repair.
- Draw a one-way layout of your plant or a classroom kitchen on one page with zones A–G. A classmate marks every fault.
- Work out heating time for a batch at two sizes and the hot-fill window for your jug. Test the real times and compare.
- Measure the kWh a day of a fridge or freezer if a meter is available. Do the solar sizing for it.
- Run a cool-box test and write the safe delivery time. Keep a full week of fridge logs.
- Write a one-page maintenance schedule.
Ask for a quote
Ask a solar freezer dealer or a local metal fabricator for a written quote for one item. Record the price, what is included, the warranty and who repairs it, with the date.
Unit 5 · Establish your own food business
You can make safe food and prove it. Now make a business that is legal, funded, staffed and findable.
Competency standard
| Learning outcome | Performance criteria — the trainee… |
|---|---|
| 5.1 Choose a legal form | compares sole proprietor, partnership, company and cooperative and picks one for a food business |
| 5.2 Register step by step | lists every body, document and fee a Takoradi food processor needs, with the tax route |
| 5.3 Plan premises and start-up | chooses a site and prices the start-up budget |
| 5.4 Fund and plan | compares funding, reads a loan offer and writes a one-page plan |
| 5.5 Staff, protect and market | hires under the Labour Act, plans insurance, accessibility and marketing |
Range. The trainee's own planned food business in Sekondi-Takoradi. Evidence. Registration checklist; start-up budget; payroll sum; one-page plan; pitch.
For the general basics see the hub's Money Skills Level 2 and Entrepreneurial Thinking Level 2. This unit applies them to a food processor.
Choose the legal form
| Form | Law and ORC cost | Think about |
|---|---|---|
| Sole proprietor (business name) | GH¢130; renewal GH¢70 a year; the owner is personally liable | Simplest; you and the business are one in law |
| Partnership | GH¢270; renewal GH¢100 a year; 2 to 20 partners; Form B; the agreement is stamped by the Lands Commission (Valuation Division); Act 152 | Write a partnership agreement: who puts in what, who decides, how to leave |
| Company limited by shares | GH¢585 plus 1% capital duty on stated capital as the page states it (check the rate); at least two directors and a secretary; a consent letter from an ICAG chartered accountant; beneficial-owner details | Limited liability; yearly return GH¢175; first return 18 months after incorporation |
| Company limited by guarantee | GH¢490; for NGOs, churches and social enterprises; no profit to members | Not for a business that shares profit |
| Cooperative | Not registered at the ORC; it gets an organisational TIN from the GRA. The Department of Co-operatives route was not verified | Needs written rules and members who work together; ask the Department |
Late yearly returns cost GH¢1,000 (one to four years late) or GH¢2,000 (five or more years). Most solo food makers start as a sole proprietor and move to a company when they hire many staff, sign big contracts or take investors (the author's advice).
Income tax by form. A resident whose business income is the only income and who is not VAT-registered can use the Modified Taxation Scheme: turnover up to GH¢20,000 pays fixed instalments, and GH¢20,001 to 750,000 pays 3% of turnover (or uses the Modified Cash Basis); payment is through *880# or the MTS app. Professionals, owners of several businesses or outlets, and partners are excluded. Companies pay 25% corporate income tax; manufacturers in regional capitals other than Accra and Tema pay 18.5%, which applies to Takoradi; manufacturers outside regional capitals pay 12.5%; non-traditional exporters pay 8%. Provisional tax is paid quarterly and the annual return is due within four months after year end. Whether your activity counts as manufacturing for the lower rate must be confirmed with the GRA.
Register step by step
| Step | Body | What and cost |
|---|---|---|
| 1 | ORC | Name search and registration (above). Choose your legal form first |
| 2 | GRA | The Ghana Card PIN is the individual TIN since 1 April 2021; a company gets a TIN after ORC registration |
| 3 | Assembly (STMA) | Register the business and get the Business Operating Permit through the STMA portal at tcc.stma.gov.gh. The 2025 schedule charges an STMA registration fee of GH¢100, 250 or 500 by size of rate, a 30% penalty for trading unregistered, and annual fees due by 31 March; for small-scale local ice-cream and yoghurt manufacturers it lists GH¢1,300 a year, but the table is hard to read and no 2026 schedule was found. Confirm your category |
| 4 | FDA | Facility licence, product registration and hygiene permit (below) |
| 5 | GSA | The Ghana Standards mark where it applies (below) |
| 6 | EPA | An environmental permit for food processing; see below |
| 7 | GNFS | Fire certificate; non-residential GH¢500 plus processing fees |
| 8 | SSNIT and GRA | Register as an employer if you hire (below) |
| 9 | Data Protection Commission | Check whether you must register if you keep customer lists |
| 10 | Medical screening | Food handlers are screened by the Assembly; STMA refused licences to vendors with conditions such as typhoid |
| 11 | GEPA | Only if you will export (Unit 7) |
The FDA in three parts.
- Facility licence for the place where you make, pack or store food. Every manufacturer needs an annual licence before it manufactures for sale. You send the application form, a letter to the Chief Executive, your business registration certificate, a medical certificate for each production worker (tuberculosis, hepatitis A, typhoid and other communicable diseases), a Site Master File for a new application, and the EPA schedule to the environmental permit where required (large and medium scale; possibly small and cottage). The FDA says the licence takes at most 30 working days once the requirements are met, and renewal should start at least a month before expiry. The fee is the inspection fee by scale: micro GH¢100, small GH¢200, medium GH¢300, large GH¢700 for a local food GMP inspection (2023 schedule).
- Product registration for each product and variant: certificate of analysis, label, samples and evidence for claims. The 2023 schedule lists locally made food at GH¢100 (micro), 200 (small), 300 (medium) and 500 (large) per annum, a pre-registration label evaluation at GH¢200 per product and variant, and a combined microbiology and food chemistry analysis at GH¢1,000 a sample. A law-firm guide says applications go through the G-FIRMS portal and take one to three months, and that supermarkets increasingly want your FDA number.
- Food Hygiene Permit for food service outlets and street vending points, valid one year and displayed. The FDA said full enforcement began on 1 February 2026. The 2023 schedule lists food service facility inspection as GH¢60 (micro), 120 (small), 140 (medium) and 600 (large), with some lines per annum and some per inspection. Renew on time: late renewal of an FDA licence or registration costs an administrative charge of 100% of the approved fee.
FDA fees: what changed since Level 2. Level 2 found two conflicting tables. The FDA's own fee schedule (L.I. 2481, 2023) has now been read and is the newest. It differs from the 2020 checklist of Level 2 (cottage GH¢150, small GH¢450, medium GH¢600, large GH¢900, each for three years) and from the 2020 licensing guideline, which used a 2019 instrument and listed inspection at GH¢50, 200, 300 and 600. Use the 2023 schedule for planning. Still not verified: whether a product registration is paid every year or lasts three years (the 2023 schedule says per annum; a 2026 law-firm guide says three years, Source: Mondaq Shito 2026); how the FDA decides micro, small, medium or large; and today's exact charges. Phone the FDA Western Regional office before you pay.
GSA mark: what changed since Level 2. Level 2 could not find the fee. The GSA's product certification brochure lists, at rates as of June 2019, no processing fee and a licence fee of GH¢300 per product for small companies, plus a testing fee that depends on the product. Large firms pay a processing fee of GH¢600–2,000, a licence fee of GH¢300–500 per product and an inspection fee of GH¢200–500. The licence lasts one year, and the GSA checks marked products at least once every six months. Applicants send a business registration copy, a quality plan, the label, evidence for any claim, and where the business is small, a letter from the government body that designates small businesses. Each food product standard needs a HACCP study. Not verified: whether a small kitchen making shito or juice counts as an "industrial process" under the mandatory rule, and today's fees. Do not print the GSA mark unless you hold the licence. Write to takoradi@gsa.gov.gh and ask.
EPA. The EPA announced on 8 January 2026 that operating without a valid environmental permit is an offence under the Environmental Protection Act 2025 (Act 1124) and the Environmental Assessment Regulations 2025 (L.I. 2504), and it named food processing, sachet and bottled water and beverages among the manufacturing activities it will inspect. Penalties named were administrative penalties, fines, closure or prosecution. Go to the nearest EPA office, and pay into the EPA's bank accounts or mobile money wallets, never in cash. The permit class and fee for a small food processor were not found. Ask the EPA.
VAT. From 1 January 2026 the Value Added Tax Act 2025 (Act 1151) applies. VAT is 15% plus NHIL 2.5% plus GETFund 2.5%, 20% in effect, and NHIL and GETFund can be claimed as input tax. Registration for goods is required at GH¢750,000 of taxable supplies in a year. For services the turnover threshold has been removed and registration is required within 30 days of starting a taxable activity. Registered businesses file and pay by the last working day of the following month and issue E-VAT invoices. Raw agricultural food produced in Ghana is listed as exempt, but how VAT treats processed foods such as shito was not verified. Ask the GRA or a tax adviser.
Withholding tax. The GRA lists rates of 3% on goods, 5% on works, 7.5% on services and, on rent, 8% residential and 15% non-residential, paid within 15 days after month end. Ask who must withhold in your case.
Premises and location
Make where it is safe and cheap; sell where people pass. For the plant, Codex says to avoid polluted areas, flood-prone ground and places pests or waste cannot be controlled. Add: safe water and a drain; power or room for solar; a room that can be cleaned; roads for your deliveries; access to farmers and markets; and an owner who will give a written lease for at least a year (the author's advice). Check with the Assembly before you pay rent. For selling points, use the Level 2 sites: schools, offices, lorry stations and markets, and the weekend STMA on-street market.
Score two sites
Score each site from 1 (bad) to 5 (good) and multiply by the weight. Water and drain (weight 3), power or solar space (3), flood and pest risk (3), nearness to raw materials (2), nearness to buyers (2), rent (2), access for all (1). Site A scores 5, 3, 4, 2, 5, 3, 2. Site B scores 4, 4, 3, 5, 3, 4, 4. Which is better, and what is the maximum score?
Start-up budget (Esi's Cold Kitchen, all example figures)
| Item | GH¢ (example) |
|---|---|
| Cooking, bottling and prep equipment: pots, burner, cylinders, tables, pulper, capper | 9,000 |
| Measuring and safety: scales, thermometers, pH meter, extinguisher, first aid, hand-wash station, PPE | 2,750 |
| Solar chest freezer system, 200 L class | 11,000 |
| Fit-out of the room: tiles, screens, drain repairs | 3,000 |
| Registration, tests and licences (itemised below) | 6,130 |
| First month of ingredients and packaging | 5,600 |
| Working cash | 3,000 |
| Total | 40,480 |
The 6,130 is: ORC business name 130; FDA product registration for two products 2 × 200 = 400 and one GMP inspection 200, assuming the FDA treats Esi as small scale; laboratory analysis 2 × 1,000 = 2,000; label evaluation 2 × 200 = 400; fire certificate 500; an STMA permit of 1,300 (a category assumption, Source: STMA Fee-Fixing 2025); medical screening for two people at 100 each; and a GS1 barcode placeholder of 1,000 because the fee was not found. Equipment and fit-out figures are examples; no price list was found.
Fund the start-up
Esi has GH¢24,000 in savings and expects GH¢4,000 from her susu group. (1) How much more does she need for the total above? (2) What share of the total is her own money? (3) A microfinance lender offers GH¢12,000 at a flat 2% a month for 12 months. What is the monthly repayment and the total repaid? (4) Name two other places to look for money.
Funding options
- Savings and susu groups. Government is linking savings groups to banks.
- Loans. Use only licensed lenders and ask for the APR in writing. The Bank of Ghana's policy rate was 14.00% and inflation 5.2% when its site was checked in October 2026; compare any offer with them.
- Ghana Enterprises Agency (GEA). GEA lists programmes including SME GO, Business-in-a-Box, SME High Growth and Kaizen, and has Business Advisory Centres in Takoradi, Shama, Effia-Kwesimintsim, Mpohor and Ahanta West. Its financial-support page was out of date, and a 2023 report said 270 MSMEs received more than GH¢35 million. Whether a round is open now was not verified.
- 2026 Budget programmes. The Budget named GH¢401 million for a Women's Development Bank, GH¢170 million for a National Apprenticeship Programme, GH¢160 million for Adwumawura and GH¢110 million for the 24-Hour Economy programme. Ask how a food processor applies.
- GIRSAL and Ghana EXIM. GIRSAL offers guarantees for agricultural loans through partner lenders, and Ghana EXIM has SME and export facilities with a Takoradi office.
- Assemblies' disability fund. It rose to 5% in 2026 and aims at skills training, assistive devices and start-up capital.
- Equipment finance. Pay-as-you-go plans for solar freezers use a small deposit and daily or weekly instalments.
Never pay a fee to "guarantee" a grant or a loan. Check the agency's own website or office.
Staff and apprentices
Contract and pay. The Labour Act 2003 (Act 651) requires a written contract for a job of six months or more (section 12) and a written statement of the main terms within two months (section 13). Workers have at least 15 working days of paid annual leave (section 20) and women 12 weeks of maternity leave (section 57). Casual workers must be paid at least the full minimum for each day worked (section 74), and section 17 sets notice rules. The 2026 national daily minimum wage is GH¢21.77, about GH¢587.79 for 27 days.
SSNIT and PAYE. The worker pays 5.5% and the employer 13% of basic salary, 18.5% in all. The employer remits within 14 days after month end. Of the 18.5%, 13.5% goes to SSNIT (Tier 1), of which SSNIT passes 2.5% on to the health insurance authority, and 5% goes to a private Tier 2 trustee. Late payment costs 3% a month. Register workers when you hire them. The monthly PAYE bands are: the first GH¢588 at 0%, the next 80 at 5%, the next 100 at 10%, the next 2,900 at 17.5%, the next 16,000 at 25%, the next 30,332 at 30%, and above 50,000 at 35%. Take off the worker's SSNIT first. PAYE is paid by the 15th of the next month, and casual workers pay 5%. The GRA page says the annual table took effect on 1 September 2026, so confirm.
| Monthly pay | Worker's SSNIT 5.5% | Taxable pay | PAYE | Worker takes home | Employer's SSNIT 13% | Cost to employer |
|---|---|---|---|---|---|---|
| GH¢600 | 33.00 | 567.00 | 0.00 | 567.00 | 78.00 | 678.00 |
| GH¢1,500 | 82.50 | 1,417.50 | 127.66 | 1,289.84 | 195.00 | 1,695.00 |
At GH¢1,500, the PAYE is 80 × 5% = 4.00, plus 100 × 10% = 10.00, plus (1,417.50 − 768) × 17.5% = 113.66, a total of 127.66 (author's arithmetic from the bands above).
Food staff. Each production worker needs a medical certificate before starting, trained in hygiene (Unit 1), with a written job description. Anyone with a stomach upset, cough or skin infection stays off food handling (Level 1 rule). Put apprentices on a written agreement that sets hours, pay or stipend, what they will learn and who supervises them (the author's advice). The Budget funds a National Apprenticeship Programme but its rules were not read. This is not legal advice.
Insurance, marketing and safety
Ghana law is reported to require business premises to be insured against fire and other risks, but the section numbers were not verified. Use only insurers licensed by the National Insurance Commission and check them at nic.gov.gh. Which covers are compulsory was not verified. Ask insurers for written quotes for premises, stock and equipment, and ask whether product liability cover exists for food (the author's advice; availability not verified).
Market yourself. Use a WhatsApp Business catalogue, a free Google Business Profile, clear signage, photos of a clean kitchen, sample jars for buyers, and referrals. Put your permit and registration numbers on the label only when you hold them. Customers choose neat vendors.
Accessibility
The Persons with Disability Act 2006 (Act 715) is reported to give employers a tax rebate for hiring disabled people. An audit found only 14% of the public places checked had been retrofitted, and STMA gave deep freezers and ice chests to persons with disabilities in 2025. Practical changes (the author's suggestions): a seated work bench at 71–86 cm with knee space, talking or large-display thermometers and scales, colour-coded boards and picture checklists, a ramp or step-free entry, and a buddy for hot work.
The one-page business plan
- Who I am and my legal form
- Product and customer: range, prices, three buyers I have spoken to
- Rules: FDA, GSA, EPA, STMA, GNFS and tax registrations done and still to do
- Plant: site, layout, equipment, cold chain
- Food safety: the CCPs, the laboratory plan and the recall plan
- Money: start-up budget, funding, 12-month cash forecast (Unit 7)
- People: staff, training and pay
- Risks and how I reduce them
Register and pitch
- Complete a registration checklist for your own business, with the body, document, cost and date for each step. Mark which fees are verified, uncertain or example.
- Build your start-up budget and a funding plan with your own money, a loan and one other source.
- Do a payroll sum for a helper at the minimum wage and at GH¢1,500.
- Write the one-page plan and pitch it in two minutes to a classmate acting as a lender.
Three visits
Visit or phone the ORC (or its portal), the STMA revenue office and the FDA or GSA. Write down one thing you did not know and the date.
Unit 6 · Bookkeeping and accounts for a food processor
Food that sells but is not recorded is a hobby. A set of books turns it into a business you can borrow against, price correctly and defend to a tax officer.
Competency standard
| Learning outcome | Performance criteria — the trainee… |
|---|---|
| 6.1 Keep daily records | keeps a cash book, receipts, invoices, petty cash, stock cards and batch cost sheets |
| 6.2 Use double entry | posts simple transactions to a ledger and checks a trial balance |
| 6.3 Produce statements | draws up a monthly profit and loss, cash book and balance sheet that agree |
| 6.4 Cost, price and test | works out full cost per unit, sets prices by margin, finds break-even and depreciation |
| 6.5 Control and close | manages stock, debtors, creditors and petty cash, reconciles cash and MoMo and closes the month |
| 6.6 Keep tax records | keeps the records for Modified Taxation or VAT, SSNIT and PAYE and the filing calendar |
Range. One month of sample records and one month of the trainee's own or practice records. Evidence. Cash book; ledger and trial balance; stock sheet; debtors list; profit and loss; balance sheet; reconciliation; costing sheet.
See the hub's Money Skills Level 2 for the basics of cash books and profit and loss. This unit applies them to a food processor and goes further. Every figure for Esi's Cold Kitchen is an example.
The daily set of records
- Cash book: every sale and cost the same day, cash and MoMo separately
- Receipts and invoices: numbered, a copy kept; each shows date, items, lot code, amount and seller
- Petty cash: a small fixed float, a voucher for each use, topped up to the float
- Stock records: ingredients, packaging, finished goods; bought, used, sold, left, with lot codes and dates
- Batch cost sheet: the direct cost of each batch and the cost per unit
- Debtors and creditors lists: who owes you and whom you owe, with the invoice date
- Waste and samples log: spoiled, broken, rejected, sampled and retained units, with the lot code
- Owner and business money kept apart: pay yourself a fixed wage
An income statement (profit and loss) shows sales minus the cost of goods sold, giving gross profit, then other costs, giving net profit. A balance sheet shows what the business owns and owes: assets equal liabilities plus equity. Working capital is current assets minus current liabilities.
Double entry in ten minutes
Every transaction has two sides. The accounting equation is assets = liabilities + equity. A debit increases an asset or an expense. A credit increases a liability, the owner's capital or income. For every entry, the debits equal the credits, so a trial balance, which lists every account balance, should have equal debit and credit totals; but that is only a partial check, because some errors do not upset the balance.
A tiny set of books (example). Esi starts a week with cash GH¢2,000 and capital GH¢2,000.
| No. | Transaction | Debit | Credit | GH¢ |
|---|---|---|---|---|
| 1 | Buys oil and spices for cash | Stock | Cash | 400 |
| 2 | Buys jars on credit from a supplier | Stock | Creditors | 600 |
| 3 | Sells 60 jars to a supermarket on credit | Debtors | Sales | 1,500 |
| 4 | Sells 50 jars for cash | Cash | Sales | 1,500 |
| 5 | Supermarket pays part of its bill | Cash | Debtors | 1,000 |
| 6 | Pays the jar supplier part of the debt | Creditors | Cash | 300 |
| 7 | Pays the helper | Wages | Cash | 567 |
| Trial balance | Debit | Credit |
|---|---|---|
| Cash (2,000 − 400 + 1,500 + 1,000 − 300 − 567) | 3,233 | |
| Debtors (1,500 − 1,000) | 500 | |
| Stock (400 + 600) | 1,000 | |
| Wages | 567 | |
| Creditors (600 − 300) | 300 | |
| Sales (1,500 + 1,500) | 3,000 | |
| Capital | 2,000 | |
| Totals | 5,300 | 5,300 |
The sides match. That is the trial-style check: if they differ, look for an entry recorded once, in the wrong column or with digits swapped.
Find the error
A later trial balance shows debits of GH¢5,300 and credits of GH¢5,309. (1) What is the difference? (2) What kind of slip often gives a difference divisible by 9? (3) Which entry above could it be? (4) Does an equal trial balance prove the books are right?
A month for Esi's Cold Kitchen (example)
Starting position (day 1). Esi paid GH¢6,130 for registrations, tests and licences before opening (written off). She holds cash and MoMo of GH¢8,600 (working cash plus the first month's inputs), equipment and fit-out costing GH¢25,750, and a microfinance loan of GH¢12,000.
| Opening balance sheet | GH¢ | GH¢ | |
|---|---|---|---|
| Cash and MoMo | 8,600 | Loan | 12,000 |
| Equipment and fit-out (cost) | 25,750 | Owner's capital put in | 28,480 |
| Less start-up costs written off | (6,130) | ||
| Total assets | 34,350 | Total liabilities and equity | 34,350 |
Production and sales.
| Shito, 250 g jar | Sobolo, 500 ml bottle | |
|---|---|---|
| Batches made | 6 × 40 jars = 240 | 5 × 60 bottles = 300 |
| Direct cost of a batch | GH¢610: oil 180, fish powder 120, onion and spices 60, gas 30, jars, lids and labels 200, transport 20 | GH¢390: hibiscus, ginger, pineapple and cloves 130, sugar 60, gas 25, bottles, caps and labels 150, transport 25 |
| Direct cost per unit | 610 ÷ 40 = 15.25 | 390 ÷ 60 = 6.50 |
| Sold | 120 to shops at 25 (60 to a supermarket on credit); 100 direct at 30 = 220 | 150 to a school at 10 (80 on credit); 130 retail at 14 = 280 |
| Left in stock | 20 jars × 15.25 = 305 | 20 bottles × 6.50 = 130 |
Sales are 120 × 25 + 100 × 30 + 150 × 10 + 130 × 14 = 3,000 + 3,000 + 1,500 + 1,820 = 9,320. Credit sales not yet paid: supermarket 60 × 25 = 1,500 and school 80 × 10 = 800, total 2,300. The jar supplier is owed GH¢600.
| Profit and loss for the month | GH¢ |
|---|---|
| Sales | 9,320.00 |
| Direct cost of the 11 batches made (6 × 610 + 5 × 390) | 5,610.00 |
| Less closing stock (305 + 130) | (435.00) |
| Cost of goods sold | 5,175.00 |
| Gross profit (44.5% of sales) | 4,145.00 |
| Rent | 400.00 |
| Helper's pay | 600.00 |
| SSNIT, employer's 13% of 600 | 78.00 |
| Electricity | 220.00 |
| Delivery transport | 250.00 |
| Phone and data | 80.00 |
| Yearly fees and tests set aside (3,600 ÷ 12) | 300.00 |
| Depreciation (below) | 350.00 |
| Loan interest | 240.00 |
| Total other costs | 2,518.00 |
| Profit before tax | 1,627.00 |
| Modified Taxation, 3% of sales | 279.60 |
| Profit after tax | 1,347.40 |
| Owner's wage taken | 900.00 |
| Profit kept in the business | 447.40 |
The helper's pay is above the 2026 minimum wage of GH¢21.77 a day, about GH¢587.79 for 27 days. The employer's SSNIT is 13%. The 3% tax is the Modified Taxation Scheme rate for turnover of GH¢20,001 to 750,000. The yearly set-aside of GH¢3,600 is the author's example of FDA registration, GMP inspection, laboratory retest, STMA permit, fire certificate and screening.
| Cash book for the month | GH¢ |
|---|---|
| Opening cash and MoMo | 8,600 |
| Cash in: sales received (9,320 − 2,300 on credit) | 7,020 |
| Cash out: ingredients and packaging paid (5,610 − 600 owed) | 5,010 |
| Cash out: rent 400, helper's pay after worker's SSNIT 567, electricity 220, transport 250, phone 80 | 1,517 |
| Cash out: loan instalment (principal 1,000 + interest 240) | 1,240 |
| Cash out: owner's wage | 900 |
| Closing cash and MoMo (8,600 + 7,020 − 5,010 − 1,517 − 1,240 − 900) | 6,953 |
| Balance sheet at month end | GH¢ | GH¢ | |
|---|---|---|---|
| Cash and MoMo | 6,953.00 | Creditor: jar supplier | 600.00 |
| Debtors: supermarket 1,500 and school 800 | 2,300.00 | SSNIT owed (33 + 78) | 111.00 |
| Stock of finished goods | 435.00 | Yearly fees set aside, owed later | 300.00 |
| Equipment and fit-out 25,750 less 350 | 25,400.00 | Modified Taxation owed | 279.60 |
| Loan (12,000 − 1,000) | 11,000.00 | ||
| Owner's equity: 22,350 + 447.40 | 22,797.40 | ||
| Total assets | 35,088.00 | Total liabilities and equity | 35,088.00 |
The two sides match: a successful trial-style check.
Why did profit kept (GH¢447.40) come with a fall in cash (from 8,600 to 6,953)? Profit is not cash. Start with the profit kept, 447.40. Add back depreciation 350, which costs no cash. Add the costs not yet paid or set aside: SSNIT 111, fees 300, tax 279.60 and the jar supplier 600. Take away cash that is tied up: debtors 2,300 and stock 435. Take away the loan principal repaid, 1,000, which is not a cost but still leaves the bank. The result: 447.40 + 350 + 111 + 300 + 279.60 + 600 − 2,300 − 435 − 1,000 = −1,647.00, which is exactly 6,953 − 8,600.
How much of the 6,953 is really free? Money already owed: 600 + 111 + 300 + 279.60 = 1,290.60. Free cash is 6,953 − 1,290.60 = GH¢5,662.40.
Food-specific entries
- Wastage. Spoiled, broken, rejected and expired units are a cost: write the lot code and the cost. Expired stock is written off at cost.
- Samples. Units given as tasting samples or kept as retained samples are a cost of the batch (Unit 3).
- Yield variance. When a batch gives fewer units than normal, the cost per unit rises (Unit 3). Record it.
- Packaging. Count jars, bottles and caps as stock. Record broken packaging.
- Batch cost. Keep a cost sheet for every batch, and attach it to the batch record.
Full cost and pricing
Overhead rate. Overheads (other costs plus the owner's wage) are 2,518 + 900 = 3,418. Share them out in proportion to direct cost: 3,418 ÷ 5,610 = 60.9% of direct cost. Full cost per jar = 15.25 × 1.609 = GH¢24.54; full cost per bottle = 6.50 × 1.609 = GH¢10.46 (author's method; other ways of sharing exist).
Margin or mark-up? Margin is profit as a share of the price. Mark-up is profit as a share of cost. At a direct cost of GH¢15.25 and a shop price of GH¢25, the margin is 9.75 ÷ 25 = 39.0% and the mark-up is 9.75 ÷ 15.25 = 63.9% (author's arithmetic).
Price from the margin: price = cost ÷ (1 − margin). A shop that keeps 25% of its shelf price leaves you 75%.
Price it right
(1) At the full costs above, what is the margin on full cost for the shito sold to shops at GH¢25 and directly at GH¢30? (2) What price gives a 20% margin on the full cost of a jar, and of a bottle? (3) The school pays GH¢10 a bottle. Is the sale a loss? (4) What shelf price in a supermarket that keeps 25% would give you the price in (2) for a jar? (5) For a direct cost of GH¢15.25, what price gives a 40% margin, and what price gives a 40% mark-up?
Break-even. Break-even units = fixed costs ÷ (average price − variable cost per unit). Esi's fixed costs including her wage are 3,418. She sold 500 units for 9,320, an average of 18.64. Cost of goods sold per unit was 5,175 ÷ 500 = 10.35. The 3% tax takes 0.03 × 18.64 = 0.56. So each unit leaves 18.64 − 0.56 − 10.35 = 7.73. Break-even = 3,418 ÷ 7.73 = about 443 units a month. She sold 500, so her margin of safety is only (500 − 443) ÷ 500 = 11%.
What if rent rises?
Rent rises by GH¢100 a month. Using the figures above, what is the new fixed cost and the new break-even in units, rounded up?
Depreciation
Equipment loses value as it is used. Straight-line depreciation spreads the cost evenly over its life: (cost − salvage value) ÷ years of use. Esi's monthly GH¢350 is: kitchen and measuring kit (9,000 + 2,750 = 11,750) ÷ 5 years = 2,350 a year; fit-out 3,000 ÷ 5 = 600; solar freezer (11,000 − 1,000 salvage) ÷ 8 = 1,250. Total 4,200 a year, 350 a month.
A new pulper
Esi buys a pulper for GH¢4,500, expects to use it for 5 years and to sell it for GH¢500. (1) Yearly and monthly depreciation? (2) Book value after 2 years? (3) She sells it after 2 years for GH¢3,000. Is that a gain or a loss, and how much?
Stock, debtors, creditors and petty cash
Stock. Count weekly: expected = opening + made − sold − samples − waste. If the count is lower, units are missing. Use first-expire, first-out.
Stock count
Opening stock 25 jars; 240 made; 220 sold; 12 retained as samples; 3 broken. The count finds 28. (1) Expected? (2) How many missing, and at GH¢15.25 each what is the loss?
Debtors. Age them by days owed. Chase the oldest first and stop new credit to a late payer.
Age the debts
Supermarket A owes GH¢1,500 for 12 days; Shop B GH¢450 for 8 days; the school GH¢800 for 40 days; a hotel GH¢600 for 75 days. Group them into 0–30, 31–60 and over 60 days. Which first?
Petty cash. A float of GH¢200. Vouchers: transport 35, cleaning cloths 45, stationery 20. The tin holds GH¢95. (1) How much should be in the tin? (2) What is the shortage? (3) How much is needed to restore the float?
Reconcile MoMo and bank. Compare your cash book with the statement and explain every difference.
Reconcile MoMo
The cash book says the MoMo balance is GH¢2,310. The statement says GH¢2,565. A customer paid GH¢200 that is not in the book. The network charged GH¢15 you did not record. A GH¢70 supplier payment was recorded twice in the book. Show that the book agrees with the statement after correction.
Tax, SSNIT and filing records
Keep records that prove your tax route. At sales of 9,320 a month, annual sales are about 9,320 × 12 = GH¢111,840, and 3% is GH¢3,355.20 (example). VAT registration for goods starts at GH¢750,000 a year, which would be 62,500 a month. Employers pay SSNIT within 14 days after month end.
Filing calendar.
| When | What |
|---|---|
| By the 14th each month | SSNIT contributions for the month before |
| By the 15th each month | PAYE and withholding tax |
| Last working day of the month | VAT return and payment, if registered |
| End of March, June, September, December | Provisional income tax for companies |
| 31 March | STMA business operating permit fees |
| Within four months after the year end | Annual income tax return |
| Every year | ORC annual return (company) or renewal (business name) |
| Every year | FDA licence, product registration and hygiene permit renewals (Unit 5) |
Keep records for at least 6 years from the end of the year of assessment or VAT period, longer if a dispute is open. Food records go further: keep batch and distribution records for longer than the shelf life. Software. A spreadsheet is enough to start. Zoho Books lists a free plan for one user and an accountant, up to 1,000 invoices a year, for revenue under US$50,000, and Wave lists a free starter plan. Check each is open to Ghana and what the terms are before you rely on them. Companies that prepare full statements may follow the IFRS for SMEs standard; its 2025 edition applies from 1 January 2027. Ask an accountant what you need. This is not tax advice.
Month-end routine
- Count the cash box. Check MoMo and bank balances against statements and reconcile.
- Add the cash book and carry the closing cash forward.
- Count stock by lot; record waste, samples and expired units.
- List debtors and creditors; chase the oldest.
- Draw up the profit and loss and the balance sheet; check the two sides match.
- Move your wage; set aside the monthly share of yearly fees and the tax.
- Update batch cost sheets and review prices and margins.
- File receipts, invoices, SSNIT and tax papers in one folder; back up the spreadsheet.
Close a month
- Use the sample month: rebuild the cash book, profit and loss and balance sheet; check the two sides match.
- Do the same for one month of your own or practice records.
- Reconcile a MoMo statement, count some stock by lot and age a debtors list.
- Work out the full cost and the margin for your own product; find your break-even.
Keep a week
Keep a cash book, a stock sheet and a waste log for a week of real or practice sales. Bring them.
Unit 7 · Grow, sustain and present your plan
Starting is one skill. Staying alive, passing audits, winning bigger buyers and growing is another.
Competency standard
| Learning outcome | Performance criteria — the trainee… |
|---|---|
| 7.1 Run a quality system | writes procedures, audits itself, fixes causes and prepares for buyer audits |
| 7.2 Serve customers and price | sets price tiers and discount rules and handles complaints |
| 7.3 Scale, partner and sell big | plans growth, contracts with supermarkets, schools and hotels, tenders and the first export |
| 7.4 Prepare for loans and succession | keeps records a lender trusts, names a successor and keeps to ethics |
| 7.5 Forecast and present | presents a one-page plan with a 12-month cash forecast to a panel |
Range. The trainee's own business plan. Evidence. Quality procedures; price sheet; contract checklist; export checklist; business plan and forecast; panel score sheet.
A simple quality system
A quality system is your written way of making every batch the same and fixing what goes wrong. For a small plant:
- A one-page procedure for each key job: receiving, batching, hot-fill, cleaning, packing, cold storage, dispatch, recall
- Document control: each procedure has a version and date; old copies are removed from the work area
- Supplier approval: a list of approved suppliers, what you check on delivery and what you do about a bad delivery
- A monthly internal audit by someone who does not run the area (Unit 1), with a corrective action for each finding
- A corrective and preventive action (CAPA) log: what failed, the root cause, the fix, who, when, and the check that it worked
- A complaint book and a recall plan (Unit 3)
- A management review every quarter: audit results, complaints, test results, calibration, training, changes
Three kinds of audit. An internal audit is yours. A second-party audit is by a buyer, such as a hotel or a supermarket, who wants to see your plant. A third-party audit is by an independent body for a certificate, such as the GSA or an FSSC 22000 certification body (Unit 1). The FDA also inspects; its Progressive Licensing Scheme scores a facility against GMP and awards a pink, yellow or green certificate, with the aim of licensing more small processors without dropping the basic rules. Ask the FDA what each colour allows.
Prepare for a buyer's visit.
| The auditor asks | You show |
|---|---|
| Are you registered and licensed? | ORC, FDA licence, product registration, hygiene permit, STMA permit |
| How do you control food safety? | The flow diagram, hazard table, CCP records of the last month |
| Can you trace a jar? | A mock recall report and a lot code on the invoice |
| Is your equipment checked? | Calibration log, cleaning schedule, maintenance log |
| Are staff trained and healthy? | Training matrix, medical certificates |
| Is the plant clean and pest-free? | The plant, the cleaning and pest sheets |
| What do you do when something fails? | CAPA log and complaint book |
How serious is a finding? The author's grading: critical if food could be unsafe (a CCP not monitored, no handwashing, mould in stock), major if a procedure is not followed or a record is missing, minor for a small slip. A critical finding stops production or sales until it is fixed.
Customer care and pricing strategy
Answer messages quickly, replace damaged goods, and ask each buyer what they want next. Compete on safe food, a registered label, steady taste and reliable delivery, not only on price. Customers choose neat vendors, and a clean stand and a clear price list matter. Use price tiers (retail, wholesale, institution) and a written discount rule. Review costs every quarter, since inputs can jump in price: ginger prices more than doubled in a year to June 2026.
The 10% discount
A hotel asks for 10% off the GH¢25 wholesale jar and orders 100 jars a month. The direct cost is GH¢15.25. (1) Profit per jar now, and after the discount? (2) How many jars must it order to give you the same profit? (3) Would you agree, and what would you ask in return?
Scale, partners and big buyers
Grow from within. Add one product or one new buyer at a time. Re-check capacity, cash and the HACCP plan at each step (Unit 4). Agree prices and quality in writing with suppliers; the School Feeding guidelines say caterers should buy 80% of food from smallholder farmers, though the page that states it was not checked.
A buyer contract checklist. A contract or a signed order states: the product and specification (weight, shelf life at delivery, lot code on the pack); price and when it can change; minimum and maximum order; delivery days and cold-chain rules; payment days and what happens if payment is late; what happens to stock that fails or nears its date; who pays for a recall; label and barcode duties; how long the contract lasts and how either side ends it. Have a lawyer read big contracts.
Supermarkets. The terms of Ghana's chains, such as listing fees and payment days, were not found; one general retail article says there is no published formula for listing fees. Ask the buying office for its supplier pack in writing. A law-firm guide says supermarkets increasingly want your FDA number, and a barcode and a clear label are usual asks (Unit 3).
Credit or cash?
A supermarket will buy 100 jars at GH¢25 and pay after 60 days. A shop will pay cash on delivery, at GH¢23. The direct cost is GH¢15.25 a jar, and Esi's money costs 2% a month (examples). (1) Cash tied up in the 100 jars? (2) The finance cost per jar over 60 days? (3) Profit per jar from each buyer? (4) What if the supermarket pays after 120 days? (5) What other risks does the supermarket order carry?
Schools. A school may buy drinks and snacks for the canteen. Ask the head teacher what hygiene proof they want. Children are a vulnerable group, so say so in your HACCP plan. If you supply a school-feeding caterer, remember that the programme paid GH¢2 per child per feeding day, with 74 cooking days in the first term of 2025/26. Payment problems have been reported: a survey found more than 30% of caterers reporting no payment in the past year, and the Ministry said in September 2026 that it had cleared the arrears of 2024 and paid the first two terms of 2025/26. A caterer who is paid late may pay you late, so ask when you will be paid and keep your credit small.
Hotels and restaurants. They want steady supply, steady taste, clean cold delivery and papers: your FDA registration, hygiene permit and records. Agree a weekly order day, a delivery window, a monthly invoice and payment days in writing (the author's advice; their terms were not found).
Public tenders. Suppliers to government must be registered with the Public Procurement Authority. Tenders are advertised on the GHANEPS e-procurement portal. One 2026 guide reports a registration fee of GH¢500 and a renewal of GH¢300, while a 2018 announcement said GH¢300, so confirm with the PPA. Tender security rules were not verified.
Partnerships. Farmers' groups for raw material, a hub or institution for shared cold space, a bigger processor for co-packing, and a distributor for far markets. Write the roles, prices and quality rules down.
Your first export
Exporting is a project, not a leap. Many details below were taken from guidelines and summaries; check each with the FDA, GEPA and your buyer.
| Step | What | Source |
|---|---|---|
| 1 Business | Only businesses registered with the Registrar General may export prepackaged foods | FDA Food Export Guideline |
| 2 Product | Prepackaged food to be exported must first be registered with the FDA | FDA Food Export Guideline |
| 3 Label | Export food must comply with GS 46:2004, labelling of pre-packaged foods | FDA Food Export Guideline |
| 4 FDA export permit | Apply in writing to the Chief Executive with batch numbers, quantities per batch, pack sizes and total quantity; secure an electronic permit through eMDA giving the full product name with brand, the full FDA registration number and an authorised person, the HS code, units, addresses and contacts of exporter and importer, and "For Export" as the purpose | FDA Food Export Guideline |
| 5 Inspection | The FDA inspects the consignment before clearance; the permit is shown to Customs once; non-compliant consignments are refused; unwholesome ones are quarantined and destroyed under FDA supervision, with a fee; you remain responsible for a consignment found non-compliant after clearance | FDA Food Export Guideline |
| 6 GEPA | Register as an exporter with GEPA: form plus business certificate and TIN; inspection by the permit-issuing agency; renewal yearly; a consignment certificate for each shipment | GEPA Registration |
| 7 Other certificates | Older sources list a GSA certificate for manufactured goods and a phytosanitary certificate for plant-based products; these lists were old | GEPA Registration |
The export guideline cites an earlier fee instrument (L.I. 2386 of 2019), and the 2023 fee schedule lists an export permit line at GH¢200 whose heading was unclear; ask the FDA for the current fee. A 2025 export guide for food and fast-moving consumer goods describes the same journey.
Your buyer's country has its own rules. For the United States, food facilities that make, process, pack or hold food for consumption there must register with the US FDA, registration is renewed every second year, and imported food needs advance notice of shipments. Other sources add that a foreign facility needs a US agent and that the US importer has duties; confirm with the buyer. For the European Union, Ireland's food safety authority says imported food of plant origin must meet EU food law and the EU hygiene rules (Regulation (EC) No 852/2004). The importer must be registered, every consignment needs a customs declaration and commercial papers, and officers may check documents, identity and the goods themselves, with laboratory tests. Some foods face extra checks at a border post because of risks such as mycotoxins or pesticide residues. Shito contains fish, so ask the importer whether the stricter rules for food of animal origin apply. Rules for African neighbours under AfCFTA were not verified. Ask your buyer's importer for the full list of documents, labels and tests, in writing, before you make the first batch.
The export checklist
A buyer in another African country wants 500 jars of shito. List the registrations, permits, label changes, tests and documents you would need to prepare, who issues each, and which you do not yet know.
Records for loans, succession and ethics
A lender wants: your registration papers and licences, 12 months of cash book, a profit and loss, a balance sheet, bank or MoMo statements, a cash-flow forecast and a clear use for the money (see Money Skills Level 2). Name a successor who knows the recipes, the supplier list, the lot-code scheme, the passwords and the customer list, and keep the master recipes and the HACCP file in a safe place with a copy elsewhere.
Ethics. Never print a registration number you do not hold. Never put a health or "no preservatives" claim on a label without evidence, because the FDA asks for it. Never sell a rejected batch or change a date. Report a recall at once. Pay staff on time and obey the Labour Act. Do not buy food from a supplier you suspect of using banned dyes or unsafe materials.
Your 12-month cash-flow forecast (example)
A cash forecast has opening cash, money in, money out and closing cash for each month. Esi's plan starts from the free cash at the end of the sample month in Unit 6, GH¢5,662, and her debtors of GH¢2,300 are collected in the first month. Her assumptions (examples):
- Sales rise with a new supermarket order and a school, peak in December and dip a little in the rainy months (the author's assumption; ask your own customers about slow months).
- Cash in: 75% of a month's sales in that month; 25% a month later.
- Inputs and packaging cost 60% of sales (5,610 ÷ 9,320 in Unit 6).
- Fixed cash costs: rent 400, helper's pay 600, employer's SSNIT 78, electricity 220, transport 250, phone 80 and fees set aside 300: GH¢1,928 a month.
- Modified Taxation: 3% of sales, put aside each month.
- Loan: GH¢1,240 a month for the 11 months left; then none.
- Owner's wage: GH¢900 a month.
| Month | Sales | Opening cash | Cash in | Cash out | Net | Closing cash |
|---|---|---|---|---|---|---|
| Oct | 10,000 | 5,662 | 9,800 | 10,368 | −568 | 5,094 |
| Nov | 11,000 | 5,094 | 10,750 | 10,998 | −248 | 4,846 |
| Dec | 15,000 | 4,846 | 14,000 | 13,518 | 482 | 5,328 |
| Jan | 10,500 | 5,328 | 11,625 | 10,683 | 942 | 6,270 |
| Feb | 11,000 | 6,270 | 10,875 | 10,998 | −123 | 6,147 |
| Mar | 12,000 | 6,147 | 11,750 | 11,628 | 122 | 6,269 |
| Apr | 12,500 | 6,269 | 12,375 | 11,943 | 432 | 6,701 |
| May | 12,500 | 6,701 | 12,500 | 11,943 | 557 | 7,258 |
| Jun | 11,500 | 7,258 | 11,750 | 11,313 | 437 | 7,695 |
| Jul | 11,000 | 7,695 | 11,125 | 10,998 | 127 | 7,822 |
| Aug | 12,000 | 7,822 | 11,750 | 11,628 | 122 | 7,944 |
| Sep | 13,500 | 7,944 | 13,125 | 11,333 | 1,792 | 9,736 |
Check each row: opening + cash in − cash out = closing. Cash is lowest in November (4,846), before the December peak. With the loan running, Esi needs about GH¢11,000 of sales a month just to stand still in cash: (1,928 + 1,240 + 900) ÷ (1 − 0.60 − 0.03) = 4,068 ÷ 0.37 = GH¢10,995. After the loan ends the figure falls to 2,828 ÷ 0.37 = GH¢7,643. That is why the loan and the owner's wage must be planned with the sales.
A new pulper in December
In December Esi buys a pulper for GH¢6,000 cash. Using the table, what happens to closing cash from December to September? What would you advise?
Stress test: a late payer
The supermarket pays late. GH¢2,500 of the cash that the table shows arriving in November arrives in December instead. What happens to the closing cash for November and December, and what do you do about it?
Capstone: present to a panel
You present a one-page business plan (Unit 5) with your 12-month cash forecast, price list, registration checklist, HACCP summary and quality plan, in 8 minutes, then answer questions for 7.
| Criterion | Marks |
|---|---|
| Product, customer and prices make sense | 10 |
| Food safety system: flow diagram, CCPs with limits, laboratory plan, recall plan | 20 |
| Registration and rules complete and honest, with uncertain fees marked | 15 |
| Plant, equipment and cold chain | 10 |
| Start-up budget and funding add up | 10 |
| 12-month cash forecast correct; slowest month named | 20 |
| Quality system, buyers, growth or export plan | 5 |
| Clear delivery and answers to questions | 10 |
| Total | 100 |
Present your plan
- Build your own 12-month forecast with a slow month and a busy month; find the lowest cash month and the sales needed to break even in cash.
- Add one stress test (a late payer, a power cut or a price rise) and show what you would do.
- Write the one-page plan and rehearse the 8-minute talk.
- Present to the panel and answer questions.
Ask a buyer
Ask three possible buyers (a shop, a school or office, a hotel or caterer) what would make them buy from you every week, and when they pay. Add their answers to your plan.
Glossary
| Term | Meaning |
|---|---|
| Accelerated shelf-life test | Storing food hotter than normal so spoilage runs faster, then predicting normal shelf life |
| Batch record | A written record of everything about one batch |
| Calibration | Checking a measuring tool against a known value |
| CAPA | Corrective and preventive action: a fix that removes the cause of a fault and stops it coming back |
| CCP | Critical control point: a step where control is essential to make food safe |
| Certificate of analysis | A laboratory paper showing a product's test results |
| Critical limit | The measurable number that must be met at a CCP |
| Debtor / creditor | Someone who owes you / someone you owe |
| Depreciation | Spreading the cost of equipment over the years of use |
| FEFO | First-expire, first-out: sell the oldest dated stock first |
| FSSC 22000 | A food safety certification scheme built on ISO 22000 |
| GTIN | Global Trade Item Number: the number a barcode carries |
| HACCP | A way of finding and controlling the steps that can make food unsafe |
| ISO 22000 | An international standard for food safety management systems |
| Lot code | A code on each pack that links it to its batch record |
| Margin / mark-up | Profit as a share of price / of cost |
| OPRP | Operational prerequisite programme: a control that is not a CCP but has action criteria |
| PRP | Prerequisite programme: basic hygiene and control procedures |
| Q10 | The factor by which a rate grows for every 10 °C rise |
| Recall | Removing a marketed product that breaks the rules, under the FDA guideline |
| Traceability | Being able to follow a product one step back to suppliers and one step forward to customers |
| Validation | Evidence that the plan and its limits work |
| Verification | Checks, beyond monitoring, that you are following the plan |
| Water activity | How much free water in food is available for germs |
| Yield | Finished product as a share of the input weight |
Logbook
Copy these pages into an exercise book. Your logbook is part of your assessment evidence.
- Unit 1: flow diagram; hazard table; PRP procedures; calibration log; training matrix; internal audit
- Unit 2: product brief; trial sheets; taste-test counts; costing; shelf-life sheet; laboratory enquiry; packaging comparison
- Unit 3: batch records; run charts; mock recall report; complaint file; label; barcode sums
- Unit 4: equipment quotes; scale-up sums; layout drawing; solar sizing; cold-chain plan and logs; maintenance plan
- Unit 5: registration checklist; start-up budget; funding plan; payroll sum; one-page plan
- Unit 6: cash book; ledger and trial balance; profit and loss; balance sheet; reconciliation; stock, debtors and petty cash records; costing sheet
- Unit 7: quality procedures; price sheet; contract and export checklists; 12-month forecast; panel score sheet
- Every homework, dated
Self-check quiz
- What is the difference between validation and verification in HACCP?
- Name three prerequisite programmes a food plant needs in writing.
- What is FSSC 22000 built on, and when is it worth the cost?
- What does a Q10 of 2 mean, and why must real-time data back the date?
- Why can accelerated testing not replace real-time testing for chilled foods?
- What are the three links that make a traceability chain?
- Under the FDA recall guideline, how fast must you start and stop the sale of a Class I product, and how far must the recall reach?
- How do you calculate the check digit of a 13-digit barcode number?
- A freezer uses 0.9 kWh a day, with 4.5 peak sun hours and a loss factor of 0.8. What panel power is needed?
- Which is profit as a share of the price, margin or mark-up?
- Why can a business be profitable and still run out of cash?
- What must you have before you can export prepackaged food from Ghana, and what permit do you apply for?
Further reading and sources
Best next reads: the FDA Ghana guidelines for licensing food manufacturing facilities and for product recall; the FDA fee schedule (L.I. 2481); the GSA product certification scheme brochure; Codex General Principles of Food Hygiene with the HACCP annex; FAO and WHO guidance for HACCP in small businesses; GS1 Ghana; Money Skills Level 2 and Entrepreneurial Thinking Level 2 in this hub.
What this module does not cover: the exact FDA scale definitions for micro, small, medium and large; a current FDA premises inspection fee and whether product registration lasts one year or three; the GSA fee schedule beyond 2019 and whether a cottage kitchen needs the mark; EPA permit class and fees for a small food processor; the processed-food VAT treatment under Act 1151; Ghana rules on food-contact packaging, allergen labelling, permitted preservatives and microbiological limits for sobolo and shito (UK allergen and US preservative examples are given as guides only); supermarket listing fees and payment terms; detailed European Union rules (an outline is given) and AfCFTA export rules; ISO 22000 and FSSC 22000 fees; a cooperative registration route; large factory processing; and current Takoradi prices for equipment (not found). It is not legal, tax or financial advice.
Every source used in this manual is listed, with links, in the Teacher Copy.