← All training manualsLathe Machining and Making a Finished Piece Level 3 · read-onlyGet the PDF with Teacher Copy (GH¢50)
Level 3 · Advanced · CTVET formatTrainee Manual

Lathe Machining and Making a Finished Piece Level 3

From a drawing to a finished piece: plan it, make it, check it, assemble it, and build a business around it.

A lathe turning a brass shaft beside finished machined parts A centre lathe holds a brass shaft in a chuck with a cutting tool taking a cut and a curl of swarf falling. To the left stand finished parts: a stepped shaft, a bolt and nut, and a flanged bush. To the right, a small assembled screw clamp with a turned screw and handle, made from the machined parts, with a vernier caliper lying beside it. MACHINED PARTSTURN · FACE · THREADASSEMBLED PIECE
Trainee name
Training centre
Start date
Instructor
Prepared by De-Graft Afful · Version 1.0.0 · November 2026
01

About this module

At Level 3 you stop being only the person who cuts metal. You decide what to make, in what order, with what holding, to what accuracy, and how to price and sell it. You lead other people.

Who it is for. Trainees who finished Level 2 or can show equal skill, aged 18 or over. At this level you work with little supervision, solve non-routine problems and supervise others. In Ghana's TVET qualifications framework, National Proficiency II leads on to National Certificate I; this module is comparable in level but is not a CTVET curriculum and claims no accreditation.

CTVET status. This module is not accredited. Ask CTVET or the regional Ghana TVET Service office about official standards for Welding and Fabrication or machining qualifications.

Bridge from Level 2: what you already know

  • You cut a metric thread, turn a taper, bore and ream holes, and use the drilling machine, mill and shaper (under supervision).
  • You use speed and feed, tool life and a maintenance schedule to get the best from a machine.
  • You know limits and fits (the 40 mm H7/g6 example), templates and pattern allowances.
  • You made the screw and nut, and assembled the pad, handle, screw and nut.
  • You can price a batch with a machine-hour cost.

How the module works

Units 1 to 4 are advanced technical work. Units 5 to 7 are the business units: establish, bookkeeping, grow. Every unit has a Tools and items table; every machine has a labelled diagram, a parts table and a SAFETY PROTOCOL box. The back of the book has appendices with quick cards, forms, mistake catalogue and index. International standards are labelled "international" and must be checked against the Ghana Standards Authority text.

02

Unit 1 · From design to drawing and a process plan

A good drawing is a promise: if you make it like this, it will fit. A good process plan is the same promise in order. Both are done before the first cut.

Competency standard

Learning outcome Performance criteria — the trainee…
1.1 Read a drawing fully reads views, sections, dimensions, tolerances, material and finish
1.2 Make a drawing produces a dimensioned two-view drawing of a simple part
1.3 Choose tolerances applies general tolerances and individual tolerances correctly
1.4 Make a bill of materials lists every part, material and quantity
1.5 Plan the process writes an operation sequence with machines, tools and checks

Range. Turned and drilled parts; the clamp sub-assembly and frame. Evidence. A drawing set; bill of materials; process plan.

Ask a qualified expert. Parts that carry loads, hold pressure or are used on vehicles, lifts or structures need an engineer: ask a GhIE-registered engineer. International standards in this unit must be checked against the Ghana Standards Authority text. For any injury, see a doctor or nurse.

Reading and making a drawing

A working drawing shows the shape in views (front, top, side), with dimension lines, a title block (name, material, scale, units, general tolerance, drawn by, date) and, for an assembly, a bill of materials (BOM) with part numbers.

Drawing rules.

  • Draw each part once, in the position it will be machined.
  • Put each dimension once; avoid a closed chain of dimensions (you cannot meet all of them).
  • Use datum surfaces: the faces from which you measure.
  • Show sections for hidden detail; show centre lines for round parts.
  • Write material and finish in the title block.

The clamp screw drawing (worked example). Part 3, screw: mild steel Ø12 × 140 mm; M12 × 1.75 thread for 100 mm; Ø10 × 8 spigot; Ø6 cross-hole in the head at 10 mm from the end; chamfers 1 × 45 degrees; general tolerance ISO 2768-m (international).

Tolerances: general and individual

ISO 2768-1 general tolerances: for sizes over 6 to 30 mm, class m is ±0.2 mm, class f ±0.1 mm; over 30 to 120 mm class m is ±0.3 and f ±0.15. ISO 2768-2 has been withdrawn and replaced by ISO 22081:2021. Individual tolerances (for example Ø12 h6 or Ø12 H7) go beside the size for fits. Tighter is dearer: each step of tighter tolerance adds time, inspection and scrap, so tolerance only what the function needs.

Tolerance stack-up (worked example, checked by script). Three parts, each ±0.1 mm, are stacked in a line. Worst case the total is ±0.3 mm. A statistical (root-sum-square) estimate is √(0.1² + 0.1² + 0.1²) = ±0.173 mm. Use worst case for safety-related fits; ask a GhIE-registered engineer for design work.

Choosing materials

Material Use in a machine shop Notes
Mild steel Screws, pins, frames, general parts Cuts easily; not hard; rusts: oil or paint
Brass Bushes, nuts, bearings, fittings Very free-cutting; high speed (90 to 210 m/min HSS in the source table)
Aluminium Light parts High speeds (122 to 305 m/min HSS); use sharp tools
Cast iron Machine bodies, pulleys Dusty; cut dry; slow speeds (medium grade 1 to 2 m/min in the source table; check)
Stainless steel Food and corrosion parts Work-hardens; sharp tool; slow speed; ask the supplier

Ghana prices for bar stock are not found reliably: all costs in this book are labelled "example".

Bill of materials and process plan

BOM for the screw bench clamp (example).

Part no. Name Material and size Qty
1 Frame Mild steel flat bar 40 × 10, cut and shaped (or machined from block) 1
2 Nut boss Mild steel Ø30 × 25, drill 10.2, tap M12 × 1.75 1
3 Screw Mild steel Ø12 × 140 1
4 Pad Mild steel Ø18 × 12 1
5 Handle Mild steel Ø8 × 120 1
6 Pin Mild steel Ø6 × 20 (retains the pad) 1

Process plan for the screw (part 3).

Op. Operation Machine and tool Speed (rev/min) Check
10 Cut bar to 145 Saw (see Basic Welding for saw safety) Length
20 Face one end; chamfer Lathe, facing tool 398 (Ø20 reference; use 265 for Ø30 bar) Flat
30 Turn Ø12 for 100 mm, with a Ø10 spigot Lathe, roughing then finishing 663 (Ø12 at 25 m/min) Ø12 − 0.1
40 Cut the M12 × 1.75 thread; run-out groove 60 degree tool 100 Nut gauge
50 Reverse; face to length; turn the Ø10 spigot Lathe 796 Length 140
60 Drill the Ø6 cross-hole Drilling machine and vice 1,326 Position
70 Deburr; oil File Visual

(Speeds at 25 m/min worked by script: 12 mm gives 663; 10 mm gives 796; 6 mm gives 1,326.) The operation times add up to the job time used for the quote (Unit 6).

Tools and items for Unit 1

Item What it is and its use Size or type Also called
Drawing board and set square Flat board and 45 and 60 degree triangles for drawing A3 Drawing table
Compasses and dividers Draw circles; step off distances
Scale rule Rule with scales (1:2, 1:5) 300 mm
CAD software (free or paid) Computer drawing Computer-aided design
Title block and BOM sheet A standard page with a table for part list
Datum surface The face from which sizes are measured
Gauge blocks Blocks of exact size used to set and calibrate Slip gauges
Height gauge Measures and scribes heights 300 mm

Draw and plan

  1. Read the clamp screw drawing aloud: list every size, tolerance and the material.
  2. Draw the clamp pad and the handle with a title block.
  3. Make the BOM for the whole clamp.
  4. Write a process plan for the screw with speeds and checks.
  5. Compare your plan with a classmate's and list differences.

Plan and tolerance

(a) The speed for turning the Ø12 part at 25 m/min? (b) A ±0.2 mm general tolerance applies to a 20 mm size: lowest and highest? (c) Four parts each ±0.1 mm are stacked: worst-case total? RSS?

Draw something

Draw a simple turned part from your own life (for example a handle or bush) with a title block and BOM. Photograph it.

Check yourself

  1. What does a title block contain?
  2. Why avoid a closed chain of dimensions?
  3. What is "tighter is dearer"?
03

Unit 2 · Jigs, fixtures and cutting to size

A jig makes the machine remember. Once it is made, every part is the same.

Competency standard

Learning outcome Performance criteria — the trainee…
2.1 Choose work-holding selects a chuck, centres, faceplate, vice or jig for a job
2.2 Make a simple jig makes and uses a drill jig
2.3 Cut to size cuts bar to length and size with allowance and checks
2.4 Set up a batch writes a set-up sheet and a first-off check
2.5 Count the saving works out the time saved by a jig

Range. Batches of 10 to 100 parts. Evidence. A jig; a set-up sheet; first-off record.

Ask a qualified expert. Fixtures that hold heavy parts, and any lifting aid, need a GhIE-registered engineer's design. Ask a qualified safety officer about guards for any jig used at speed. Act 328 requires trained or supervised operators of dangerous machines. For any injury, see a doctor or nurse.

What jigs and fixtures do

A jig holds the work and guides the tool (a drill jig guides the drill through a hardened bush). A fixture holds the work in a fixed position but does not guide the tool (a milling fixture). Both give: the same position every time, less marking out, less measuring, faster set-up and fewer errors.

A drill jig with parts numbered Side view of a simple drill jig: base plate, locating stop, work, hardened drill bush, top plate, clamp screw and drill. The jig positions every part in the same place so holes are drilled in the same position each time. Numbers match the parts table. 12345678Simple plate drill jig (schematic)
A simple plate drill jig with its parts numbered. The numbers match the table.
No. Part What it does Safety rule
1 Base plate The flat foundation that the work and stops are fixed to Keep flat and clean; no burrs
2 Locating stop Sets the work in the same place every time Check it is tight and square
3 Work The part being drilled Clamp firmly
4 Drill bush A hardened steel sleeve that guides the drill Replace when worn; do not use a bent drill
5 Top (bush) plate Holds the bush above the work Keep the work free of swarf
6 Clamp screw Pushes the clamp pad onto the work Tighten by hand; do not use a pipe on the key
7 Drill The cutting tool Remove the chuck key; use the right speed
8 Clamp pad The face that presses on the work Replace when worn

SAFETY PROTOCOL: Using a drill jig and fixtures

Before

  • Glasses on, no gloves, no loose sleeves, hair tied. Jig bolted or clamped to the table so it cannot spin. Work clamped inside the jig. Chuck key out. Speed set.

While

  • Do: drill slowly through the bush; withdraw to clear swarf; oil the drill; check the stop is against the work.
  • Do not: hold the jig by hand; wear gloves; use a bent drill; force the feed.

After

  • Switch off; wait to stop; isolate; brush swarf clear of the jig; inspect the bush; store the jig dry and oiled.

Emergency

  • Stop, isolate; first aid for cuts and eye injury; call 112 for a serious injury; see a doctor or nurse.

Lathe work-holding for batches

Method Best for Note
Three-jaw chuck Round bar Quick; slightly less accurate
Four-jaw chuck Square or odd work, exact centring Set true with a dial indicator
Soft jaws Delicate or second-operation work Machine the jaws to the part
Collets Small round parts in batches Accurate, no marking
Between centres Long shafts Needs centre holes; driven by a carrier
Steady rest Long slender work Adjust gently; oil the pads
Faceplate Large or irregular work Balance and guard
Mandrel Parts bored first, then turned outside True to the bore

Cutting to size

Allowance. Cut bar slightly longer than the finished size: for a 100 mm part to be faced both ends, saw at about 103 mm (about 1.5 mm each end for facing: example). Round bar is often not true size (mill finish): measure with a micrometer before you plan. First-off: make and measure one part fully before the batch.

Saving with a jig (worked example, checked by script). Marking out and centre punching each hole by hand takes 3 minutes; with a drill jig it takes 0.5 minutes, saving 2.5 minutes per part. At the example machine-hour cost of GH¢30.42, that is 2.5 ÷ 60 × 30.42 = GH¢1.27 per part. If the jig costs (example) GH¢150 to make, it pays for itself after 150 ÷ 1.27 = about 118 parts.

Tools and items for Unit 2

Item What it is and its use Size or type Also called
Drill bush (hardened) A hardened steel sleeve that guides the drill Match drill size Jig bush
Locating pin or stop Hardened pin or block that positions the work Locator
Toggle clamp A fast lever clamp Quick clamp
Collet set Sleeves that grip small round parts
Soft jaws Jaws made of soft steel to be machined to shape
Steady rest Supports long slender work
Lathe carrier (dog) Drives work held between centres Lathe dog
Faceplate Plate on the spindle for large or odd work
Mandrel A rod on which a bored part is held for turning Arbor

Make and use a jig

  1. Design a drill jig for the clamp handle's Ø6 cross-hole in the screw head. Sketch it, list the parts and sizes.
  2. Make the jig base, stop and bush plate; fit the bush.
  3. Drill five screws using the jig; measure each position.
  4. Write a set-up sheet and a first-off check.
  5. Work out the time saved.

Batch saving

A jig takes 20 minutes less in marking per 40 parts. (a) The saving per part? (b) The money saved for 40 parts at GH¢30.42 an hour? (c) The jig cost (example) is GH¢150: how many parts to pay it back at 2.5 minutes saved per part?

Jig sketch

Sketch a jig that could speed a repeat job in your own area (for example drilling washers or cutting keyways). List the parts and what each does.

Check yourself

  1. What is the difference between a jig and a fixture?
  2. Why measure round bar before you plan?
  3. What does first-off mean?
04

Unit 3 · CNC lathes and mills: an overview

A CNC machine does what the program says, exactly and repeatedly, even if the program is wrong. The skill is in the preparation and the checking.

Competency standard

Learning outcome Performance criteria — the trainee…
3.1 Explain CNC explains how a CNC machine differs from a manual one
3.2 Name the parts names the parts of a CNC lathe and their safety rules
3.3 Read a simple program reads a short turning program line by line
3.4 Decide to buy, outsource or do by hand compares the three with numbers
3.5 State the safety rules lists the safety rules and never bypasses an interlock

Range. Overview only; no operation without a trained operator. Evidence. Labelling test; program reading; a buy-or-outsource calculation.

Ask a qualified expert. Operating a CNC machine requires training by the supplier or a qualified machinist and a licensed electrician for power. Ask a GhIE-registered engineer about installation and a qualified safety officer about guards. Never bypass a door interlock. Act 328 requires dangerous machines to be run by trained or supervised people.

What CNC is

CNC (computer numerical control) machines move their slides by motors under a program of coded instructions. The most widely used language is G-code; manufacturers add their own variations, so a program for one controller may not run on another. A KNUST study of Ghana's metal fabrication sector found CNC machines absent and no computer systems for design or manufacturing in the firms that replied; it is older, so check today's situation.

Photograph of a small CNC training latheA real small computer-controlled lathe on a workbench. A clear curved guard encloses it. Inside are a green headstock with a three-jaw chuck on the left, a dark ribbed workpiece held in the chuck, a tool slide with a drill chuck on the right, and swarf in the tray. A red emergency stop button is at the lower right.1234567
A real small computer-controlled (CNC) lathe used for training, with its clear guard closed. Numbers on the picture match the table below. (Photo: Nottingham Hackspace, CC BY-SA 2.0; Source: Photo CNC Lathe)

Photo credit: Nottingham Hackspace, CC BY-SA 2.0. Cropped, resized and numbered for this manual.

No. Part What it does Safety rule
1 Guard enclosure (clear cover) Keeps chips and coolant in and your hands out Never run the machine with the guard open or removed
2 Headstock The housing that holds the spindle and turns the chuck under program control Never open the guard while the spindle turns
3 Chuck Grips the work; the dark ribbed workpiece is held in it Check the grip before every run
4 Slide (marked X and Z) Carries the tool holder; moved by motors along the X and Z directions Keep hands out of the travel area
5 Tool holder Holds the cutting tools and a drill Check the tool is tight and its offset is set
6 Emergency stop The red button that stops all motion at once Know where it is; test it daily
7 Chip tray Collects the swarf (metal chips) Clear swarf only when the machine is stopped and the program is finished

This is a small training machine. A workshop CNC lathe is much bigger and has a turret that holds several tools, but the parts and the rules are the same.

A CNC lathe with parts numbered Front view of a CNC turning centre: spindle and chuck, workpiece, turret with tools, slide, tailstock, control panel, emergency stop, door with interlock and window, chip tray and base. Numbers match the parts table. 1234567891011CNC lathe with the guard door shown cut away (schematic)
A CNC lathe with its parts numbered. The guard door is shown cut away. The numbers match the table.
No. Part What it does Safety rule
1 Headstock and spindle Drives the chuck under program control Never open the door while it turns
2 Chuck Grips the work, power operated Check the grip pressure and jaws before each run
3 Workpiece The bar or part being cut Check it is clamped and not too long
4 Turret and tools Holds several tools and indexes to the next Keep clear when it indexes; check tool offsets
5 Slides Move the turret in X and Z by motors Keep hands out of the travel area
6 Tailstock Supports long work, sometimes program-controlled Check the pressure and position
7 Control panel Screen and keys where the program is loaded and run Prove out a new program in single-block mode with the feed slowed
8 Emergency stop Stops all motion at once Know where it is; test it daily
9 Door and interlock The interlock stops the machine when the door opens Never bypass or defeat it
10 Guard enclosure Contains chips and coolant Keep it closed and in place
11 Base and chip tray Carries the machine and collects swarf Clear swarf only when stopped

A turning program, line by line (generic example)

This is a generic Fanuc-style teaching example, not for any machine. Dialects differ: check your controller manual.

Line Meaning
O0001 (PIN D16 L30) Program number and comment
G21 G40 G80 G99 Metric units, cancel tool radius compensation, cancel cycles, feed per revolution
G50 S3000 Limit the spindle to 3,000 rev/min
T0101 Select tool 1 with offset 1
G96 S150 M03 Constant surface speed 150 m/min, spindle on clockwise
G00 X22.0 Z0.0 Rapid to a point near the end of the bar
G01 X-1.0 F0.1 Feed across the end to face it
G00 X16.0 Z2.0 Rapid to the turning diameter, 2 mm clear
G01 Z-30.0 F0.15 Turn 30 mm long at 0.15 mm per revolution
G00 X22.0 Retract
G00 X100.0 Z100.0 Go to a safe change position
M05 Spindle off
M30 End of program and rewind

In a typical lathe program X is a diameter. G00 is a rapid move and G01 a straight cutting move (the codes G00 and G01 are the same on most controllers; check yours). Worked time (checked by script): at 150 m/min a Ø16 part runs at 2,984 rev/min; at 0.15 mm/rev the feed is 448 mm per minute, so 30 mm takes 4.0 seconds. Carbide tools suit these speeds (a catalogue example for medium-carbon steel is 150 m/min, 0.12 mm/rev, wet).

Prove-out. Run a new program with the feed override low, single-block, with the tool offsets checked and a hand on the feed hold, with the door closed, before the first part. Never cut the first part at full speed.

Preparing a file for a CNC cutting service

When you outsource, give the machine shop a clear drawing and a model file (DXF for flat profiles; STEP for 3-D parts), material and thickness, quantity, tolerances and finish. Ask what tolerance and finish they can hold. No Ghana CNC machine-shop service was found by this research: do not name any firm, and ask in the area (Suame Magazine and its machine-tool members are a place to start for conventional machining).

Outsource, buy or do by hand: a worked example

All figures are examples. A shop needs 500 small pins a month. Turning them by hand costs about GH¢25 a part including labour. An outsourced CNC service quotes GH¢8 a part. A bought CNC lathe (example price GH¢250,000) would also make them at about GH¢8 a part in running cost. The saving against hand turning is GH¢25 − GH¢8 = GH¢17 a part, or GH¢8,500 a month at 500 parts. Payback on GH¢250,000 is 250,000 ÷ (17 × 500) = 29.4 months (checked by script). That ignores finance cost, training, tooling and breakdowns, so the real payback is longer, and buying gives no extra saving over outsourcing at the same GH¢8 a part. Outsourcing is the wiser first step until volume is steady.

Tools and items for Unit 3

Item What it is and its use Size or type Also called
CNC lathe A turning machine driven by a program Turning centre
CNC mill A milling machine driven by a program Machining centre
Carbide insert A replaceable hard cutting tip Tip
Tool offset A number telling the control where the tool tip is
G-code The language of the program NC code
DXF file A 2-D drawing file used for profile cutting
Probe A touch sensor to set tool or work positions
Coolant Fluid that cools and washes chips

Read a program

  1. Label a blank copy of the CNC lathe diagram.
  2. Read the example program aloud, line by line, and explain each line.
  3. Calculate the spindle speed for a Ø20 bar at 150 m/min and the time for a 50 mm cut at 0.15 mm/rev.
  4. State three rules before running a first part.
  5. Write a request to a CNC service listing drawing, file, material, quantity and tolerance.

CNC calculations

(a) The spindle speed for Ø20 at 150 m/min? (b) The time to turn 50 mm at 0.15 mm/rev at that speed? (c) The saving per month for 300 parts if outsourcing costs GH¢10 and hand turning GH¢22 (examples)?

Buy or outsource

List three jobs in your area that need hundreds of identical parts. For each, say whether you would outsource, buy or do by hand, with one reason.

Check yourself

  1. What is G-code?
  2. Why never bypass a door interlock?
  3. Why prove out a new program slowly?
05

Unit 4 · Quality, supervising, and assembling the finished piece

Quality is not luck. It is a plan: check at three stages, record, fix. Supervising is the same plan applied to people. Then you put everything together.

Competency standard

Learning outcome Performance criteria — the trainee…
4.1 Inspect at three stages inspects first-off, in-process and final
4.2 Calibrate checks instruments against a reference
4.3 Handle non-conformance records, segregates, reworks or scraps
4.4 Supervise and train briefs, trains and checks an apprentice
4.5 Make the frame and assemble makes the frame, assembles all six parts and tests the clamp
4.6 Finish and hand over finishes, inspects, records and presents the piece

Range. The complete screw bench clamp. Evidence. Inspection records; calibration log; the finished clamp; supervising notes.

Ask a qualified expert. The clamp is a light bench tool, not a lifting device and not for loads that could hurt someone if they fail: ask a GhIE-registered engineer for any load-bearing design. Welding the frame is covered by the Hub's Basic Welding and Fabrication and needs a trained welder; ask a qualified safety officer about hot work. For tax, law, injury and similar advice ask the right professional; for any injury see a doctor or nurse.

Inspection at three stages

Stage When What
First-off After the first part Check every dimension on the drawing
In-process During the batch Check the key dimensions every 5 to 10 parts, and after a tool change
Final Before delivery Check all dimensions, function, finish, count; sign the record

Use the instrument whose resolution is at least ten times finer than the tolerance (a ±0.1 mm tolerance needs a 0.01 mm micrometer, not a rule), a widely used rule of thumb (check with your quality instructor).

Calibration

A measuring instrument must be checked against a reference: a micrometer against gauge blocks or a known standard; a caliper against a gauge block or a ring gauge. Record the date, the reading, the difference and who did it; remove from use any instrument out of tolerance. Do it every three months for a busy shop (a practical interval; check with your instructor) and after any drop.

Non-conformance

When a part is wrong: stop, tag it, segregate it, find the cause, decide (rework, accept with permission, or scrap), record and fix the cause. Never let a bad part mix with good ones. Typical causes: tool wear, wrong set-up, misread drawing, material error, instrument error.

Safety leadership and supervising

  • Act 328 requires dangerous machines to be operated only by people who are instructed and trained or supervised (section 36), so as a supervisor you must instruct and watch.
  • Train an apprentice in four steps: tell, show, let them try, check. Give one task at a time; correct errors kindly and at once.
  • Brief before work: the job, the hazards, the protocol, the checks. Walk the shop each day for housekeeping and guards.
  • Report every near miss. Stop work on anything unsafe.
  • Nobody under 18 does hazardous work.

Making the frame

The frame is the C-shaped body that carries the nut boss. Design (example, light bench use): mild steel flat bar 40 × 10 mm. Mark the shape with a template (Level 2). Cut to size by saw, drill and file; bend or fabricate the C shape; fix the machined nut boss (part 2) in position by a welder or with fixing screws; check the screw axis is square to the pad face. Welding is by a trained welder; see the Hub's Basic Welding and Fabrication for the welding and its safety. Check squareness with an engineer's square and a test bar through the boss.

Assembly and test

Assemble, test and finish the clamp

  1. Check every part against the BOM and inspection records. Reject any part that fails.
  2. Deburr all edges; clean all threads; oil.
  3. Fit the nut boss to the frame (weld by a trained welder, or by fixing screws).
  4. Thread the screw through the boss and check it turns smoothly with no binding.
  5. Fit the pad on the spigot with the pin; check it swivels without rocking.
  6. Fit the handle through the cross-hole; check it slides and does not fall out.
  7. Test: clamp a block of known thickness; turn the screw; check it grips without slipping, with no damage to the thread. Do not test it with a load that could hurt anyone or break it.
  8. Finish: wipe with oil, or prime and paint the frame (see Basic Welding for surface preparation).
  9. Measure the clamp opening and record. Photograph. Complete the inspection record and sign.

SAFETY PROTOCOL: Assembly, testing and finishing

Before

  • Glasses; no gloves near rotating tools; hair tied. Parts clean and burr-free. Vice or bench clamp used to hold the work. Paint and solvents only in a ventilated area, away from flame.

While

  • Do: assemble by hand first; use the right spanner; check pinch points; wear gloves only for handling sharp or hot edges away from machines; keep a first-aid box close.
  • Do not: force parts; use a hammer on threads; test with a load that could break or fling parts; use solvent near a hot grinder or a welder.

After

  • Put away tools; clean the bench; dispose of rags safely; store paint closed; record faults.

Emergency

  • Pinched or cut finger: stop, press with a clean cloth, first aid; see a doctor or nurse. Fire: isolate power, use the extinguisher if it is safe, and call 112. Serious injury: call 112.

Final inspection record (blank form)

Check Drawing Actual Pass?
Screw thread (nut gauge) M12 × 1.75
Screw length 140
Pad diameter 18 ± 0.2
Handle length 120 ± 0.5
Clamp opening per design
Function (turns, grips)
Finish no burrs, oiled or painted

Tools and items for Unit 4

Item What it is and its use Size or type Also called
Gauge blocks Blocks of exact thickness to calibrate and set Metric set Slip gauges
Ring and plug gauges Fixed gauges for threads and holes M12 Go / no-go gauges
Height gauge and surface plate Measure and mark heights from a flat datum
Dial indicator Checks run-out and flatness 0.01 mm Dial gauge
Non-conformance tag Red tag for rejected parts Reject tag
Calibration log A book for instrument checks
Training checklist A list of skills an apprentice must show
Spanners and hex keys For assembly Wrenches
Oil, primer and paint Finish

Quality numbers

(a) A tolerance is ±0.1 mm: the finest instrument resolution you need under the ten-times rule? (b) A micrometer reads 25.012 mm on a 25.000 mm gauge block: the error? (c) In a batch of 100 pins, in-process checks every 10 parts: how many checks?

Supervising plan

Write a one-page plan to train an apprentice to measure with a caliper: steps, safety points and a check.

Check yourself

  1. Name the three stages of inspection.
  2. What do you do with a non-conforming part?
  3. What are the four steps for training an apprentice?
06

Unit 5 · Establish your machine shop

Before you hire a worker or sign a contract, make the business real: register it, know your taxes and permits, count the start-up cost and write the plan.

Competency standard

Learning outcome Performance criteria — the trainee…
5.1 Choose a legal form compares business types and registers one
5.2 Meet tax and permit duties lists tax, VAT, Assembly, fire, factory and environment duties
5.3 Plan the start-up budgets premises, equipment and working capital
5.4 Employ fairly applies SSNIT, PAYE and Labour Act basics
5.5 Find finance names finance options and prepares a loan pack

Range. Own business plan. Evidence. Registration checklist with costs; start-up budget; payroll sheet.

Ask a qualified expert. This is general information, not legal advice. Ask a qualified lawyer before you act on any registration, licence, contract or employment matter. For tax, VAT, PAYE and SSNIT, check with GRA or a qualified accountant. Ask a licensed insurer or your bank before you take a loan or insurance. Ask a GhIE-registered engineer about premises, power and machine installation, and the Ghana National Fire Service about fire. Fees were read on official pages in October 2026 and may have changed: check before you pay.

Choose a legal form

Type ORC fee (2026) Notes
Business name (sole proprietor) GH¢130; GH¢70 renewal Most workshops start here; owner liable for debts
Partnership GH¢270; GH¢100 renewal 2 to 20 partners; written agreement
Company limited by shares GH¢585 + capital duty For bigger firms, tenders and outside investors; yearly returns
Company limited by guarantee GH¢490 For non-profit training workshops

Annual returns cost GH¢175 a year, and late filing is charged. Cooperatives: the route is not verified; ask the Department of Cooperatives or ORC. The 1 percent capital duty on a company's stated capital is not settled here: ask ORC.

Tax and permits

  • Tax number: your Ghana Card number is your tax number (TIN). Companies get a TIN after ORC registration.
  • Income tax: a sole trader with business income only, not registered for VAT, may use the Modified Taxation Scheme: turnover up to GH¢20,000 fixed instalments; between GH¢20,001 and GH¢750,000 about 3 percent of turnover (the ceiling was raised from GH¢500,000 by the Income Tax (Amendment) Act 2026 (Act 1178); GRA's page still showed the older ceiling in October 2026). Companies pay 25 percent in general; for manufacturers in regional capitals other than Accra and Tema the rate is 18.5 percent. Whether your machine shop counts as a manufacturer is for a qualified accountant to say.
  • VAT: 15 percent VAT plus NHIL and GETFund levies, about 20 percent in all from January 2026; for goods the registration threshold is GH¢750,000 turnover; for services there is no turnover threshold and registration is within 30 days of starting. A machine shop supplies goods and services: ask GRA or a qualified accountant which applies to you.
  • Records: keep records in Ghana for at least 6 years.
  • Assembly permit: in Sekondi-Takoradi, a metal fabricator paid GH¢200 a year under the 2025 fee resolution. Check the fee for a machine shop and the date; the permit is due by 31 March.
  • Fire: non-residential premises generally need a fire certificate under Ghana's fire regulations, applied for through the Ghana National Fire Service's online system. Fees and the workshop checklist are not verified.
  • Factories Inspectorate: the Factories Act says occupiers of factories register them with the Chief Inspector, and the registration certificate is annual and expires on 31 December. Whether a small shop counts as a factory is not clear from the Act alone: ask the Department of Factories Inspectorate (not verified).
  • Environment: the Environmental Protection Act 2025 (Act 1124) and its assessment regulations now apply; whether your shop needs an EPA permit is not verified: ask the EPA office in Takoradi.
  • Insurance: only buy from insurers licensed by the National Insurance Commission. Which covers are compulsory is not verified.

Premises and start-up budget

Location settings that give good returns:

  • Near vehicle repair clusters, farms with machinery, welders and fabricators who need turned parts.
  • Near bar-stock suppliers and hardware shops.
  • A dry shop with a level floor, good light and safe power (ask an Energy Commission-certified electrician); space for stock and finished parts.
  • Away from houses where noise and swarf would disturb neighbours; a visible roadside with a place for customers to park.

Example start-up budget (all numbers are examples, not quotes).

Item Example GH¢
Second-hand centre lathe 20,000
Drilling machine and bench grinder 4,500
Measuring tools (calipers, micrometers, gauges) 3,500
Cutting tools, drills, taps, dies 2,500
Workbench, vice, safety equipment 2,000
Rent for 3 months 2,100
Opening bar stock 7,000
Registration and permit 500
Working cash reserve 6,000
Total 48,100

(Check: 20,000 + 4,500 + 3,500 + 2,500 + 2,000 + 2,100 + 7,000 + 500 + 6,000 = 48,100.)

Employing staff

  • Minimum wage is GH¢21.77 a day in 2026.
  • SSNIT: worker 5.5 percent plus employer 13 percent, paid within 14 days after month-end; register workers on hiring. On an example wage of GH¢1,500: worker GH¢82.50, employer GH¢195.00, total GH¢277.50.
  • PAYE: the first GH¢588 a month is tax-free; due by the 15th.
  • Written contract for six months or more; written terms within two months; 15 working days' paid leave.

Finance and support

  • The 2026 Budget names programmes such as the National Apprenticeship Programme and Adwumawura. Details of how a small machine shop accesses them are not verified.
  • The Ghana Enterprises Agency has Business Advisory Centres in Takoradi and nearby districts.
  • Ghana EXIM supports SMEs and exporters. The Bank of Ghana policy rate was 14 percent.
  • Prepare a loan pack: one-page plan, 12-month cash forecast, three months of records, quotes for equipment, ID and registration documents.

One-page business plan

Write: what you make and repair; who buys; where you work; what machines and money you need; prices (machine-hour cost); first three customers; monthly costs; monthly sales needed to break even (Unit 6); permits; risks and who you will ask.

Accessibility

The Persons with Disability Act 2006 bans job discrimination. Drawing, process planning, quoting, inspection records, customer care, CNC programming and subcontract ordering are desk work suited to many wheelchair users. Deaf workers need visual machine signals and written permits. Blind workers should not operate machines. The share and rules of the Assemblies' disability fund are not verified: ask the Assembly. Ask a qualified occupational therapist or safety officer about workstation adjustments.

Register on paper

  1. Choose a legal form and explain why.
  2. Make a registration and permit checklist with costs and offices.
  3. Draw up a start-up budget with your own example costs.
  4. Work out one month's payroll for one worker (use the figures above; mark examples).
  5. Write your one-page plan.

Visit the offices

Find out where in Takoradi you would register a business name, get a permit and ask about a fire certificate. Write the office, what to carry and what to ask (no phone numbers).

Check yourself

  1. Name two tax or permit duties for a machine shop.
  2. What do SSNIT contributions add up to for employee plus employer?
  3. Why keep records for 6 years?
07

Unit 6 · Bookkeeping and accounting for a machine shop

Every job uses bar stock, machine time and labour. Count every cedi, job by job, or you will not know which work pays and which only keeps the lathe turning.

Competency standard

Learning outcome Performance criteria — the trainee…
6.1 Keep daily books keeps cash, MoMo and bank, job cards, purchases and stock records
6.2 Produce statements prepares a monthly profit and loss and balance sheet, and profit per job
6.3 Control cash reconciles MoMo and bank, and forecasts cash
6.4 Price and break even works out machine-hour cost, margin, mark-up and break-even

Range. One month of real or example jobs. Evidence. Books; trial check; statements; reconciliation; break-even.

Ask a qualified expert. This unit teaches record-keeping skills with example numbers. It is not tax, legal or accounting advice. Check with GRA or a qualified accountant before you file any tax return, register for VAT, or choose a tax scheme. Ask a qualified lawyer about contracts and debts, and your bank before you borrow.

The records

Record What it shows
Job card Customer, job, material, machine hours, deposit, balance, date delivered
Cash book Every cedi in and out, with the balance
MoMo and bank book Mobile money and bank in and out; checked monthly
Purchases book Bar stock, tooling, oil, outsourced work
Stock sheet Bar lengths and parts in store
Debtors list Who owes you and how long
Asset register Machines and their depreciation
Tool and calibration log Tools bought, instruments checked

Keep records in Ghana for at least 6 years. A free spreadsheet works; so can Zoho Books' free plan or Wave, whose plans may have changed. For basics, see the Hub's Money Skills Level 2.

The accounting rules you need

Assets = liabilities + owner's equity. Each entry has a debit and a credit; debits increase assets and expenses; credits increase income, liabilities and capital; at month-end the totals of debits and credits must agree (a trial balance), though agreement does not prove there is no error. Straight-line depreciation = (cost − end value) ÷ years of use.

Gross profit = sales − cost of materials used. Net profit = gross profit − overheads. Margin = profit ÷ selling price; mark-up = profit ÷ cost.

A sample cash book page

Date Details In GH¢ Out GH¢ Balance GH¢
1 Nov Owner capital paid in 40,000 40,000
2 Nov Second-hand lathe 20,000 20,000
2 Nov Measuring and cutting tools 6,000 14,000
3 Nov Bar stock 7,000 7,000
5 Nov Batch of 200 pins paid in full 3,200 10,200
9 Nov Deposit on shaft rebuilds 2,400 12,600

Worked example (all figures are examples)

Kojo's machine shop, November

  • Kojo puts in GH¢40,000 capital.
  • Buys a second-hand lathe GH¢20,000 (8 years, no end value) and tools GH¢6,000 (4 years, no end value).
  • Buys bar stock GH¢7,000 (GH¢1,500 is still in stock at month-end).
  • Job A: 200 pins for a fabricator, GH¢3,200, paid in full.
  • Job B: shaft rebuilds for a mill, GH¢4,800: deposit GH¢2,400 received, GH¢2,400 still owed.
  • Job C: 30 clamp sets, GH¢2,300, paid in full.
  • Rent GH¢700, power GH¢650, one operator GH¢1,500, oil and cutters GH¢450, transport GH¢250, data GH¢100 (wages before SSNIT and PAYE, to keep the example simple).
  • Kojo takes GH¢1,200 for himself (drawings).

Work out: (1) cash at the end of November; (2) gross profit and net profit; (3) the balance sheet; (4) the trial balance before adjustments; (5) break-even sales for a month if fixed costs are rent, wages, depreciation and data.

Profit per job and the machine-hour rate

A job card gives profit per job. Use the machine-hour cost (Level 1, Unit 7: GH¢30.42 per hour as an example) plus materials, then add a mark-up. If Job C (30 clamp sets, GH¢2,300) took 45 hours of machine time and GH¢800 of materials, cost = 45 × 30.42 + 800 = GH¢2,168.90, so profit = 131.10 and margin = 5.7 percent: too thin; review the price or the hours.

MoMo and bank reconciliation

Match your MoMo and bank books to the statements each month. Example: your MoMo book shows GH¢3,200; the statement shows GH¢3,150. Check: a GH¢50 cash-out fee you did not record. Add the fee to your book as an expense and the difference is cleared. Never ignore differences.

Cash-flow forecast (12 months, example)

Forecast when money arrives and leaves. Simplifications: sales grow from 10,300 to 12,500; variable costs are 66.5 percent of sales; fixed cash costs (rent, wage, data) 2,300; drawings 1,200. No tax, loan or debtor changes (add these in your own plan). Figures are rounded.

Month Sales Opening cash Variable costs Fixed cash costs and drawings Net Closing cash
1 10,300 10,050 6,850 3,500 −50 10,000
2 10,300 10,000 6,850 3,500 −50 9,950
3 10,300 9,950 6,850 3,500 −50 9,900
4 11,500 9,900 7,648 3,500 352 10,252
5 11,500 10,252 7,648 3,500 352 10,604
6 11,500 10,604 7,648 3,500 352 10,956
7 12,500 10,956 8,313 3,500 687 11,643
8 12,500 11,643 8,313 3,500 687 12,330
9 12,500 12,330 8,313 3,500 687 13,017
10 12,500 13,017 8,313 3,500 687 13,704
11 12,500 13,704 8,313 3,500 687 14,391
12 12,500 14,391 8,313 3,500 687 15,078

(The months of thin cash show why a deposit on every job matters.)

Tax records

If you use the Modified Taxation Scheme for turnover between GH¢20,001 and GH¢750,000, the scheme charges about 3 percent of turnover. For November's sales of GH¢10,300 that would be about GH¢309, an example only: ask GRA how it is paid and filed and whether the scheme suits you. A VAT-registered business cannot use it. Keep sales receipts, purchase invoices and bank records. SSNIT is due by the 14th, PAYE and withholding tax by the 15th, and VAT by the last working day of the next month.

Month-end closing routine

  • Count the cash and match to the cash book.
  • Reconcile MoMo and bank.
  • Record closing stock (count bar and parts).
  • Update the debtors list and chase late payers.
  • Record depreciation.
  • Prepare the trial balance, then the profit and loss and balance sheet.
  • Work out profit per job and update the machine-hour rate.
  • Separate your own money from the business: only take drawings you recorded.
  • File the month's records in a folder.

Month-end close

  1. Keep job cards and books for one month (real or example jobs).
  2. Write a cash book, MoMo book and purchases book.
  3. Reconcile MoMo and bank (the instructor gives a statement).
  4. Prepare a trial balance, profit and loss, balance sheet and profit per job.
  5. Work out break-even sales and a machine-hour cost.
  6. Forecast cash for three months.

Bar stock prices

Collect bar stock prices from two dealers and update your job costing (mark prices "example" with the shop and date).

Check yourself

  1. Write the accounting equation.
  2. What is the difference between gross profit and net profit?
  3. Why separate owner money from business money?
08

Unit 7 · Grow and sustain the business

A shop that stays the same gets passed. Grow on purpose: better quality, better prices, good people, and a plan.

Competency standard

Learning outcome Performance criteria — the trainee…
7.1 Set prices uses a machine-hour rate, margin and market checks
7.2 Win and keep customers handles quotes, contracts, tenders and complaints
7.3 Build quality and people runs a quality system and trains staff
7.4 Plan growth plans machines, partners, finance and succession
7.5 Present a plan presents a one-page plan with a 12-month cash forecast to a panel

Range. Your own shop plan. Evidence. Pricing sheet; quality procedure; capstone presentation.

Ask a qualified expert. This is general information, not legal, tax or financial advice. Ask a qualified lawyer before you sign a contract or tender, GRA or a qualified accountant about tax, and your bank before you borrow. Ask a GhIE-registered engineer about any machine purchase, foundation or power supply.

Pricing strategy

Price from your machine-hour cost plus materials plus profit, not from guessing. Check three things: (1) your cost, (2) what customers pay elsewhere, (3) the value of the job to the customer. Charge more for rush work, for tight tolerances and for jobs that block the lathe. Always take a deposit that covers materials. Do not copy a competitor's price without knowing their costs.

Contracts, tenders and customers

  • Quote in writing: drawing or sample, material, quantity, tolerance, price, deposit, delivery date, who pays for rejects.
  • For a tender or a larger contract, read the terms and ask a qualified lawyer.
  • Keep a customer file; follow up after delivery; treat complaints as free advice and fix them quickly.

Quality and people

  • Write a short quality procedure: first-off, in-process and final checks (Unit 4), calibration, non-conformance records.
  • Train every worker with the four steps (tell, show, try, check) and record what each can do alone.
  • Pay on time and keep staff safe: guards, protocol boxes posted at each machine.

Scaling and partnerships

  • Add a second shift or a second machine only when the first is fully busy and the books show it.
  • Partner with fabricators and welders (see the Hub's Basic Welding Level 3): you machine, they weld.
  • Consider a CNC service for repeat work only when volume is steady (Unit 3).
  • Suame Magazine's machine-tool cooperative shows how workshops can share information and work.

Records for loans, and succession

Lenders look at three months of records, a cash-flow forecast, quotes for equipment and your ID. Keep your books clean. Plan succession: train someone who can run the shop if you are ill or away, and write down the main customers, suppliers, prices and procedures.

Ethics

Do not sell a part you know is unsafe. Do not claim a standard you have not met. Do not copy a customer's design without permission. Pay taxes and staff fairly. For lifting, pressure and vehicle parts, say plainly what you can and cannot make.

Finance and markets

The 2026 Budget names programmes such as the National Apprenticeship Programme and Adwumawura; the Ghana Enterprises Agency has advisory centres in the Takoradi area; Ghana EXIM supports SMEs. How a small machine shop accesses them is not verified: ask the offices in writing.

Market yourself

A portfolio of photos and drawings, a WhatsApp Business catalogue, a Google Business Profile, signage, referrals from fabricators and mechanics, and a short capability list (what you can turn, to what size and tolerance).

Business ideas and ingenuity

  • Reverse-engineer worn parts: measure, draw and make replacements.
  • Stock fast-moving fasteners and bushes for local farm machinery.
  • Offer a repair-while-you-wait service for threads and shafts.
  • Make your own bench clamps and vices to sell.
  • Train apprentices and charge a fee (register trainees).

Capstone

You present your complete piece and your business plan to a panel.

Capstone presentation

  1. Show the finished screw bench clamp, with the drawing set, BOM, process plans, inspection record and photos.
  2. Present a one-page business plan: what you make, who buys, location, start-up cost (Unit 5), machine-hour cost and prices (Unit 6), break-even sales, permits and risks.
  3. Present a 12-month cash-flow forecast (use the Unit 6 table as a model with your own example figures).
  4. State your safety system: protocol boxes, guards, training.
  5. Answer the panel's questions.

Growth sums

(a) A second lathe costs (example) GH¢20,000 and adds 80 productive hours a month at GH¢30.42 an hour with 30 percent of that as profit: the monthly profit? (b) The payback in months? (c) Why check the books first?

One-page plan

Finish your one-page business plan and your 12-month forecast and practise a five-minute presentation.

Check yourself

  1. What should a quote contain?
  2. When should you add a second machine?
  3. Why plan succession?
09

Appendix A · Tools and Items Glossary

Note on names. Local names for machines and tools differ from town to town, and many have none. Use the standard name in this book and show the picture or the tool when you ask for it. The "Also called" column gives other common English or trade names.

Item What it is and what it does Typical size or type Also called
Carbide insert Replaceable hard tip for fast cutting Tip
Collet Sleeve that grips small round work
Datum The face from which sizes are measured
Drill bush Hardened guide for a drill in a jig Jig bush
Drill jig Holds the work and guides the drill
DXF A 2-D drawing file
Faceplate Plate on the spindle for large work
Fixture Holds the work in a set position
G-code Programming language of CNC machines
Gauge block Block of exact size for setting and calibrating Slip gauge
Height gauge Measures and scribes heights
Mandrel Rod on which a bored part is held Arbor
Soft jaws Jaws machined to fit the part
Steady rest Support for long slender work
Tool offset A number that tells the control the tool position
Toggle clamp Quick lever clamp
10

Appendix B · Quick cards

Card 1: before a batch

  • Drawing read. BOM checked. Process plan written. Jig made and tried. First-off measured. Hand on the stop.

Card 2: before a CNC run

  • Door interlock works. Offsets checked. Program proved in single block. Feed override low. Work gripped. Hand on feed hold.

Card 3: money

  • Machine-hour cost = monthly costs ÷ productive hours. Price = (machine hours × rate + material) × (1 + mark-up). Margin = profit ÷ price. Break-even = fixed costs ÷ contribution rate.
11

Appendix C · Mistake catalogue (Level 3)

  • Starting a batch before the first-off is checked.
  • A closed chain of dimensions on a drawing.
  • Tolerances tighter than the job needs.
  • A drill bush left worn.
  • Bypassing a CNC interlock.
  • Running a new program at full feed.
  • Pricing without a machine-hour cost.
  • No deposit on a long job.
  • Mixing owner and business money.
12

Appendix D · Blank forms

First-off record. Part ____ Date ____ Dimension ____ Drawing ____ Actual ____ Pass ____ Checked by ____ Non-conformance report. Part ____ Fault ____ Cause ____ Decision (rework, accept, scrap) ____ Action to prevent ____ Calibration log. Instrument ____ Date ____ Reference ____ Reading ____ Error ____ Pass ____ By ____ Job card. Customer ____ Job ____ Material ____ Machine hours ____ Deposit ____ Balance ____ Delivery ____

13

Appendix E · Index

BOM: Unit 1. Calibration: Unit 4. CNC: Unit 3. Contracts: Unit 7. Drill jig: Unit 2. Drawings: Unit 1. G-code: Unit 3. Inspection: Unit 4. Jigs: Unit 2. Machine-hour cost: Units 6, 7. Registration: Unit 5. Supervising: Unit 4. Tolerance stack-up: Unit 1.

14

Glossary

Term Meaning
BOM Bill of materials: the list of parts, materials and quantities
Competent / Not Yet Competent The two possible results of a CBT assessment
CNC Computer numerical control
Datum The face from which sizes are measured
First-off The first part, fully inspected before the batch
Fixture A work-holder that does not guide the tool
Jig A work-holder that guides the tool
Machine-hour cost The cost of running a machine for one hour
Non-conformance A part or process that does not meet the drawing
Tolerance stack The total variation of parts added together
15

Logbook

Copy these pages into an exercise book. Your logbook is part of your assessment evidence.

  • Unit 1: drawing set; BOM; process plan
  • Unit 2: jig drawing; set-up sheet; first-off record
  • Unit 3: labelled CNC lathe; program notes; buy-or-outsource sheet
  • Unit 4: inspection records; calibration log; supervising plan; the finished clamp
  • Unit 5: registration checklist; start-up budget; payroll
  • Unit 6: books; statements; reconciliation; break-even; forecast
  • Unit 7: pricing sheet; quality procedure; capstone plan
  • Every homework, dated
16

Self-check quiz

  1. What does a title block contain?
  2. Why is tighter tolerance dearer?
  3. What is the difference between a jig and a fixture?
  4. Name three lathe work-holding methods for batches.
  5. What is G-code?
  6. Why must a door interlock never be bypassed?
  7. Name the three stages of inspection.
  8. What do you do with a non-conforming part?
  9. Name the four steps to train an apprentice.
  10. What fee does ORC charge for a business name in 2026?
  11. Write the accounting equation.
  12. Define margin and mark-up.
17

Further reading and sources

Best next reads: your machine and controller manuals; a machinery handbook; GRA and ORC official pages for current fees; the Hub's Money Skills Level 2, Entrepreneurial Thinking Level 2 and Basic Welding and Fabrication.

What this module does not cover: operating CNC machines (training by the supplier or a qualified machinist is needed); welding (see Basic Welding and Fabrication); structural, lifting or pressure design (engineers only); exact Ghana fees for fire certificates, EPA permits and Factories Inspectorate registration; and Ghana machine and bar prices (not found reliably; all prices are examples).

Every source used in this manual is listed, with links, in the Teacher Copy.

One application of the Cold-Start Learning Kit. Written in CTVET format; not a CTVET curriculum and not accredited.