About this module
At Level 3 the question changes from "how do I do this safely?" to "how do I make sure everyone on my job is safe, honest and paid, and how do I earn a fair living from it?"
Who it is for. People who have finished House Electrical Wiring Level 2, or who can show the same skills, and who want to lead a team or run a business. National Proficiency II leads to National Certificate I. This module sits at an advanced level near that; it is not a CTVET programme and does not claim to be.
The law is the same. Wiring must be done by an Energy Commission-certified electrician under the Electrical Wiring Regulations, 2011 (L.I. 2008). A person who hires an uncertified electrician can be fined up to 250 penalty units, jailed for up to two years, or both. If you want to do wiring, or to run a business that does wiring, you need the certificate yourself or must employ certified electricians. This module does not certify you, and it does not teach live work. Ask the Energy Commission for the current syllabus, fees and contractor rules.
Bridge from Level 2: what you already know
- Safe isolation, lock-out and prove, test, prove
- Load lists, amps, why cable and breaker are chosen together
- The earth path, bonding and RCDs (foreign rules labelled)
- Lighting, switching and socket circuits; extension leads and loads
- Visual inspection checklist; the main tests; the Installation Completion Certificate; periodic inspection
- Appliances, the yellow label, surges and changeover switches
- The route to certification; honest marketing; helper income sums
Level 3 adds leading people, deeper faults and fire work, the client's view of certification, pricing, contracts, and the whole business cycle.
How the module works
Each unit has learning outcomes, performance criteria, the range and the evidence your assessor needs. You are judged Competent or Not Yet Competent. Units 5 to 7 end in a capstone: a one-page business plan and a 12-month cash forecast presented to a panel.
Unit 1 · Supervise helpers and apprentices; plan site safety
A supervisor does not hold the tool. A supervisor makes sure everyone goes home alive.
Competency standard
| Learning outcome | Performance criteria — the trainee… |
|---|---|
| 1.1 Brief and organise a team | gives clear tasks, checks understanding and records who does what |
| 1.2 Run a site safety plan | writes a plan with isolation, lock-out, ladder, first-aid and emergency steps |
| 1.3 Train and assess an apprentice | uses a training log with dated tasks and feedback |
| 1.4 Stop unsafe work | stops the job, records why and reports |
Range. Small house and shop jobs; a team of two to five; the certified electrician in charge of wiring. Evidence. Site safety plan; toolbox talk; training log.
Ask a qualified expert. For all electrical work, hire an Energy Commission-certified electrician (CEWP). A supervisor does not make unsafe work safe by watching it. For injuries, shocks and burns, see a doctor or nurse; in an emergency, call 112. This is general information, not legal advice; ask a qualified lawyer or the Energy Commission about duties and liability.
Who does what
| Role | What the person may do |
|---|---|
| Certified electrician (CEWP) | Plans, connects, tests, certifies; controls isolation |
| Certified master electrician | As above, and registers and trains apprentices |
| Apprentice | Works under supervision on dead circuits; recorded in the Energy Commission's registration system |
| Helper | Carries, marks, drills, cleans; no connections |
| Client | Pays, gives access, receives the certificate |
Minimum age. Nobody under 18 may do hazardous work in Ghana. Do not use children as helpers.
The site safety plan (one page)
- Job, place, date, client. Who is the CEWP in charge?
- Isolation plan. Which breaker, which lock, who holds the key; a second supply (generator, solar) identified.
- Test plan. The CEWP proves, tests and proves; written note of the time.
- Work at height. Ladders checked; someone holds the ladder; no work in rain or wind.
- Dust and noise. Masks and glasses when chasing or drilling.
- Emergency. First-aid kit; nearest clinic; call 112; where the main switch is.
- Fire. An extinguisher on site; clear exit; ask the Ghana National Fire Service about the right type and training.
- Tidy site. Materials stored dry; waste collected.
The lock-out register
A simple book: date, circuit, who locked, time locked, who tested, time unlocked. The rule from Level 2 stays: one lock, one key, one person. A foreign rule says live parts must be de-energised and verified with test equipment before work.
Training an apprentice
Each week the supervisor records tasks done, tasks watched and tasks the apprentice is not yet allowed to do. The Energy Commission says a beginner's route is training, apprenticeship registration, supervision by a certified professional, then certification. Your log is evidence for that route.
Tools and items for this unit
| Item | What it is and what it does | When you use it | Size or type | Also called | Status |
|---|---|---|---|---|---|
| Lock-out kit (padlock, tag, hasp, register) | The kit shown in Level 1, Unit 1 | Every isolation | One personal lock per worker | lockout kit | Everyone uses own lock |
| Permit-to-work form | A written permission for work on a defined circuit by named people for a stated time | Bigger or riskier jobs | A5 or A4 page (Appendix C) | work permit | Supervisor issues, CEWP signs |
| Tool crib register | A list of tools signed out and in | Every site | A4 book | tool log | Supervisor keeps |
| Calibration log | A record of when each instrument was checked | Each instrument | A4 table | instrument log | CEWP keeps |
| Safety signs | "Danger: electrical work", "Do not switch on" | At the board and the site entrance | Standard colours | warning signs | Supervisor places |
| First-aid kit | A box with dressings, gloves and a mask | On site | Checked monthly | first aid box | Everyone knows where it is |
| Fire extinguisher | A cylinder for small fires; type per the fire service | On site, near the exit | Ask the Ghana National Fire Service | extinguisher | Train before use |
| Barrier tape and cones | A marked-off area | Around holes, ladders and boards | Red and white tape | caution tape | Supervisor places |
SAFETY PROTOCOL: supervising isolation and a team on site (hazardous task).
Before: the CEWP in charge is named; the site safety plan is signed; lock-out kit, tester and proving unit are on site; every worker has a lock; PPE for everyone; the emergency plan is told (112, first-aid kit, nearest clinic).
While: Do hold a toolbox talk; do check each lock is fitted; do keep a head count; do stop work if isolation cannot be shown. Do not allow a worker under 18, live work, work in rain on ladders, or removal of another person's lock.
After: tools counted against the crib register; locks removed by owners only; register signed; site tidy; incident or near-miss written down.
Emergency: call 112; switch off the supply at the main switch if it is safe; first aid as in Level 1; do not touch a person in contact with live parts; report to the client and the CEWP.
Toolbox talk
A five-minute talk before work: today's task, today's danger, today's rule. Ask each helper to repeat one rule. Write names and the date.
Plan the labour
Example figures. A house wiring job needs 8 days of the electrician and 16 helper-days. You have 2 helpers. (1) How many days will the job take if the electrician works every day and helpers work every day? (2) The electrician's day rate is GH¢250 and a helper's GH¢90 (examples). What is the labour cost? (3) If one helper is absent on 3 days, how many extra days might the job need?
Write a safety plan and give a toolbox talk
- Take a plan for a two-room job from your instructor.
- Fill in the one-page site safety plan.
- Prepare a five-minute toolbox talk on isolation and lock-out.
- Give it to four classmates acting as helpers; ask each to repeat one rule.
- Start a lock-out register for the training board and use it for a week.
- The CEWP instructor signs the plan.
Training log
Create an apprentice training log (one page) with columns for date, task, done or watched, mistakes, feedback, and "not yet allowed". Fill in the first week for a pretend apprentice.
Check yourself
- Who controls isolation on a house wiring job?
- What should a toolbox talk cover?
- What must you do if the job cannot be shown to be safe?
Unit 2 · Find non-routine faults; prevent fires; report incidents
The easy fault is a dead lamp. The hard fault is the one that appears only when it rains, or only when the fridge starts.
Competency standard
| Learning outcome | Performance criteria — the trainee… |
|---|---|
| 2.1 Use a fault-finding method | follows ask, look, think, isolate, test, repair and retest |
| 2.2 Recognise non-routine faults | names causes of repeat tripping, flicker, hot parts and no supply |
| 2.3 Reduce fire risk | gives a household a fire-risk checklist |
| 2.4 Report incidents | writes a short, factual incident report |
Range. Single-phase houses and small shops; visual and dead checks; the CEWP does all tests. Evidence. Fault diary; fire-risk checklist; incident report.
Ask a qualified expert. Every wiring fault must be investigated and repaired by an Energy Commission-certified electrician. Never try to find a fault by touching live parts. If there is fire or smoke, leave and call 112. For burns or shocks, see a doctor or nurse.
The method
- Ask. What happened, when, what was running, has it happened before?
- Look. Without touching live parts: burn marks, melted plugs, damaged cables, water, pests.
- Think. Which circuit? Which load? What changed (a new appliance, a storm, a builder)?
- Isolate. The CEWP switches off and locks the circuit and proves it dead.
- Test and repair. The CEWP tests and repairs.
- Retest and record. The CEWP retests before the supply is restored. You write the diary.
From the field: too small, so it keeps tripping
The moment. A breaker kept going off.
The problem. Repeated tripping, mostly in rural areas and slums where people avoid qualified persons.
The cause. Undersized cable overheats and trips the breaker many times. Tripping on one section also shows that section is overloaded.
What was done. The ECG only connects a house when a certified contractor has validated and approved the wiring before a meter is given. [[FLAG: check the current Energy Commission certificate process]]
The lesson. A breaker that keeps tripping is a warning, not a nuisance.
Next time. 1. Find which section is overloaded. 2. Lighten it or re-wire that circuit with the correct cable. 3. Call a certified electrician.
Told by De-Graft Afful, from his own site experience.
Fault-finding charts with yes and no branches are in Appendix A. A graded defect catalogue is in Appendix B.
Tools and items for this unit
| Item | What it is and what it does | When you use it | Size or type | Also called | Status |
|---|---|---|---|---|---|
| Clamp meter | Reads load current or leakage current around one conductor | To see which section is overloaded without disconnecting | CAT-rated | tong tester | CEWP |
| Insulation resistance tester | Reads the insulation between conductors on a dead circuit | To find leaking cable | 500 V / 250 V | megger | CEWP |
| Cable locator | Finds hidden cable | Before cutting walls | Hand-held | cable detector | CEWP |
| Earth fault loop and RCD testers | Live tests of the fault path and the trip | After repairs | Plug or lead type | loop tester | CEWP |
| Fault diary | A book of faults, causes and fixes | Every call-out | A5 | fault log | You keep it |
Faults that are hard to find
| Symptom | Possible causes (ideas for the CEWP to check) |
|---|---|
| Breaker trips whenever one appliance starts | Faulty appliance; overload; loose connection |
| RCD trips in rain | Moisture in an outdoor fitting or a damaged cable |
| Lights flicker when a heavy load starts | A loose connection or a shared, overloaded circuit |
| A plug or socket is hot | Overload or a loose terminal |
| Tingling from a metal case | Earth fault: unplug at once, do not use, call the CEWP |
| No power at the house, neighbours have power | Check the meter and main switch, then ask the electricity company or the CEWP |
The earth path and protection devices work together, so an earth fault shows up as tripping or tingling. Practical diagnosis stays with the certified electrician.
From the field: the house that burnt
The moment. A house was burnt down within two years of use. The whole house and all its wiring were lost.
The problem. Three air conditioners were running on one cable. That cable was the same size as the one bringing the mains in from the electricity company.
The cause. The cable was too small for the load, so it overheated, the wires touched, and the spark started the fire.
What was done. Nothing could be saved. [[FLAG: author to confirm: any action taken afterwards, who inspected]]
The lesson. One small cable cannot carry three air conditioners.
Next time. 1. Add up the load before choosing the cable. 2. Give each big load its own correctly sized circuit and breaker. 3. Use good-quality cable and ask a qualified, certified electrician to check the design.
Told by De-Graft Afful, from his own site experience.
Technical note (international method, labelled). Each circuit is sized for its own load, and the breaker is chosen for the cable. Level 2 Appendices A to C give the method. An inspection before connection is meant to catch exactly this. Ask a qualified expert: an Energy Commission-certified electrician.
SAFETY PROTOCOL: fire on site or in a house (emergency).
Before: an escape route; an extinguisher of the type the fire service advises; a smoke alarm in homes; the main switch located; 112 on every phone.
While: Do leave the building and call 112; do switch off at the main switch only if it is safe and reachable; do keep people back. Do not use water while the supply may be on; do not go back for belongings; do not fight a large fire.
After: do not re-enter until the fire service says; keep the site untouched for the investigation; write an incident report (Unit 2).
Emergency: burns and smoke inhalation: see a doctor or nurse; 112 for any injury.
Fire prevention
The Ghana National Fire Service's first-half 2025 report gave 3,595 fires; named causes included faulty wiring, overloaded circuits and illegal connections. Domestic fires were 881 cases, 42.9% of incidents, in the first quarter of 2026. The Commission links untrained installers to electrical fires and fatal shocks.
- No overloaded extension leads
- No cables under carpets or through doors
- Sockets and plugs without cracks or scorch marks
- Breakers not taped or wedged
- Appliances unplugged when not in use, especially heaters and irons
- A working smoke alarm, if the household has one, and a clear escape route
- Nothing flammable stacked near the consumer unit or meter
- The name of the household's certified electrician, kept where the family can find it
For an electrical fire, switch off the supply only if you can reach the switch safely, leave, and call 112. Ask the fire service which extinguisher to keep for electrical fires and how to train.
Incident reports
Write: date and time, place, who was present, what happened, what was done, what was damaged, who was told. Stick to facts. Keep a copy. Report serious incidents to the client, the CEWP and the authorities as the law requires: ask the Energy Commission and the Ghana National Fire Service what applies; not verified here.
Which fault?
Six short stories. For each say what you would check first and who does the test. (1) A kettle and heater work, but a fan flickers every time the heater switches on. (2) A new house trips its RCD every evening at the same time. (3) A TV shocks the owner when touched. (4) A cable in the ceiling smells of burning. (5) The whole house is dark, the next house has power. (6) A breaker trips only when it rains.
Fault diary and fire-risk walk-round
- Visit a home or shop with permission and a CEWP or adult family member.
- Walk round with the fire-risk checklist. Do not touch live parts.
- Write three findings and the advice for each.
- Write one incident report for a pretend case given by your instructor.
- Present your findings to the class.
Fire plan
Draw an escape plan of your home and list five electrical risks. Share it with your family.
Check yourself
- List the six steps of the fault-finding method.
- Name two named causes of fires from the fire service report.
- What goes into an incident report?
Unit 3 · The certification and inspection system, from the client's side
A client who understands the paper trail trusts you. An electrician who explains it earns repeat work.
Competency standard
| Learning outcome | Performance criteria — the trainee… |
|---|---|
| 3.1 Explain the system | draws the path from the CEWP's work to the meter |
| 3.2 Explain the rights of a client | says what a client may ask for and check |
| 3.3 Explain materials rules | explains L.I. 2478 and standard marks to a client |
| 3.4 Spot fake or missing paper | knows what to ask when a certificate looks wrong |
Range. House installations in Ghana; official sources. Evidence. A process map; a client leaflet.
Ask a qualified expert. This is general information, not legal advice. Ask a qualified lawyer, the Energy Commission or the Ghana Standards Authority before you act on a legal, licence or registration matter. Wiring and certification are for an Energy Commission-certified electrician.
The system in order
- Regulation. L.I. 2008: wiring only by certified electricians.
- Certification. The Energy Commission examines Domestic, Commercial and Industrial practitioners and an Inspector category. The November and December 2025 exams had 1,386 candidates and 1,179 passed.
- Apprentices. Registered by certified master electricians.
- Installation. A certified electrician wires, tests and fills in the forms; an inspector checks and stamps.
- Certificate. The Installation Completion Certificate is needed for grid connection or a personal meter and is issued only by certified electricians under Energy Commission supervision.
- Meter. ECG will not process the meter application without the stamped forms; the customer pays the electrician but not the inspector.
- Periodic inspection. First 10 years after first use, then every 3 to 5 years until 30 years, then every 2 years.
What has changed since the first edition (check the Energy Commission for today's position).
- The ICC app. The Energy Commission launched a mobile app: the electrician enters the wiring details, an inspector approves, and a digital token is the certificate. Piloted from November 2024, about 21,000 practitioners adopted it, and paper certificates were reported no longer accepted for grid connection after June 2025. The paper-form steps in this unit describe the older route. Ask the Energy Commission which route is in force.
- Standards under review. The Energy Commission and the Ghana Standards Authority said in 2023 they planned to review wiring standards for rooftop solar and smart homes.
- Audits and sanctions. The Commission samples inspected work; licences have been withdrawn, some for more than a year and some permanently; certified electricians whose work is shoddy must correct it.
- Mandatory RCDs and earth chambers. Reported at a certification ceremony; I could not read the full report: not verified.
Verification and fakes
The Energy Commission says an electrician's certification can be checked on the Certified Electrician mobile app, the Energy Commission website or CEWPAG. A new Energy Commission system, piloted in 10 ECG districts, aims to approve only installations by certified professionals, send consumers a text message and cut fake certificates. A client may ask to see your certificate; landlords may do the same.
Materials rules
L.I. 2478 says only cables and accessories that meet Ghana Standards Authority standards may be sold. Importers and manufacturers register with the Energy Commission and obtain a Certificate of Conformance; penalties range from 125 to 500 penalty units or 6 to 24 months' prison, and importers of substandard products must pay to re-export them. Wholesalers and retailers must check that goods comply, and the Energy Commission, GSA, Customs and Police can inspect and seize non-compliant goods. Standard marks include GS-1009 as the wiring code.
From the field: his bench warning (De-Graft Afful). "Use a qualified and certified electrician and use quality wires and materials."
Client rights, in plain words
A client may ask: Are you certified? Which category? May I see the certificate? Which materials, which brands, which standard? Who inspects? How long? What is the warranty? Where will the Installation Completion Certificate come from? Write the answers into the contract (Unit 4).
Insurance. The Commission says it is working with the National Insurance Commission so that facilities wired by certified practitioners attract lower premiums. Whether this is in force was not verified: ask the Commission and an insurer.
Timeline
Example dates. A client signs a contract on 3 March. Wiring takes 8 working days from 10 March. The inspector visits 5 working days after the electrician finishes. ECG needs 10 working days after the stamped forms (example). (1) Ignoring weekends and holidays, on which date will the CEWP finish? (2) The inspector visit? (3) The meter fitted? (Count calendar days as if all days were working days.)
Client leaflet
- Draw the seven steps of the system on one page.
- Write six questions a client may ask you, and your plain answers.
- Add a box on how to check a certificate, and a box on cable marks.
- Test the leaflet on one family member and improve it.
- Show it to the CEWP instructor to check.
Ask the electricity company
With the CEWP instructor's help, ask how a new house is connected locally, what forms are needed and how long it takes. Write it up as a case study.
Check yourself
- Who issues the Installation Completion Certificate?
- Why must a client not pay the inspector?
- Name two ways to check an electrician's certificate.
Unit 4 · Quote, contract and buy materials
A quote is a promise in numbers. A contract is a promise on paper. Both protect you and the client.
Competency standard
| Learning outcome | Performance criteria — the trainee… |
|---|---|
| 4.1 Prepare a bill of quantities | lists materials, quantities and prices |
| 4.2 Price a job | adds labour, transport and profit; explains margin and mark-up |
| 4.3 Write a simple contract | covers scope, price, deposit, timing, variations, warranty and certificates |
| 4.4 Buy and store materials | checks marks, keeps receipts, protects stock |
Range. Small house wiring and rewiring; example prices. Evidence. Bill of quantities; price sheet; draft contract.
Ask a qualified expert. This is general information, not legal advice. Ask a qualified lawyer to review any contract before you use it. For tax, VAT and withholding tax, check with GRA or a qualified accountant. Wiring is for an Energy Commission-certified electrician.
From the field: pipes in the concrete
The moment. Electrical conduits were cast into walls and concrete.
The problem. They clashed with the civil work. [[FLAG: author to confirm: one real case]]
The cause. The conduit routes were not planned with the builders.
What was done. [[FLAG: author to confirm: what was done on that job]]
The lesson. Plan the conduit before the concrete is poured.
Next time. 1. Agree conduit routes with the builder before casting. 2. Never cut a structural member for a conduit. 3. Ask the engineer.
Told by De-Graft Afful, from his own site experience.
Technical note (civil angle). Plan every conduit route on the drawings before casting, together with the structural and plumbing drawings, so conduit does not cross steel bars, columns or beams. Put the conduit plan in the contract as a drawing. Ask a qualified expert: a GhIE-registered engineer, a licensed architect or the District Assembly, and the CEWP for the electrical side.
Tools and items for this unit
| Item | What it is and what it does | When you use it | Size or type | Also called | Status |
|---|---|---|---|---|---|
| Bill of quantities (BoQ) | A priced list of items, quantities and totals | Every quote | Appendix D | BOQ, schedule of quantities | You prepare |
| Quotation | The price offered to the client | Before the contract | One or two pages | quote, estimate | You issue |
| Variation order | A written change to the agreed work and price | When the client adds work | One page | change order | Both sign |
| Delivery note | A paper that lists goods delivered | When materials arrive | Carbon-copy book | waybill | Check and sign |
| Retention | A part of the price held back until faults are fixed | Larger contracts | A percentage in the contract | retainage | Agree in writing |
| Material take-off sheet | Quantities from the plan | Before buying | Level 2 Appendix J | material list | You prepare |
A bill of quantities (BoQ)
A BoQ lists every item, how many, the unit price and the total. The CEWP measures the quantities; you cost and check them.
Worked example (all prices are examples)
| Item | Quantity | Unit price GH¢ | Total GH¢ |
|---|---|---|---|
| 2.5 mm cable, 100-yard coil | 4 | 480 | 1,920 |
| 1.5 mm cable, 100-yard coil | 3 | 350 | 1,050 |
| Conduit lengths | 60 | 12 | 720 |
| Back boxes | 40 | 6 | 240 |
| Sockets | 20 | 35 | 700 |
| Switches | 14 | 25 | 350 |
| Lamp holders | 10 | 20 | 200 |
| Consumer unit with breakers | 1 | 1,200 | 1,200 |
| Earth rod and clamp | 1 | 250 | 250 |
| Tape, screws, saddles | 1 lot | 300 | 300 |
| Materials total | 6,930 |
(The 2.5 mm cable price follows listings of GH¢470 to GH¢480 per 100-yard coil seen on a classifieds site in 2026, an advertised example price; all other prices are invented examples.)
Labour and other costs (examples): electrician 8 days at GH¢250 = 2,000; two helpers, 8 days each at GH¢90 = 1,440; transport 300. Total cost = 6,930 + 2,000 + 1,440 + 300 = GH¢10,670.
Approved rates and the rate survey
The Energy Minister urged certified electricians and inspectors to charge approved rates, with lower rates for rural customers; no figures and no complaint route were found. Until a figure is published, build your own price from a rate survey: ask at least three Takoradi electricians and shops, record the day rate and the price per point, and write the date. Appendix D has a blank survey page. Do not copy another person's price without checking it.
The materials buyer's guide (conductor check)
- Read the marks: brand, size in mm², voltage rating and a standard number such as GS IEC 60227.
- Check the coil: 100 yards is 91.4 m; the magnet test on stripped copper.
- Check the conductor: ask the shop to cut a short sample; the copper should be bright, the strands even and the diameter the right size for its stated mm² (a slide caliper or the cable's data sheet gives the diameter). A conductor-resistance test needs a lab instrument: ask the GSA to test a doubtful batch.
- Know the history: the GSA has reported that many sampled cables failed tests (43% in 2024 in a search summary; an older 70% for 2017, which industry disputed); both are not verified. Do not name brands. Ask the GSA for its current list of passed and failed products.
- Keep the receipt and the packaging marks for the client's file.
Margin and mark-up
- Mark-up is profit as a share of cost: 20% mark-up on GH¢10,670 gives a price of GH¢12,804.
- Margin is profit as a share of the price: for a 20% margin, price = cost ÷ 0.8 = GH¢13,337.50, so the profit is GH¢2,667.50.
- A 20% margin earns more than a 20% mark-up. Always say which you mean.
Quote and deposit
Use the example job above. (1) What is the price for a 25% margin? (2) What is the profit? (3) The client pays 60% as deposit; how much is that? (4) Does the deposit cover the materials of GH¢6,930? (5) The client later adds 4 more sockets at GH¢35 each plus GH¢200 labour; what is the variation price at the same 20% margin on this extra cost?
The contract (one page)
- Names, addresses and Ghana Card or business details of both sides
- The scope: rooms, points, circuits and the certified electrician in charge, with their category
- Materials: brands, sizes and the standard marks required
- Price, deposit, stage payments and who pays the inspector (the customer does not, per the Commission and ECG)
- Time to start and finish, and what delays are excused
- Variations: all extra work agreed in writing before it starts
- Certificates: the electrician applies for the Installation Completion Certificate and gives a copy to the client
- Warranty: how long you fix faults caused by your work
- Safety: isolation and lock-out on the job; the client keeps children and animals away
- How disputes are handled
Withholding tax on contract payments
Some payers withhold tax from payments to suppliers. GRA lists rates of 3% for goods, 5% for works and 7.5% for services; the right rate for an electrician's job should be confirmed with GRA. Ask the payer for a withholding tax certificate for the money held back.
Buying and storing
- Buy from shops that show standard marks; keep every receipt.
- Check the coil length, marks and the magnet test before paying.
- Store cable and accessories dry and off the floor.
- Count materials in and out of the site, with a signed sheet.
- Never use unapproved cable to save money: the supplier and the user can both face penalties under L.I. 2478.
Quote a real-style job
- Take the plan of a two-bedroom house from your instructor.
- Count points and write a BoQ with quantities (the CEWP corrects it).
- Collect at least two prices for the main items from hardware shops (do not buy).
- Add labour, transport and profit at a margin you choose and justify.
- Write a one-page contract using the checklist.
- Present the quote to a classmate acting as the client.
Price survey
Visit two electrical shops. Record the price of a 100-yard coil of 2.5 mm cable, a socket, a switch and a breaker, the brand and whether it has a standard number. Compare with your example prices.
Check yourself
- Is a 20% margin the same as a 20% mark-up?
- Name three things a contract should say about the work.
- Why take a deposit?
Unit 5 · Establish your electrical business
A good electrician with a bad business plan still fails. A registered, insured, honestly priced business grows.
Competency standard
| Learning outcome | Performance criteria — the trainee… |
|---|---|
| 5.1 Choose a legal form | compares business types and registers one |
| 5.2 Meet tax, permit and licence duties | lists tax, VAT, Assembly and Energy Commission steps |
| 5.3 Plan start-up costs and finance | budgets tools, premises and working capital and names finance sources |
| 5.4 Employ fairly | applies SSNIT, PAYE and Labour Act basics |
Range. Own business plan for an electrical services business. Evidence. Registration checklist with costs; one-page plan; payroll sheet.
Ask a qualified expert. This is general information, not legal advice. Ask a qualified lawyer before you act on any legal, licence or registration matter. For tax, VAT, PAYE and SSNIT, check with GRA or a qualified accountant. For loans and insurance, ask a licensed financial adviser or your bank. Wiring is only for Energy Commission-certified electricians.
Who may run an electrical wiring business
Only certified electricians may do wiring. A business that sells wiring services must be led by or employ certified electricians. The Energy Commission registers electrical contractors and publishes the register on its website, and expects them to follow GS 1009 and use GSA-approved materials. The steps, documents and fees for contractor registration were not found. Ask the Energy Commission before you plan. If you are an apprentice, you work under a certified master electrician and do not run a wiring business.
Choose a legal form
| Type | ORC fee (2026) | Notes |
|---|---|---|
| Business name (sole proprietor) | GH¢130; GH¢70 a year to renew | Most start here; owner has unlimited liability |
| Partnership | GH¢270; GH¢100 a year | 2 to 20 partners; written agreement |
| Company limited by shares | GH¢585 plus 1% capital duty as stated on the page | At least 2 directors and a secretary; yearly returns |
| Company limited by guarantee | GH¢490 | For non-profit bodies such as training schools |
Annual returns cost GH¢175 a year, with late fees of GH¢1,000 or GH¢2,000. Cooperatives are not registered by the ORC; they get an organisational TIN from GRA, and the Department of Co-operatives route was not verified.
Tax and permits
- A Ghana Card number is the individual's tax number (TIN).
- Modified Taxation Scheme: for residents with business income only and not VAT-registered; turnover between GH¢20,001 and GH¢750,000 pays 3% of turnover (the 750,000 ceiling follows Act 1178 of 2026; GRA's own page still showed 500,000 on 8 Oct 2026).
- VAT is 15% plus levies of 5%, an effective 20% from 2026; goods sellers register above GH¢750,000, but services have no turnover threshold and must register within 30 days of starting taxable services; a VAT-registered business cannot use the Modified Taxation Scheme. How VAT applies to a mixed job of materials and labour was not verified: ask GRA.
- Companies pay income tax at 25%, with lower rates in some places and sectors.
- Business operating permit: the Sekondi-Takoradi Assembly runs a portal at tcc.stma.gov.gh. The fee for electricians was not found: ask the Assembly. The Hub's own district may use different rules.
- Insurance only from licensed insurers. Compulsory covers were not verified.
- Keep tax records for at least 6 years.
Tools and items for this unit: a starter purchase list
All prices are to be found by your own market survey (Takoradi shops); none was verified for this book.
| Item | Why it is first | Also called | Price (survey needed) |
|---|---|---|---|
| Two-pole voltage tester and proving unit | Safe isolation | voltage indicator | example only |
| Multimeter | Everyday readings | avometer | example only |
| Clamp meter | Load and leakage | tong tester | example only |
| Insulation resistance tester | Proof of insulation | megger | example only |
| Basic hand-tool set with insulated screwdrivers | Daily work | electrician's tool set | example only |
| Hammer drill and bits | Fixing boxes | percussion drill | example only |
| Ladders (two sizes) | Reach | step ladder | example only |
| PPE for each worker | Safety | safety kit | example only |
| Lock-out kits | Isolation | lockout kit | example only |
| Earth electrode tester (later) | Earth testing | earth resistance tester | example only |
Start-up budget (examples)
| Item | Example GH¢ | Notes |
|---|---|---|
| Hand tools set | 1,500 | Insulated handles |
| Digital multimeter and approved voltage indicator | 1,200 | Buy from a reputable shop; ask the CEWP |
| Drill and bits | 600 | |
| Ladders, PPE, lock-out kit | 900 | |
| Registration and permits | 400 | Business name GH¢130 plus permit (not found) plus other |
| Phone, data and WhatsApp Business | 300 | |
| Working capital for materials | 5,000 | Deposits help |
| Total | 9,900 | Example; get real quotes |
(All figures in the table are examples; the business name fee of GH¢130 is verified.)
Finance
- Savings, susu and family loans are the usual start; keep records so a lender can see your cash flow.
- The Ghana Enterprises Agency has Business Advisory Centres in Takoradi, Shama, Effia-Kwesimintsim, Mpohor and Ahanta West.
- The 2026 Budget names GH¢160 million for Adwumawura, GH¢170 million for the National Apprenticeship Programme and GH¢401 million for the Women's Development Bank. Whether and how you can use them was not verified: ask the programme offices.
- The Bank of Ghana policy rate was 14% on the date checked. Banks set their own rates.
- The Assemblies' disability fund rose to 5% in 2026.
Hiring and employing
- Pay at least the daily minimum wage, GH¢21.77 for 2026.
- SSNIT: worker 5.5% plus employer 13%, with the employer paying within 14 days after month end; register workers on hiring.
- PAYE: the first GH¢588 a month is tax-free; pay by the 15th.
- Labour Act: a written contract for six months or more, a written statement of terms within two months, 15 working days of paid leave.
- Apprentices: certified master electricians must register all apprentices.
Location settings that give good returns
- Close to new estates, hardware and electrical shops
- A small, dry, lockable store for cable and accessories
- Near hospitals, schools, hotels, farms and shops that need maintenance contracts
- Good phone signal and reachable roads for quick call-outs
Business ideas and ingenuity
- A maintenance-contract service with yearly visits
- Energy audits and yellow-label advice (no wiring)
- A repair and re-check service for older houses ahead of periodic inspection, done by certified electricians
- Supplier of approved accessories, registered as the law requires
- Training helpers for a fee, within the law
How you market the business
- WhatsApp Business: profile, catalogue and quick replies.
- Google Business Profile: name, area, photos, reviews.
- Signage on your vehicle and tool box.
- A portfolio of neat work and certificates (with permission).
- Referrals from hardware shops, landlords and estate managers.
Accessibility
The Disability Act bans job discrimination. Quoting, drawing, estimating, stores, bookkeeping, phone sales and client care are desk or seated tasks that suit many people with disabilities. Ladder and roof work is not suitable for everyone. Adjustments include written task cards, seated benches, good light and an agreed buddy.
Registration and start-up sums
Example figures. A sole proprietor registers a business name and pays the first renewal a year later. (1) What is the registration cost today and the renewal? (2) Two partners register a partnership; first year cost? (3) A shop owner takes a loan of GH¢6,000 at a flat 12% for the year (example only); total repayment? (4) Using the start-up budget above, how much of the GH¢9,900 would the loan cover?
Registration checklist and one-page plan
- Choose your legal form and say why.
- Write the registration and permit checklist with the verified costs and the "not found" items.
- Write a one-page plan: services, customers, certified electrician, start-up budget, prices, first customers, how you will market.
- Calculate one month's payroll for an employed apprentice at the minimum wage (SSNIT and PAYE).
- Present to the class.
Ask the Energy Commission
With your instructor, write the questions you would ask the Energy Commission about contractor registration, fees and renewals. Record the answers if you get them.
Check yourself
- Which fee do you pay to register a business name?
- At what turnover must a seller of goods register for VAT?
- Who must lead a business that does wiring?
Unit 6 · Bookkeeping and accounting for an electrical business
Every job uses cable, accessories, days and fuel. If you do not record them, you will not know which jobs pay.
Competency standard
| Learning outcome | Performance criteria — the trainee… |
|---|---|
| 6.1 Keep daily books | keeps cash, MoMo and bank records, job cards, purchases and stock |
| 6.2 Prepare statements | produces a monthly profit and loss, balance sheet and profit per job |
| 6.3 Cost and price | calculates margin, mark-up and break-even |
| 6.4 Control cash and tax records | reconciles MoMo or bank, forecasts cash and keeps tax records |
Range. One month of real or example jobs. Evidence. Books, statements, reconciliation, forecast.
Ask a qualified expert. This is general information, not accounting or legal advice. For tax, VAT, PAYE and SSNIT, check with GRA or a qualified accountant. For loans and insurance, ask your bank or a licensed financial adviser. The hub's Money Skills Level 2 teaches the basics; this unit applies them to an electrical business.
Business items defined
| Term | What it is | Also called |
|---|---|---|
| Invoice | A bill that asks for payment, listing the work and the price | bill |
| Receipt | Proof that money was paid | acknowledgement |
| Delivery note | Lists goods delivered, signed on receipt | waybill |
| Certificate of Conformance | The paper that shows a cable or accessory meets the standard; importers and manufacturers get it under L.I. 2478 | conformity certificate |
| Contractor registration | The Energy Commission register of electrical contractors; the steps were not found | contractor licence |
| Warranty card | A paper that states how long you fix faults | guarantee |
| Petty cash voucher | A slip for a small cash payment | cash voucher |
| Stock card | A card that tracks one material in and out | stock sheet |
The records
| Record | What it shows |
|---|---|
| Job card | Customer, work, materials, hours, deposit, balance |
| Purchases book | Every purchase of cable and accessories with receipt |
| Stock sheet | What is in the store and what it cost |
| Cash book and MoMo book | Every cedi in and out |
| Asset register | Tools and instruments with cost and age |
| Debtors and creditors list | Who owes you and whom you owe |
| Lock-out register and certificate copies | Safety and legal records (keep with job files) |
Keep tax records for at least 6 years.
The basic rules
- Assets = liabilities + owner's equity; the trial balance is only a partial check.
- Straight-line depreciation = (cost − end value) ÷ useful life.
- Separate the owner's money from the business money; what the owner takes out is drawings, not an expense.
Worked example: Ama's Electrical Services, January (all figures are examples)
One month's books
- Ama puts in GH¢12,000 as capital.
- She buys tools for GH¢4,800 (5 years, no end value).
- Job 1: a house wiring job priced GH¢9,000, paid in full. Materials GH¢4,200.
- Job 2: a shop wiring job priced GH¢6,000; GH¢3,600 deposit received and GH¢2,400 still owed. Materials GH¢2,500.
- Total materials bought in the month: GH¢7,300; stock left at month end: GH¢600.
- Helper wages GH¢1,200; transport GH¢350; phone and data GH¢150; store rent GH¢400.
- Ama takes GH¢1,000 for herself (drawings).
Work out: (1) cash at the end of January; (2) net profit; (3) the balance sheet; (4) gross profit on each job; (5) break-even sales for the month.
A page of the cash book (January, in part)
| Date | Detail | In GH¢ | Out GH¢ | Balance GH¢ |
|---|---|---|---|---|
| 2 Jan | Capital | 12,000 | 12,000 | |
| 3 Jan | Tools | 4,800 | 7,200 | |
| 10 Jan | Job 1 paid in full | 9,000 | 16,200 | |
| 12 Jan | Materials Job 1 | 4,200 | 12,000 | |
| 20 Jan | Job 2 deposit | 3,600 | 15,600 | |
| 22 Jan | Materials Job 2 and stock | 3,100 | 12,500 | |
| 31 Jan | Wages, transport, phone, rent, drawings | 3,100 | 9,400 |
(Example figures; materials 4,200 + 3,100 = 7,300 as above; the last line is 1,200 + 350 + 150 + 400 + 1,000 = 3,100.)
MoMo and bank reconciliation
Match your book to the statement every month. Differences are usually charges not yet recorded, payments made but not entered, or timing.
Reconcile
Example. Your MoMo book shows GH¢2,480. The statement shows GH¢2,230. The statement has charges of GH¢30 and GH¢20 that are not in your book, and a payment of GH¢200 to a supplier that you forgot to enter. (1) What should the corrected book balance be? (2) Does it agree with the statement? (3) What habit would prevent this?
Margin, mark-up and break-even
A job that costs GH¢10,000 and sells for GH¢12,500 has a margin of 20% (2,500 ÷ 12,500) and a mark-up of 25% (2,500 ÷ 10,000). Break-even sales = fixed costs ÷ gross margin ratio. Below it you lose money.
Depreciation
An approved voltage indicator and a multimeter set costing GH¢1,800 and lasting 3 years with no end value loses GH¢600 a year, or GH¢50 a month. Example figures.
Tax records
- If the business is not VAT-registered and the owner uses the Modified Taxation Scheme, tax is 3% of turnover between GH¢20,001 and GH¢750,000. For January's example sales of GH¢15,000, 3% would be GH¢450. Check with GRA whether you are eligible; professionals and owners of several outlets are excluded.
- A VAT-registered business cannot use the scheme and files VAT returns by the last working day of the following month.
- Withholding tax certificates from clients are tax records: keep them with your accounts.
- Employees: SSNIT by the 14th and PAYE by the 15th of the next month.
| When | What |
|---|---|
| 14th | SSNIT |
| 15th | PAYE and withholding tax |
| Last working day | VAT (if registered) |
| Quarterly (end Mar, Jun, Sep, Dec) | Provisional tax for companies |
| Within 4 months of year end | Annual income tax return |
| Yearly | ORC business name renewal or annual return; Assembly permit |
Software
Use a spreadsheet, or a free plan such as Zoho Books or Wave. Check the terms before you rely on them.
Month-end close
- Keep job cards and a cash book for one month (real or example).
- Reconcile your MoMo or bank book.
- Prepare a profit and loss and balance sheet.
- Work out profit per job and break-even.
- Make a list of tax dates and put them in your phone calendar.
- Present your books to the instructor.
Cost your own price
Using your Unit 4 quote, split the price into materials, labour, transport and profit. Which part is largest?
Check yourself
- What is the balance sheet rule?
- Why are drawings not an expense?
- How do you reconcile a MoMo book?
Unit 7 · Grow and sustain the business
Grow on quality, honesty and good paper. A business that cuts corners will be closed by one fire.
Competency standard
| Learning outcome | Performance criteria — the trainee… |
|---|---|
| 7.1 Build quality and customer care | uses checklists, follow-ups and a complaints routine |
| 7.2 Price and scale | sets prices from costs and plans growth without losing quality |
| 7.3 Plan finance, contracts and succession | keeps records a lender can read, handles contracts and plans for the future |
| 7.4 Plan and pitch | presents a one-page plan with a 12-month cash forecast |
Range. Own business plan for an electrical services business. Evidence. One-page plan; 12-month forecast; panel pitch.
Ask a qualified expert. This is general information, not legal, tax or financial advice. Ask a qualified lawyer, accountant or licensed financial adviser before you sign a contract, apply for a loan or tender. All wiring is for an Energy Commission-certified electrician.
Quality system
- A checklist for every job, signed by the certified electrician
- Photos before, during and after (with permission)
- Copies of the Installation Completion Certificate and test schedule in the job file
- A follow-up call after one week and after one month
- A complaints book: date, issue, action, date closed
Customer care
Arrive on time, explain the plan, protect floors, clean up, give the client the certificate and a list of simple rules (no overloaded leads; what the warning signs are; who to call). Satisfied clients refer you to others.
Pricing and scaling
- Review prices every quarter; materials prices change.
- Grow by adding a second certified electrician and helpers, not by lending your certificate to people who are not certified.
- Take on only as many jobs as you can supervise safely.
Partnerships, contracts and tenders
- Partner with builders, plumbers, tilers and architects: they often need electricians. Ask them how they choose subcontractors.
- Public and large private contracts may need registration, certificates and tax clearance; the rules were not verified here: ask the District Assembly, the Public Procurement Authority and a lawyer.
- Do not sign a contract you have not read. Ask a qualified lawyer.
Records for a loan
Keep: business name or company papers, TIN, 12 months of cash book and MoMo or bank statements, a profit and loss, balance sheet, job list, quotes, contracts and certificates. A lender wants to see steady cash in and a plan to repay.
Succession and ethics
- Write who will run the business if you are ill; keep key documents and passwords in a safe place.
- Never connect a house without the certified electrician's work and the proper certificate. Never sign or lend a certificate for work you did not do. Fake certificates are a known problem that the Commission's new system aims to reduce.
- Pay your helpers and taxes on time; treat apprentices fairly.
Finance and support
The Ghana Enterprises Agency's Business Advisory Centres in Takoradi, Shama, Effia-Kwesimintsim, Mpohor and Ahanta West can advise. Ghana's 2026 Budget lists programmes including Adwumawura and the National Apprenticeship Programme; ask the programme offices about access.
Capstone: one page and 12 months
Present to a panel: a one-page business plan and a 12-month cash forecast. A cash forecast lists money in and money out month by month and shows when you might run out.
Twelve-month cash forecast
Example figures. Opening cash GH¢5,000. Sales: GH¢10,000 a month in months 1 to 3, GH¢14,000 in months 4 to 9, GH¢18,000 in months 10 to 12. Materials and direct labour are 70% of sales. Fixed costs GH¢2,200 a month. The owner draws GH¢1,500 a month. Work out: (1) the cash change each month; (2) the closing cash in each month; (3) the lowest point; (4) the closing cash at month 12; (5) what you would do about the dip.
Pitch
- Write a one-page plan: services, customers, the certified electrician, prices, start-up budget, finance, marketing, risks.
- Build a 12-month cash forecast with your own example numbers, labelled as examples.
- Pitch to a panel for ten minutes; answer questions.
- Panel gives written feedback using the instructor's checklist.
One year on
Write a letter to yourself dated one year from today: what you will have done, what you will have learned, and what you will have refused to do.
Check yourself
- What does a cash forecast show?
- Why should you not lend your certificate?
- Name three records a lender wants to see.
Glossary
Items, instruments and business items are in Appendix J, and a master glossary across all three levels is in Appendix I. Local names for tools differ from town to town. Use the standard name given in this book when you order or ask for help, and show the picture.
| Term | Meaning |
|---|---|
| Bill of quantities | A priced list of items and quantities for a job |
| Break-even | Sales at which profit is zero |
| CEWP | Certified Electrical Wiring Professional |
| Defect grade | A label for how serious a defect is: danger, potentially dangerous, improvement, or further investigation (Appendix B) |
| Drawings | Money the owner takes out of the business |
| Gross profit | Sales less the cost of materials used |
| ICC | Installation Completion Certificate |
| ICCAPP | The Energy Commission's app and digital token for the ICC |
| Margin | Profit as a share of the price |
| Mark-up | Profit as a share of the cost |
| MTS | Modified Taxation Scheme |
| Permit-to-work | A written permission for defined work by named people |
| Reconciliation | Matching your books to the bank or MoMo statement |
| Retention | Money held back until faults are fixed |
| Snag list | A list of small faults to fix before hand-over |
| Variation | A change in the work agreed after the contract |
| Warranty | A promise to fix faults for a stated time |
Logbook
Copy these pages into an exercise book. Your logbook is part of your assessment evidence.
- Unit 1: safety plan; toolbox talk; lock-out register; training log
- Unit 2: fault diary; fire-risk checklist; incident report
- Unit 3: process map; client leaflet; case study
- Unit 4: bill of quantities; quote; contract; price survey
- Unit 5: registration checklist; one-page plan; payroll sheet
- Unit 6: cash book; month-end statements; reconciliation; tax calendar
- Unit 7: forecast; pitch; panel feedback
- Appendices A to K: used at least once (a fault chart, a form, a quote pack page)
- Every homework, dated
Self-check quiz
- Who controls isolation on a house wiring job?
- Name the six steps of the fault-finding method.
- What does the Installation Completion Certificate allow?
- Who does not pay the inspector?
- Which law limits the sale of cables and accessories to GSA standards?
- What is the price for a 25% margin on a job costing GH¢8,000?
- Which fee registers a business name, and what is the renewal?
- At what turnover do sellers of goods register for VAT?
- What are SSNIT contributions for employee and employer?
- State the balance sheet rule.
- A tool set costs GH¢2,400 and lasts 4 years with no end value. What is the monthly depreciation?
- Why must a certificate never be lent?
Appendix A · Fault-finding charts
Start at the top and follow yes or no. Each chart ends at a stop or a call. The CEWP does every test.
Ask a qualified expert. Never search for a fault by touching live parts. Every wiring fault is investigated and repaired by an Energy Commission-certified electrician (CEWP). For smoke or fire call 112; for burns or shocks see a doctor or nurse.
Chart 1: No power in the house
- Do the neighbours have power? No: it is the grid; tell the electricity company. Yes: go to 2.
- Is the prepaid meter out of credit or tripped? Yes: top up or report. No: go to 3.
- Is the main switch or the main breaker off? Yes: look for the cause first (see Chart 2), then switch on once. No: go to 4.
- Is a generator or changeover switch in use? Yes: check it is on GRID. No: stop; call the CEWP.
Chart 2: A breaker trips at once
- Does it trip with every load unplugged? Yes: the fault is in the fixed wiring or the breaker: isolate, lock and call the CEWP. No: go to 2.
- Plug in one load at a time. Which load trips it? That appliance has a fault: leave it unplugged.
- Trips with a heavy load only? Too much load for the circuit: go to Chart 3.
Chart 3: A breaker trips after minutes or hours
- Is the cable or breaker warm? Yes: overload or loose connection: switch off; the CEWP checks the load against the cable (Level 2 Appendices A to C).
- Do you see more than one big load on one circuit (several air conditioners, heaters)? Yes: split them onto separate circuits (a cable and breaker redesign by the CEWP).
- Did it begin after a new appliance? Yes: that appliance may be too big for the circuit.
Chart 4: The RCD trips
- Does it trip with everything unplugged? Yes: leakage in the wiring: call the CEWP.
- Does it trip only in rain? Moisture in an outdoor fitting or damaged cable: call the CEWP.
- Does it trip with one appliance only? That appliance leaks: replace or repair it.
- Does it trip at the same time each day? A heater, pump or air conditioner that starts then is leaking: note the time and the load.
Chart 5: Lights flicker
- Does it flicker when a heavy load starts? Possibly a loose connection or a shared circuit: call the CEWP.
- Do all lights in the street flicker? The grid: tell the electricity company.
- Does only one fitting flicker? Lamp or fitting: change the lamp with the circuit off; if it persists, call the CEWP.
Chart 6: A socket or plug is hot
- Is there a burning smell or smoke? Yes: switch off at the breaker if safe, leave, call 112.
- Is the plug loose in the socket? The socket's contacts are worn: stop using it; call the CEWP.
- Is the load near the plug's rating? Overload: use a smaller load or a better circuit.
Chart 7: A tingle or shock from metal
- Unplug at once and do not use it. Call the CEWP.
- Test every similar appliance with the CEWP: if all tingle, the earth has failed (Level 2, Unit 3).
- The house is unsafe until the CEWP clears it.
Chart 8: A burning smell
- Find where it is strongest without touching. Switch off at the breaker if safe.
- If smoke or flame: leave, call 112.
- If not: keep the circuit off and call the CEWP. Never switch back on to "see".
Chart 9: Low voltage (appliances weak or fridge struggles)
- Is it all the neighbours? Yes: the grid; report to ECG.
- Is it only your house? Check long thin cables and loose connections: the CEWP measures the voltage under load.
- Protect the fridge and TV with a stabiliser or guard as the CEWP advises (Level 2, Unit 6).
Appendix B · Defect catalogue and grading
A grading code makes a report clear. This is an idea adapted from the British inspection model (foreign): a Ghana code, if any, comes from the Energy Commission.
Ask a qualified expert. Grading and reporting defects on a real installation is for the certified electrician and inspector. This page teaches the idea.
| Grade | Meaning | Example | Action |
|---|---|---|---|
| C1 | Danger present: risk of injury | Exposed live conductors; metal case live | Make safe at once; tell the client in writing |
| C2 | Potentially dangerous | No earth on a metal-cased appliance circuit; no RCD where the CEWP requires one; thin cable on a big breaker | Urgent repair |
| C3 | Improvement recommended | Missing labels; old colours mixed with new | Repair when convenient |
| FI | Further investigation needed | A reading that cannot be explained | Investigate before certifying |
Frequent defects (international experience; Ghana frequency data not found)
No RCD where needed; old or damaged wiring; missing earthing or bonding; overloaded equipment; loose terminals; unlabelled circuits; mixed colours; unprotected outdoor fittings. (Foreign pattern; marked "from field experience" until De-Graft Afful's own list is added.)
Appendix C · Forms pack
Copy these onto A4. Each is a blank form you can fill.
Ask a qualified expert. Forms record work; they do not make unsafe work safe. The CEWP signs the safety, test and certificate forms.
1. Pre-start job checklist
- CEWP named; certificate seen; category
- Plan, points and loads read; materials checked against marks
- Isolation point identified; second supply (generator or solar) identified
- Ladders, PPE, lock-out kit, tester and proving unit on site
- Emergency plan told; first-aid kit placed
- Client told where the main switch is and that supply may go off
2. Site safety plan (one page)
Job; place; date; client; CEWP in charge; isolation plan; test plan; work at height; dust and noise; emergency; fire; tidy site; signature of CEWP; signature of supervisor.
3. Permit to work
| Field | Entry |
|---|---|
| Job and place | |
| Circuit or equipment | |
| Names of workers | |
| Isolated by (name) and time | |
| Proved dead by (name) and time | |
| Work permitted | |
| Valid from / to | |
| Returned by CEWP; locks removed; time |
4. Lock-out register
| Date | Circuit | Locked by | Time locked | Tested by | Time unlocked |
|---|---|---|---|---|---|
5. Toolbox talk log
| Date | Topic (task, danger, rule) | Given by | Names present | Signatures |
|---|---|---|---|---|
6. Daily site diary
Date; weather; workers present; work done; materials used; visitors; problems; instructions; signature.
7. Snag list
| No. | Room | Defect | Who fixes | Date fixed | Checked by |
|---|---|---|---|---|---|
8. Handover checklist and client pack
- All circuits tested, labelled and recorded; circuit chart fixed to the consumer unit
- Installation Completion Certificate (paper or ICCAPP token) given or applied for
- Test schedule copy handed over
- Warranty card with the period and what is covered
- Client shown the main switch, the RCD test button and the breakers
- Safety talk given: overload, extension leads, signs of danger
- Electrician's name and contact kept where the family can find them
9. Warranty card
Client; address; work done; date; warranty period (your promise); what is not covered (misuse, other trades, grid faults); signature.
10. Incident report
Date and time; place; people present; what happened; what was done; what was damaged; who was told; photos; signature.
11. Instrument calibration log
| Instrument | Serial or mark | Last checked | Next due | Checked by | Result |
|---|---|---|---|---|---|
12. ICC check list (before the CEWP applies)
- Visual inspection complete; test schedule complete and in limits
- Earth tested; RCD tested; circuit chart done
- Customer and premises details correct
- Inspector appointed through the Energy Commission route (the customer does not pay the inspector)
- Application route checked with the Energy Commission (ICCAPP or paper)
Appendix D · Quote pack
The numbers that win and keep work: survey, BoQ, mark-up and break-even, contract, payments.
Ask a qualified expert. Prices, tax and contract wording should be checked with an accountant, GRA and a lawyer. All figures here are examples.
Rate survey page (blank)
| Date | Source (shop or electrician) | Item or service | Price GH¢ | Brand or notes |
|---|---|---|---|---|
| Day rate, electrician | ||||
| Day rate, helper | ||||
| Price per light point | ||||
| Price per socket point | ||||
| 2.5 mm² cable, 100 yd |
Mark-up and break-even (worked example, example numbers)
Monthly fixed costs GH¢2,400 (rent, phone, transport, loans). A typical job has a price GH¢10,000 and direct cost GH¢7,000, so the contribution is 3,000, or 30% of the price. Break-even jobs per month = 2,400 ÷ 3,000 = 0.8 of a job, so the business needs a little more than 0.8 of such a job each month to cover fixed costs. Break-even sales = 2,400 ÷ 0.30 = GH¢8,000 a month.
Payment schedule (example)
| Stage | Share of price | On a GH¢10,000 job |
|---|---|---|
| Deposit on signing | 40% | GH¢4,000 |
| Materials delivered and first fix done | 30% | GH¢3,000 |
| Test and certificate | 20% | GH¢2,000 |
| Retention until snags fixed | 10% | GH¢1,000 |
The contract one-pager is in Unit 4. Quote layout: client, job, scope, price per stage, exclusions (for example the inspector's fee is not charged to the client), validity of the quote, signature.
Appendix E · Compliance calendar
What to do, and when, to stay legal and trusted.
Ask a qualified expert. Dates and renewals are set by the Energy Commission, GRA, the Assembly and the Registrar. Confirm each with the office. This is general information, not legal advice.
| Item | Rule or practice | Source or status |
|---|---|---|
| CEWP certificate | Examinations are held in sittings; the renewal period and fees were not found | Ask the Energy Commission |
| Apprentice registration | Master electricians register all apprentices with the Energy Commission | |
| ICC for each job | Apply before connection (app or paper: check) | |
| Periodic inspection for each customer | First 10 years after first use; then every 3 to 5 years to 30 years; then every 2 years | |
| Materials | Only GSA-compliant cables and accessories | |
| Tax, SSNIT and business renewals | Use the dates in Unit 6 and Unit 5 of this book | See those units |
| Instrument calibration | At the maker's interval; keep the log | Good practice |
Appendix F · Case files
Real stories teach better than rules. These are De-Graft Afful's own, unnamed.
Ask a qualified expert. Stories show what happened; they are not advice for your job. Use a qualified, certified electrician.
| Case | What happened | Lesson | Where in the books |
|---|---|---|---|
| 1. The house that burnt | Three air conditioners on one cable the size of the service cable | One small cable cannot carry three air conditioners | Level 1 Unit 2; Level 2 Unit 2; Level 3 Unit 2 |
| 2. The old house with the dead earth | Shocks from metal; new earth and wiring | A shock from metal means the earth has failed | Level 2 Unit 3 |
| 3. The fridge and low voltage | Fridges damaged when the supply drops; stabilisers now common | A cheap protector costs less than a new fridge | Level 1 Unit 6; Level 2 Unit 6 |
| 4. Too small, so it keeps tripping | Undersized cable overheats and trips | A breaker that keeps tripping is a warning | Level 1 Unit 1; Level 3 Unit 2 |
| 5. Pipes in the concrete | Conduits cast in clash with the civil work | Plan the conduit before the concrete is poured | Level 2 Unit 4; Level 3 Unit 4 |
More cases to add: shock cases, customer disputes, a client who refused a certified electrician [[FLAG: author to confirm: further stories]]. National fire figures are in Unit 2. Final fire reports for named incidents were not found, so none is used here.
Appendix G · Three-phase and small commercial reference
Houses use single-phase supplies. Small commercial buildings and larger loads use three-phase. This is a reference only; the first Ghana certification categories include Commercial and Industrial.
Ask a qualified expert. Three-phase work is for an Energy Commission-certified electrician with the right category. Voltages are higher and the faults worse. Supply details come from the electricity company.
| No. | Part | What it does | Safety rule |
|---|---|---|---|
| 1 | Phase busbars (brown, black, grey, L1, L2, L3) | Carry the three live phases | Live: never touch; international colours, Ghana to be checked |
| 2 | Neutral busbar (blue) | Returns the unbalanced current | Treat as live |
| 3 | Four-pole isolator | Switches all three phases and the neutral | The CEWP isolates here |
| 4 | Three-pole breaker | Protects a three-phase load | One handle for three phases |
| 5 | Single-pole breakers | Protect house-type loads on one phase | Spread loads over phases |
| 6 | Neutral bar | Collects neutrals | Live |
| 7 | Earth bar | Collects earths | Never disconnect |
| Topic | Fact (international, labelled) |
|---|---|
| Voltage | Typically 400 V between phases and 230 V phase to neutral (international; Ghana's value to be checked with the electricity company) |
| Power | P = √3 × line voltage × line current × power factor |
| Current | I = P ÷ (√3 × V × power factor): for 10 kW at 400 V and 0.8, I = 18.0 A |
| Load balancing | Share single-phase loads about equally across L1, L2, L3 so the neutral carries little current |
| When a house needs three-phase | Large motors, many air conditioners or a workshop; the electricity company decides. A 2022 circular's connection fee figure is dated: not given |
| Phase rotation | Motors run backwards if two phases are swapped; the CEWP checks rotation |
| Isolation | Use a four-pole isolator and prove all four conductors dead |
Appendix H · Standards crosswalk and update log
What each standard is for, how the books use it, and what changed since the last edition.
Ask a qualified expert. Whether an IEC or BS standard is adopted as a Ghana Standard must be checked at the GSA; legal wording must be checked by a lawyer.
| Standard | What for | Used in the books as |
|---|---|---|
| L.I. 2008 | Wiring regulations | Ghana law: who may wire; ICC; penalties |
| L.I. 2478 | Cables and accessories | Ghana law: materials |
| GS 1009 | Ghana wiring code | Named; not read |
| IEC 60364 / BS 7671 | International design rules | Labelled, for sizing and testing |
| IEC 60898 / 61008 / 61009 | MCB / RCD / RCBO | Labelled |
| IEC 60529 | IP codes | Labelled |
Update log
| Date | Change |
|---|---|
| 20 Nov 2026 (version 1.1.0) | Added reference appendices, labelled international tables, tools and items glossaries, field boxes; ICC app and standards-review notes added |
| Next review | After the Energy Commission publishes the revised wiring standards and the GS 1009 text is read |
Appendix I · Master glossary and index
One A to Z across the three levels. "L1 U2" means Level 1, Unit 2.
| Term | Meaning | Where |
|---|---|---|
| Amp | Unit of current | L1 U2 |
| BoQ | Bill of quantities | L3 U4 |
| Bonding | Joining metal parts to the main earth | L2 U3 |
| CEWP, CEWI | Certified electrician; certified inspector | L1 U1 |
| Consumer unit | The board of breakers | L1 U3 |
| Derating | Reducing a cable's rating for heat and grouping | L2 App C |
| Diversity | Not all loads run at once | L2 U2 |
| Earth | The safety path for fault current | L1 U2; L2 U3 |
| ECG, NEDCo | Electricity distribution companies in the south and north | L1 U1 |
| GSA | Ghana Standards Authority | L1 U3 |
| ICC, ICCAPP | Installation Completion Certificate; the Energy Commission app and token | L1 U1; L3 U3 |
| IP rating | Dust and water protection code | L2 App H |
| Isolate, lock out, test dead | The golden rule | L1 U1 |
| kWh | Unit on the meter | L1 U2 |
| L.I. 2008 / L.I. 2478 | Wiring regulations / cables regulations | L1 U1; L1 U3 |
| MCB, RCD, RCBO | Breakers | L1 U3; L2 App H |
| Margin, mark-up | Profit on price, profit on cost | L3 U4 |
| Polarity | Live and neutral on the correct terminals | L2 U5 |
| Power factor | How well an appliance uses current | L1 U2 |
| Prove, test, prove | Check the tester before and after | L1 U1; L2 U1 |
| SELV | Safety extra-low voltage | L2 App F |
| Surge | Short voltage rise | L2 U6 |
| TT, TN | Earthing systems | L2 App E |
| Voltage drop | Volts lost along a cable | L2 App B |
| Zs | Earth fault loop impedance | L2 App F |
Appendix J · Tools, items and business items glossary, with master index
This builds on Level 1 Appendix H and Level 2 Appendix N. Each item is named and defined. Local names for tools differ from town to town. Use the standard name given here when you order or ask for help, and show the picture.
Ask a qualified expert. Ratings are guides; the CEWP chooses the real items and the fire service advises on extinguishers.
| Name | Type | What it is and does | Size, type or rating | Also called |
|---|---|---|---|---|
| Barrier tape | Safety item | Marks off a danger area | Red and white | caution tape |
| Calibration log | Form | Record of instrument checks | A4 | instrument log |
| Certificate holder | Item | A folder for certificates | A4 | file |
| Circuit chart | Form | A list of circuits at the board | A4 | circuit schedule |
| Delivery note | Business item | Lists goods delivered | Book | waybill |
| Fire blanket | Safety item | Smothers small fires | 1 m × 1 m typical | - |
| Fire extinguisher | Safety item | Puts out small fires; type per the fire service | Ask GNFS | extinguisher |
| First-aid kit | Safety item | Dressings and gloves | Boxed | first aid box |
| ICC | Paper or token | Certifies a tested installation | Paper or ICCAPP token | completion certificate |
| Invoice | Business item | A bill | A4 | bill |
| Job costing sheet | Form | Costs and profit for one job | A4 | job card |
| Lock-out kit | Safety item | Padlock, tag, hasp, register | One per worker | lockout kit |
| Permit-to-work | Form | Written permission for defined work | A5 | work permit |
| Retention | Business term | Money held until faults are fixed | % of price | retainage |
| Safety signs | Safety item | Danger and "Do not switch on" signs | Standard colours | warning signs |
| Snag list | Form | Small faults to fix before handover | A4 | punch list |
| Tool crib register | Form | Tools signed out and in | A4 | tool log |
| Tool and instrument starter list | Form | The first purchases (Unit 5) | Price survey needed | - |
| Variation order | Business item | A written change to the work | A4 | change order |
| Warranty card | Business item | States the repair promise | A5 | guarantee |
Master tools and items index
| Item | Level 1 (Appendix H) | Level 2 (Appendix N) | Level 3 (Appendix J) |
|---|---|---|---|
| Breaker (MCB) | yes | yes (curves B, C, D) | - |
| Clamp meter | listed | yes | used in Unit 2 |
| Consumer unit | yes | - | three-phase board in App G |
| Earth electrode and chamber | yes | yes | - |
| Extension lead | yes | - | - |
| Fire extinguisher | yes | - | yes |
| Insulation tester | yes | yes | - |
| Lock-out kit | yes | yes | yes |
| Multimeter | yes | yes | - |
| Permit-to-work | - | yes | yes |
| RCD, RCBO | yes | yes | - |
| Surge protective device | yes | yes | - |
| Two-pole voltage tester | yes | yes | - |
| Warranty card | - | - | yes |
Appendix K · Top 30 mistakes
A poster page. These are mostly international-pattern mistakes; De-Graft Afful and your inspector can add Ghana examples.
Ask a qualified expert. Fixing any of these on an installation is for a certified electrician.
| # | Mistake | Risk | Fix |
|---|---|---|---|
| 1 | One thin cable for many loads | Fire | Separate circuits; right cable |
| 2 | Bigger breaker to stop tripping | Cable cooks | Find the overload |
| 3 | Unmarked cable | Hidden fault | Standard marks only |
| 4 | No earth or broken earth | Shock | Test and rebuild |
| 5 | No RCD where required | Shock | Fit as the CEWP decides |
| 6 | Loose terminals | Heat, arcing | Tighten and test |
| 7 | Mixed old and new colours, unlabelled | Wrong connections | Label and test |
| 8 | Cables under carpets or doors | Damage | Reroute |
| 9 | Indoor fittings used outdoors | Moisture faults | IP-rated fittings |
| 10 | Conduit through structural members | Weak structure | Plan with the engineer |
| 11 | Joins hidden in ceilings with no box | Fire | Accessible junction boxes |
| 12 | Cable too tightly bent | Damaged insulation | Gentle bends |
| 13 | Generator plugged into a wall socket | Back-feed kills | Changeover switch |
| 14 | Air conditioners on the lighting circuit | Overload | Own circuits |
| 15 | Spliced flex used as fixed wiring | Heat | Proper cable |
| 16 | Unprotected fridge on a weak supply | Compressor damage | Stabiliser or guard |
| 17 | Sockets near water | Shock | Keep to the zones |
| 18 | No circuit labels | Confusion | Label every circuit |
| 19 | Plug fuse too big | Lead overheats | Right fuse |
| 20 | Skipping the tests | Hidden defects | Test and record |
| 21 | Not proving dead | Shock | Prove-test-prove |
| 22 | Removing another's lock | Death | Never |
| 23 | Wet ladders and floors | Falls | Dry, held ladders |
| 24 | Poor earth in dry soil | Slow tripping | Test; more rods |
| 25 | Missing bonding of pipes | Shock | Bond |
| 26 | No inspection before connection | Unsafe supply | ICC process |
| 27 | Using a non-certified person | Fire and fines | Use a CEWP |
| 28 | No hand-over papers | Disputes | Handover pack |
| 29 | Overfilled conduit | Heat, hard pulls | 40% fill |
| 30 | Saying "certified" before you are | Illegal | Be honest |
Further reading and sources
Best next reads: the Energy Commission's electrical wiring pages and the certification and contractor notices; the GSA's notices on cables; the hub's Money Skills Level 2 and Entrepreneurial Thinking Level 2; a registered accountant for your first year of books.
What this module does not cover: how to wire, test or certify (the work of Energy Commission-certified electricians), contractor registration steps and fees (not found), the Energy Commission examination fees (not found), the text of L.I. 2008 and GS 1009, approved rates (no figures found), VAT on mixed supply jobs (ask GRA), public tenders (not verified), industrial work, and solar systems (see the hub's Solar Energy course).
Every source used in this manual is listed, with links, in the Teacher Copy.