About this module
At Level 3 you stop being someone who fixes a machine and become someone who runs a service. You plan other people's maintenance, advise on whole irrigation set-ups, lead helpers and apprentices, and earn from a business that you own, keep books for and grow with care.
Who it is for. Trainees who have finished Level 2 or have equal experience. Ghana's qualifications framework places National Proficiency II below National Certificate I. This module is an advanced level, comparable to National Certificate I, but it is not a CTVET curriculum and has no accreditation. Trainees must be 18 or over.
No official CTVET unit list was found for small engines. Do not describe this module as a CTVET or accredited qualification. Ask CTVET or the regional Ghana TVET Service office whether a standard exists.
Bridge from Level 2: what you already know
- Safe petrol, diesel and exhaust handling; never run an engine in a closed space
- The order of tests: spark, fuel, air, compression; reading plugs, cleaning carburettors, compression and wet tests
- Head, flow and the suction limit; choosing a pump with sums and the maker's curve
- Bleeding a small diesel; referring injector work
- Servicing a tiller and sharpening a chain with the engine off
- Costing a job, break-even and basic marketing
How the module works
Each unit has learning outcomes, performance criteria, the range and the evidence your assessor needs. Every unit ends with homework and a short Check yourself. Units 5 to 7 are about the business. See the hub's Money Skills Level 2 and Entrepreneurial Thinking Level 2 for general money and venture basics; here you go deeper and stay close to the engine and pump trade.
Unit 1 · Systematic diagnosis and planned maintenance
A good mechanic finds faults. A better one stops them happening, because every day a farm pump stands still costs the farmer water, labour and crop.
Competency standard
| Learning outcome | Performance criteria: the trainee… |
|---|---|
| 1.1 Diagnose in a fixed order | uses a written decision tree and records each test and its result |
| 1.2 Plan maintenance by hours | builds a service schedule from the manual and the hours run |
| 1.3 Keep machine histories | keeps a log and spots repeated faults |
| 1.4 Offer a service plan | writes a seasonal service plan and price for a farmer or group |
Range. Small petrol and diesel pump engines, tillers and chainsaws. Evidence. Decision tree; service schedule; machine histories; service plan.
Ask a qualified expert. For fuel, fire, exhaust, pressure, lifting or other dangerous work, ask a qualified mechanic or a GhIE-registered engineer. Never skip a safety step to save time. Ask a GhIE-registered engineer about any large or high-pressure installation. Do not attempt work you are not trained and authorised to do.
A written decision tree
Write the test order as a chart you can hand to a helper:
- Safety and facts: Is the engine safe to touch (cold)? What did the user see, hear and smell? When did it start?
- Fuel: fuel, tap, vent, filter, bowl, jet (Level 2 Unit 2).
- Air: filter, choke, intake leaks.
- Spark (petrol): plug, cap, kill switch, coil (Level 2 Unit 1).
- Compression: test, wet test (Level 2 Unit 3).
- Pump side: prime, air leak, strainer, suction, cavitation (Level 2 Unit 4).
- Diesel side: air in fuel, filters, water (Level 2 Unit 5).
- Decide: repair now, refer, or repair-or-replace (Unit 4).
Record each test and its result; do not change two things at once.
Planned maintenance by hours
Manufacturers set small-engine service by run hours. One maker's maintenance reminder flashes every 25 hours of running, and a manual may list tasks before each use and every 25, 50 and 100 hours. Another engine maker notes that no two schedules are exactly the same, so you must check the schedule for each engine. Use your engine's manual. The 25, 50 and 100 hours below are examples to show the method.
Fuel goes stale with time as well as hours: one maker warns petrol can go bad in as little as 30 days and advises a stabiliser.
Steps to build a schedule for a farmer:
- List each machine, its make, model and the manual's service table.
- Ask how many hours a week it runs. Fill the table with hours and dates.
- Divide the service interval by weekly hours to get the due date.
- Add calendar jobs: fuel check, hoses, strainer, storage before the rains.
- Give the farmer a one-page card and put the next service date on the machine.
| Machine | Task | Interval (example, use your manual) | Hours a week | Due about |
|---|---|---|---|---|
| Pump A (4-stroke) | Air filter | 25 h | 15 | every 1.7 weeks |
| Pump A | Oil change | 100 h | 15 | every 6.7 weeks |
Machine histories
For each machine keep a card: purchase date, hours, every service, every fault, every part and cost. After a year the card shows the real cost of owning that machine and which faults come back. A fault that comes back twice means a root cause was missed.
Build a service plan
Example figures. A farmer has 4 identical pumps. Each runs 15 hours a week for 40 weeks of irrigation a year. Example intervals: air filter 25 hours, oil change 100 hours. (a) Hours per pump per year? (b) Oil changes per pump per year? (c) Air-filter services per pump per year? (d) For all 4 pumps, how many oil changes and filter services? (e) If you price a filter service at GH¢30 and an oil change at GH¢90 (examples), what is the yearly service-plan price for the 4 pumps?
SAFETY PROTOCOL: Diagnosis on a customer's site
Before you start
- Tell the customer what you will do; check the area for children, animals and open flames.
- Fire extinguisher, sand, first-aid kit and PPE with you; decision tree and record sheet ready.
While you work
- Do: follow the written order; record each test; change one thing at a time.
- Do not: skip a safety step to save time; test a spark with a bare hand; run an engine in a closed space.
After you finish
- Test run in the open; clean up; take away used oil; update the machine-history card and tell the customer what to check daily.
Emergency
- Call 112 for fire, serious burn, heavy bleeding, collapse or poisoning.
- Fire: get people clear; use the extinguisher or sand only if it is safe; never throw water on a petrol fire. A doctor or nurse must advise on first aid.
- Switch the engine off at the stop switch; move anyone who feels dizzy or sick to fresh air (carbon monoxide).
- Electrical or battery isolation: not needed on a pull-start engine; for any electric item, isolate at the supply and call a certified electrician.
Tools and items for this unit
| Item | What it is and when you use it | Size or type |
|---|---|---|
| Hour meter | Counts engine hours for service intervals | Fitted or portable |
| Service sticker | Shows next service date and hours | Self-adhesive |
| Machine-history card | One card per machine | Printed or exercise book |
| Compression tester, spark tester, feeler gauge | The Level 2 test kit used in a fixed decision tree | See Level 2 |
Defined in Level 1 Appendix A12, Level 2 Appendix B13 and Appendix C8 below.
Decision tree and service plan
- Take one machine with a set fault. Write the decision tree for it, then diagnose it, recording every test.
- Open a machine-history card for it.
- For a pretend customer with three machines, build the service schedule table from the manuals.
- Price a seasonal plan with the example method.
- Present the plan in a short talk, with the due dates.
Interview a farmer
Ask a farmer which breakdown cost them most in the last year, how many days of watering were lost, and how a plan would have helped.
Check yourself
- Why plan service by hours, not only by date?
- Which kind of service depends on time, not hours?
- What does a machine-history card help you spot?
Unit 2 · Designing a small-farm irrigation set-up
A pump is only one part of irrigation. Water need, method, hoses and pressure decide whether the crop gets what it needs at a cost the farmer can pay.
Competency standard
| Learning outcome | Performance criteria: the trainee… |
|---|---|
| 2.1 Estimate water need | converts a depth in mm over an area into litres per day |
| 2.2 Choose a method | compares drip, sprinkler and surface methods for a farm |
| 2.3 Size the pump for the design | adds suction lift, delivery head, friction loss and operating pressure |
| 2.4 Estimate running cost and plan the layout | works out hours, fuel and a simple layout sketch |
Range. A small vegetable or market-garden plot of up to a few thousand square metres, with a surface-water source or a tank. Evidence. Design sheet; layout sketch; flow test.
Ask a qualified expert. For pressure, fuel, fire, structural or other dangerous work, ask a qualified mechanic or a GhIE-registered engineer. Ask a GhIE-registered engineer for any design for more than a small plot, any pressure above the pipe and fitting rating, and any connection to a borehole or storage tank. A pump set that is wrongly sized can burst pipes or fail. Taking water from rivers or underground may need a permit: ask the Water Resources Commission. Do not attempt work you are not trained and authorised to do.
Step 1: how much water?
Crop water need depends on the crop, weather and growth stage; the FAO irrigation scheduling manual covers scheduling methods (plant observation, estimation, simple calculation) and the conversion of mm per day to litres per second per hectare. Ask the district agriculture officer or the farmer's extension agent for the crop's need. In this unit we use example values only.
Key conversion: 1 mm of water over 1 square metre is 1 litre. So a depth in mm times the area in m² gives litres.
Step 2: which method?
Pressure piped systems are grouped by the pressure they need: low pressure systems need 2.0 to 3.5 bars, medium 3.5 to 5.0 bars, and high more than 5.0 bars. Piped systems need a certain pressure, about 2 to 3 bars, unlike gravity surface methods which need no outside energy. Drip emitters give very low flows, 0.4 to 1.0 litre per hour, at low pressures of 0.6 to 1.0 bar.
| Method | Pressure needed | Pump size and fuel | Good for | Watch for |
|---|---|---|---|---|
| Drip | Low (about 1 bar at emitters, see maker) | Small pump; clean water; filter | Rows, vegetables, orchards | Blocked emitters; filter; cost of tubing |
| Sprinkler (mini) | Medium (see maker) | Bigger pump | Leafy beds, nurseries | Wind; wet leaves; fuel use |
| Surface (hose, furrow) | Almost none after the hose | Smallest pump | Flat fields; low cost | Water waste; uneven watering |
Use the maker's data for the real pressure of any emitter or sprinkler you buy; this table gives the idea only.
Step 3: total head for the design
For a small pressure system:
Total head = suction lift + height to the highest point + friction loss in hoses and fittings + pressure needed at the emitters or sprinklers (as head).
Head is a height of water; 1 metre of fresh water adds about 9.8 kPa of pressure. So 100 kPa (1 bar) is about 10.2 m of head. Friction in hoses and fittings is head loss; fittings can matter as much as pipe length in short runs. Keep the suction short and low, and remember the suction limit of about 10 m at sea level, of which little can be used in practice. Get friction figures from the hose maker's table or ask a qualified engineer.
Step 4: running time and cost
Time = gross water ÷ flow. Gross water = net need ÷ efficiency (drip is usually more efficient than surface methods; use the maker's or extension officer's figure, here an example). Fuel = hours × litres per hour. Cost = litres × price.
Design sheet
Example figures (not real crop or pump data). A plot is 2,500 m². The crop's example need is 5 mm a day. The method is drip with an example efficiency of 75%. The pump delivers 200 litres a minute. Suction lift 2 m; the highest drip line is 5 m above the pump; friction loss 4 m; the emitters need 1 bar. The engine uses 1.2 litres of petrol an hour; petrol is an example GH¢15 a litre. (a) Net water a day in litres. (b) Gross water a day. (c) Minutes of pumping a day. (d) Total head in metres, using 1 bar = 10.2 m. (e) Fuel cost of one day's watering. (f) Fuel cost for 30 days.
Layout sketch checklist
- Water source, pump position (short, low suction) and a safe, level, shaded engine spot in open air
- Main line from pump to field; sub-lines; valves to water in blocks
- Filter on the delivery line (drip); a pressure gauge at the pump or the first valve
- Blocks sized so the pump can water one block at a time at the right flow
- Fuel store away from the engine and from cooking fires
- Water permission checked
- Solar pumps or borehole supply: see the hub's Solar Energy and Boreholes and Water Pumps modules
Do not guess friction loss or pressure. Wrong numbers mean a pump that cannot lift the water or hoses that burst. Use the maker's data and ask a GhIE-registered engineer for anything beyond a small plot.
Parts and safety rules
| No. | Part | What it does | Safety rule |
|---|---|---|---|
| 1 | Water source | Tank, stream or dam | Permission to take the water checked |
| 2 | Pump and engine | Lifts and pushes the water | Engine safety rules; open air |
| 3 | Pressure gauge | Shows pressure | Fit where it can be read safely; do not exceed the pipe rating |
| 4 | Screen filter | Stops grit blocking the emitters | Clean it often; depressurise before opening |
| 5 | Pressure regulator | Holds pressure steady | Match it to the emitters |
| 6 | Control valve | Opens one block at a time | Never close all valves with the pump running |
| 7 | Submain | Pipe feeding the drip lines | Secure joints; rated for the pressure |
| 8 | Drip line (tape) | Carries water along the row | Do not kink or step on it |
| 9 | Emitter | Releases water slowly, 0.4 to 1.0 litre per hour at about 0.6 to 1.0 bar | Check for blockage |
| 10 | Flush valve | Opens at the line end to wash out dirt | Open slowly; keep away from the jet |
| 11 | Main line to the next block | Carries water on | Rated for the pressure |
SAFETY PROTOCOL: Pressure test and commissioning of an irrigation set-up
Before you start
- Design checked by a GhIE-registered engineer where it is more than a small plot; pipes, fittings and gauge rated for the pressure.
- Engine checks done; hoses clamped; people kept clear of joints.
- PPE: glasses, gloves, ear protection.
While you work
- Do: raise pressure slowly; check every joint for leaks; record flow and pressure.
- Do not: exceed the pipe rating; stand over a joint under pressure; connect to an existing pressurised pipe or borehole without a qualified person.
After you finish
- Stop the pump; release pressure slowly; flush the lines; fill in the commissioning sheet (Appendix C2).
- Report leaks and weak joints to the customer in writing.
Emergency
- Call 112 for fire, serious burn, heavy bleeding, collapse or poisoning.
- Fire: get people clear; use the extinguisher or sand only if it is safe; never throw water on a petrol fire. A doctor or nurse must advise on first aid.
- Switch the engine off at the stop switch; move anyone who feels dizzy or sick to fresh air (carbon monoxide).
- Electrical or battery isolation: not needed on a pull-start engine; for any electric item, isolate at the supply and call a certified electrician.
Tools and items for this unit
| Item | What it is and when you use it | Size or type |
|---|---|---|
| Drip tape, emitters, screen filter, pressure regulator, flush valve | Parts of a drip system | By maker |
| Pressure gauge | Reads pressure at the pump or valve | 0 to 6 bar (example) |
| Bucket and stopwatch | Flow test | 20 litres |
| Tape measure and level | Measure heights and lengths | 5 or 8 m |
| Calculator or sheet | Design and friction sums | Any |
Defined in Level 1 Appendix A12, Level 2 Appendix B13 and Appendix C8 below.
Design and flow test
- Measure a practice plot (length, width, area) and the heights and distances for the pump and lines.
- Using example crop and efficiency values from your trainer, complete the design sheet.
- Draw the layout and mark blocks, valves, filter and gauge.
- Set up a small version with a tank, pump and hose. Measure the flow with a bucket and stopwatch over one minute. Compare with the design.
- Write a one-page recommendation for the farmer: pump size, running time, fuel cost per day, and risks.
Visit an irrigated farm
Visit an irrigated farm. Note the method, pump, hose length, water source, how often it is watered and how long. Sketch the layout and write what you would change.
Check yourself
- How many litres is 1 mm of water over 1 m²?
- What four items add up to total head for a pressure system?
- Who do you ask about a design for a big plot?
Unit 3 · Supervising a workshop: quality, safety, parts and handover
When others work for you, their mistakes become your mistakes and your name is on every job. Systems protect your customers and your business.
Competency standard
| Learning outcome | Performance criteria: the trainee… |
|---|---|
| 3.1 Organise the workshop | sets bays, tool control, a fuel store and housekeeping rules |
| 3.2 Train and supervise helpers | gives clear tasks, shows, checks and corrects; keeps safety first |
| 3.3 Control quality | uses job cards, check steps and a handover test |
| 3.4 Manage parts and warranty | keeps a parts list, buys from reputable dealers and gives a clear guarantee |
Range. A small workshop with one to four helpers or apprentices. Evidence. Job card; safety rules; parts and warranty sheet; supervising log.
Ask a qualified expert. For fuel storage, fire, exhaust, pressure, lifting or other dangerous work, ask a qualified mechanic, the Ghana National Fire Service or a GhIE-registered engineer. For hiring, contracts and employment law, ask a qualified lawyer. This is general information, not legal advice. For tax, SSNIT and PAYE, check with GRA or a qualified accountant. Do not attempt work you are not trained and authorised to do.
Workshop safety system
- Open-air test bay: engines run only outdoors, never in a closed room.
- Fuel store: outdoors, away from living space and heat, containers marked and capped, containers on the ground when filling. Ask the NPA and the Fire Service before storing fuel in quantity or for sale.
- Extinguisher and sand, checked monthly and written in a log.
- Protective gear available and used: glasses, gloves, ear protection, boots.
- Rule: no helper works alone with a running engine or a chainsaw until you have signed them off.
- A first-aid kit; the emergency number is 112.
Job cards and quality checks
A job card has the customer, machine, fault reported, tests done, work done, parts, price, helper, and the checks below, and is signed by you.
- Fault found by test, not guess
- Correct parts and the manual's settings used
- No leaks; guards and covers refitted; no tools left in the machine
- Engine run in open air for the time set; pump run with water; results written
- Customer shown the work and the old parts, and told when the next service is due
- Safety check done; area clean
Teaching and supervising helpers
- Show, do together, watch, sign off: four steps for each skill.
- Give one clear task at a time, with the safety rule for it.
- Check the work yourself before the customer sees it.
- Correct mistakes calmly and at once; praise good work.
- Keep a supervising log: who did what, what was checked, what must be repeated.
- Apprentices: STMA says master artisans must register their trainees.
Parts and warranty
- Buy from reputable dealers. Keep receipts. Label returned parts.
- Keep a small stock of fast movers (plugs, filters, clamps, strainers, gaskets).
- Give a written guarantee: what is covered (your work and the parts you fitted), for how long, and what is not covered (misuse, dirty fuel, no servicing). Ask a qualified lawyer how to word it.
- Comebacks (jobs that return): record, fix free, find the cause. A high comeback rate means a training or quality problem.
Comebacks and cost
Example figures. In a month the workshop does 40 jobs. Six come back. Each comeback costs GH¢45 of your time and parts. (a) Comeback rate? (b) Monthly cost of comebacks? (c) Target: halve the comebacks. How many comebacks, and how much would it save in a month?
Parts and safety rules
| No. | Part | What it does | Safety rule |
|---|---|---|---|
| 1 | Open-air engine test bay | Where engines are run | Never run engines inside the shop |
| 2 | Fuel store | Approved containers, shaded, outdoors | Away from the bay, cooking fires and sockets |
| 3 | Workbench | Bench work: carburettors, filters, plugs | Keep it clear; no fuel near sparks |
| 4 | Test tank or drum | Water for pump tests | Stable and level; drain after use |
| 5 | Parts shelves | Stock of plugs, filters, gaskets | Heavy items low; label bins |
| 6 | Extinguisher and sand | Fire response | Reachable without crossing the fire; checked and serviced |
| 7 | Records desk | Job cards, receipts, cash book | Keep paper away from fuel |
| 8 | Used-oil container | Holds used oil and waste | Closed and labelled; take to a proper place |
| 9 | Exit | Escape route | Never blocked |
| 10 | Clear walkway | Safe movement | Keep free of hoses and tools |
SAFETY PROTOCOL: Running the workshop day (supervisor)
Before you start
- Walk the shop: exits clear, extinguisher in place, fuel store closed, first-aid kit stocked.
- Brief everyone: PPE, who is running engines, who is the safety lead.
While you work
- Do: supervise apprentices; one engine at a time in the bay; stop work for any unsafe act.
- Do not: allow anyone under 18 to do hazardous work; allow smoking or open flames near fuel.
After you finish
- Stop engines; cool; clean; lock the fuel store and the tools; write an incident or near-miss note.
- Review the day's faults and comebacks.
Emergency
- Call 112 for fire, serious burn, heavy bleeding, collapse or poisoning.
- Fire: get people clear; use the extinguisher or sand only if it is safe; never throw water on a petrol fire. A doctor or nurse must advise on first aid.
- Switch the engine off at the stop switch; move anyone who feels dizzy or sick to fresh air (carbon monoxide).
- Electrical or battery isolation: not needed on a pull-start engine; for any electric item, isolate at the supply and call a certified electrician.
Tools and items for this unit
| Item | What it is and when you use it | Size or type |
|---|---|---|
| Workbench, parts shelves, mobile toolbox | Organise work, stock and visits | Firm, level |
| Job card, handover sheet, warranty slip | Quality and customer records | Templates in Appendix C2 |
| Test tank or drum | Bench test of pumps | 200 litres |
| Extinguisher, sand, first-aid kit | Workshop safety | As Level 1 |
Defined in Level 1 Appendix A12, Level 2 Appendix B13 and Appendix C8 below.
Run a job through the system
- Set up a mini workshop with a bay, fuel store, extinguisher and job cards.
- A helper does a basic service while you supervise with the four steps.
- You check it using the checklist, and run the handover test with the customer.
- Write the guarantee for the job.
- Record the supervising log.
Write your rules
Write a one-page set of workshop safety and behaviour rules for helpers, in plain words.
Check yourself
- Give the four steps for teaching a skill.
- What is a comeback?
- Who must you register if you take an apprentice?
Unit 4 · Repair or replace: costing the decision
Farmers ask, "Should I repair it or buy a new one?" An honest, written, costed answer builds trust and keeps customers for years.
Competency standard
| Learning outcome | Performance criteria: the trainee… |
|---|---|
| 4.1 Compare repair and replace | lists costs, remaining life and risks of each option |
| 4.2 Calculate yearly cost | uses straight-line depreciation and repair cost per year |
| 4.3 Advise honestly | writes a quote and a plain recommendation |
| 4.4 Handle reconditioned and second-hand | explains the risks and checks the machine |
Range. Small petrol and diesel pump engines, tillers and chainsaws. Evidence. Costed recommendation; quotes.
Ask a qualified expert. This is general information, not legal or financial advice; ask a qualified accountant or your bank for money questions and a qualified lawyer for contract and warranty wording. For fuel, fire, exhaust, pressure or other dangerous work, ask a qualified mechanic or a GhIE-registered engineer.
The questions to ask
- What exactly is wrong, and has it been tested, not guessed (Level 2 Unit 3 for compression)?
- What does the repair cost in parts and labour, and how long will it last afterwards?
- What does a new machine cost, and how long will it last?
- What are the risks: repeated breakdowns, unsafe parts, parts not available?
- What does the farmer lose each day the machine does not work?
Yearly cost method
Straight-line depreciation = (cost − salvage value) ÷ useful life. For a repair, the yearly cost = repair cost ÷ years of life expected after repair. Add the expected extra repairs and running costs for the old machine, and compare yearly totals. Do not ignore fuel use: an old engine may burn much more.
Repair or replace
Example figures. A pump engine needs a rebuild quoted at GH¢1,100 (parts and labour). You expect it to last 4 more years. A new engine costs GH¢2,400, expected life 8 years, salvage value GH¢400. The old engine uses 1.4 litres of petrol an hour and the new one 1.1 litres. The pump runs 600 hours a year; petrol is an example GH¢15 a litre. (a) Repair cost per year. (b) Straight-line depreciation per year of the new engine. (c) Yearly fuel for each. (d) Yearly cost for each (cost per year + fuel). (e) Which is cheaper? What else must you tell the farmer?
Reconditioned and second-hand machines
- Ask why it was sold; ask to run it; check for oil leaks, smoke, noise, compression and a blocked or damaged pump casing.
- Ask for the manual and parts availability.
- A very low price may hide a worn engine. Test before you advise a farmer to buy.
- Write what you tested in your quote. Never promise what you did not test.
Writing the recommendation
One page, plain words: the fault, the test result, the two options with yearly cost, your advice and the risks, the date and your name. Give the customer time to decide. A farmer who understands will return.
SAFETY PROTOCOL: Test-running a used engine before you buy or quote
Before you start
- Open air; fuel and oil checked; extinguisher and sand ready; the seller or customer kept behind a line.
- Compression tester and record sheet ready; PPE worn.
While you work
- Do: start from cold; listen for knocks; watch smoke; take a dry and a wet compression reading and write them down.
- Do not: rev the engine hard or adjust the governor; run it in a closed place; give a guarantee until a qualified mechanic and a lawyer have checked your wording.
After you finish
- Stop and cool; record readings and findings; give a written quote.
Emergency
- Call 112 for fire, serious burn, heavy bleeding, collapse or poisoning.
- Fire: get people clear; use the extinguisher or sand only if it is safe; never throw water on a petrol fire. A doctor or nurse must advise on first aid.
- Switch the engine off at the stop switch; move anyone who feels dizzy or sick to fresh air (carbon monoxide).
- Electrical or battery isolation: not needed on a pull-start engine; for any electric item, isolate at the supply and call a certified electrician.
Tools and items for this unit
| Item | What it is and when you use it | Size or type |
|---|---|---|
| Compression tester | Dry and wet readings on a used engine | Fits the plug hole |
| Fuel measure and stopwatch | Measured fuel use per hour | Marked jug |
| Calculator and yearly cost sheet | Repair-or-replace sums | Any |
Defined in Level 1 Appendix A12, Level 2 Appendix B13 and Appendix C8 below.
Costed recommendation
- Take a worn engine in the workshop. Diagnose it (compression, fuel, ignition).
- Get a parts quote and estimate labour for a repair.
- Get a price for a new or reconditioned engine from a dealer, or use trainer example prices.
- Complete the yearly cost method.
- Write the one-page recommendation and present it.
Ask about the decision
Ask a farmer or mechanic about a time they chose to repair or replace an engine, what it cost and whether they would choose the same again.
Check yourself
- Write the straight-line depreciation formula.
- Why can fuel use decide repair or replace?
- What must you write in a quote for a reconditioned engine?
Unit 5 · Establish your own business
Fixing engines for a boss earns a wage. Owning the workshop earns a living and a future, but only if it is registered, funded and run with care.
Competency standard
| Learning outcome | Performance criteria: the trainee… |
|---|---|
| 5.1 Choose a legal form | compares sole proprietor, partnership, limited company and cooperative |
| 5.2 Register step by step | lists the bodies, forms, fees and permits for an engine and pump workshop |
| 5.3 Plan premises, equipment and money | makes a start-up budget and a funding plan |
| 5.4 Plan staff, insurance and compliance | lists the employer duties and the safety rules |
| 5.5 Write and pitch a one-page plan | presents a plan with a market, prices and a first-year goal |
Range. A one- to four-person engine and pump workshop or mobile service in the Western Region. Evidence. Registration checklist; start-up budget; one-page plan and pitch.
Ask a qualified expert. This is general information, not legal advice. Ask a qualified lawyer before you choose a legal form, sign a lease or contract, or register a company. For tax, VAT, PAYE and SSNIT, check with GRA or a qualified accountant before you act. For loans and insurance, ask your bank, a licensed insurer or a qualified accountant. For fuel storage, fire safety, exhaust and pressure work, ask a qualified mechanic, the Ghana National Fire Service or a GhIE-registered engineer. Fees and rules change: check each office.
Legal form
| Form | Key points (Ghana, 2026) |
|---|---|
| Sole proprietor (business name) | Register a business name: GH¢130, renewal GH¢70 a year; unlimited liability, so you are personally liable |
| Partnership | GH¢270, renewal GH¢100 a year; 2 to 20 partners; partnership agreement stamped by the Lands Commission |
| Company limited by shares | GH¢585 plus a 1% capital duty on stated capital as the page states, "check PDF"; at least 2 directors and a secretary; a consent letter from an ICAG chartered accountant. The capital duty is not settled: ask the ORC |
| Company limited by guarantee | GH¢490, for NGOs, churches and social enterprises with no profit to members, so not usual for a workshop |
| Cooperative | Not registered at the ORC; an organisational TIN comes from GRA; the Department of Co-operatives route is not verified |
For most one-person workshops a registered business name is the start. A company limits your personal liability but has more rules, costs and yearly returns: the annual return is GH¢175 a year, with late fees of GH¢1,000 (1 to 4 years) or GH¢2,000 (5 years or more). A partnership needs a written agreement: who puts in what, who does what, how profit and losses are shared, and what happens if one leaves. Ask a lawyer.
Registration steps (checklist)
- Choose and register the form at the Office of the Registrar of Companies (ORC) (fees above).
- Tax identity. Your Ghana Card number is your TIN; a company gets a GRA TIN after ORC registration.
- Business operating permit from the Assembly: STMA runs an online portal. The fee for an engine and pump workshop is not verified; ask STMA.
- Water. L.I. 1692 exempts abstraction by manual means; mechanical abstraction up to five litres per second is exempt from the permit but must be registered with the District Assembly (regulations 9, 10 and 11). Measure the pump's real flow, and ask the Water Resources Commission and the District Assembly whether the customer or you must register or hold a permit. Current fees: not verified. Appendix C5 has the full checklist.
- Fuel. NPA licence rules apply to commercial storage and sale of petroleum. If you plan to sell or store fuel, ask the NPA and the Ghana National Fire Service first. Fire certificate rules for a small workshop: not verified.
- Environment. Act 917 was repealed and absorbed by the Environmental Protection Act 2025 (Act 1124). Used oil: take it to a proper collection point; whether your workshop must register, and where the points are: ask the EPA (not verified).
- Insurance. Only NIC-licensed insurers; check at the NIC. Compulsory covers: not verified.
Tax basics for a workshop
- Individuals with only business income who are not VAT-registered may use the Modified Taxation Scheme: turnover up to GH¢20,000 pays fixed instalments, and GH¢20,001 to GH¢750,000 pays 3% of turnover or uses the modified cash basis. GRA's own page still showed an older ceiling of GH¢500,000 on 8 Oct 2026, so check with GRA. Pay by *880# or the MTS app.
- Companies pay corporate income tax; the standard rate is 25%, with a lower rate for manufacturers outside Accra and Tema; a workshop is not usually a manufacturer, so ask GRA.
- VAT (Act 1151, from 1 Jan 2026): the registration threshold for goods is GH¢750,000; for services there is no turnover threshold and a taxable person registers within 30 days of starting. A repair workshop supplies services and sells parts: ask GRA how your supplies are treated before you start. A VAT-registered business cannot use the MTS. The effective rate is 20% (15% VAT plus 2.5% NHIL plus 2.5% GETFund).
- Withholding tax. Some customers (companies, government) withhold tax on payments to you; for services the rate is 7.5% over GH¢2,000 a year. Ask the payer for a certificate.
- Records: keep them in Ghana for at least 6 years.
Premises, equipment and a start-up budget
Location, as in Level 2: near irrigated farms, with open-air test space, shade, security and no fuel store beside the workshop. Ask your landlord in writing. Start-up items: tools, a bench and vice, a spark tester, a compression gauge, feeler gauges, a torque wrench, a chain vice and files, a mobile toolbox, a test tank and hoses, an extinguisher and first-aid kit, a starter stock of spares, protective gear, signage, working cash. All prices must be collected locally; the figures below are examples.
Start-up budget and funding
Example figures. Tools and bench GH¢2,400; test tank, hoses and strainers GH¢300; spares stock GH¢600; protective gear, extinguisher, first aid GH¢250; signage and phone data GH¢150; registration (business name GH¢130 plus the first-year permit, example GH¢200); working cash for three months GH¢1,500. Funding: your savings GH¢3,000, a susu or VSLA loan GH¢2,000, and the rest from a bank loan or a support programme. (a) Total start-up cost. (b) The funding gap. (c) If the bank loan for the gap is repaid over 10 months, with a flat total repayment of 20% more than the amount borrowed (example, not a real rate), what is the monthly repayment? (d) Is that affordable if your example monthly profit is GH¢1,200?
Finance sources
Savings, a susu or VSLA, microfinance, banks, and support programmes. The Ghana Enterprises Agency (GEA) has Business Advisory Centres in Takoradi, Shama, Effia-Kwesimintsim, Mpohor and Ahanta West. The 2026 Budget names programmes including the National Apprenticeship Programme (GH¢170m) and Adwumawura (GH¢160m). Whether you qualify, and what is offered, is not verified: ask GEA. The Assemblies' share for persons with disability: not verified here.
Staff, insurance and compliance
- Employees. For work of 6 months or more, a written contract; the written statement of terms within 2 months; 15 working days of paid leave a year. Daily minimum wage in 2026: GH¢21.77.
- SSNIT: employee 5.5% plus employer 13%; the employer pays within 14 days after month-end. Register workers when you hire.
- PAYE: the first GH¢588 a month is taxed at 0%; deduct SSNIT first; pay by the 15th of the next month.
- Safety: your duty under Level 3 Unit 3; see the hub's Workplace Safety module.
- Insurance. Ask a licensed insurer about cover for tools, stock and liability; compulsory cover: not verified.
Marketing yourself
WhatsApp Business with a catalogue and quick replies; Google Business Profile; a clear sign; referrals; a portfolio with before and after photos; a farm service-plan offer (Unit 1); and group days for farmers.
Accessibility note
The Persons with Disability Act 2006 protects people with disabilities. A wheelchair user can run a bench workshop, parts shop and service-plan business; keep ground-floor access, wide doors, and benches at a suitable height. People with hearing or speech difficulties can use WhatsApp, written job cards and pictures. Tasks needing lifting can use trolleys, hoists, helpers or specialised tools. (Funding: not verified; ask the Assembly and GEA.)
Tools and items for this unit
| Item | What it is and when you use it | Size or type |
|---|---|---|
| Registration checklist | Office, what to bring, fee, renewal date | Exercise book |
| Receipt book | Proof of payment | Carbon pad |
Defined in Level 1 Appendix A12, Level 2 Appendix B13 and Appendix C8 below.
Register and plan (paper exercise)
- Choose your legal form and say why.
- Complete the registration checklist: for each item write the office, what to bring, the fee (or "not verified") and the date to renew.
- Make a start-up budget using local prices you have collected (label any estimate "example").
- Write the funding plan.
- Write a one-page business plan: customers, services, prices, first-year goal, risks.
- Pitch it in three minutes.
Visit the offices
Visit or call (do not just search) the ORC desk or portal and the STMA business permit office. Write the steps, fees and times they give you, and the date.
Check yourself
- What does a registered business name cost, and how much to renew (2026)?
- Does a repair workshop selling services have a VAT turnover threshold?
- Name two bodies you ask before storing fuel for sale.
Unit 6 · Basic accounting and bookkeeping for your workshop
If you do not know what you earn and what you owe, you cannot know whether the workshop is making money. The books tell the truth. Keep them every day.
Competency standard
| Learning outcome | Performance criteria: the trainee… |
|---|---|
| 6.1 Keep the daily records | keeps a cash book, receipts, invoices, petty cash and stock records |
| 6.2 Track debtors and creditors | lists who owes you and whom you owe |
| 6.3 Make the statements | prepares a simple income statement, balance sheet and cash-flow forecast |
| 6.4 Price and test the business | costs jobs, finds break-even, margin and mark-up, and depreciation |
| 6.5 Close the month | reconciles cash, bank and MoMo and checks the books |
Range. A small workshop with a cash book and a monthly closing. Evidence. A month's books; statements; reconciliation.
Ask a qualified expert. This is general information, not accounting, tax or legal advice. Check with GRA or a qualified accountant before you act on any tax, VAT, PAYE, SSNIT or record-keeping matter. Ask your bank, a licensed insurer or a qualified accountant for loan and insurance questions. See the hub's Money Skills Level 2 and Entrepreneurial Thinking Level 2; this unit goes deeper for an engine and pump workshop.
The basic rules
- The accounting equation: Assets = Liabilities + Equity. Debits increase assets and expenses; credits increase liabilities, capital and income; a trial balance is a partial check.
- Keep your money and the business's money separate. Pay yourself drawings and record them.
- Keep records in Ghana for at least 6 years.
- You can use paper, Excel or Google Sheets; free accounting software also exists. Check current terms before you rely on them.
Daily records
- Receipt book with carbon copies: every sale, with date, customer, work and amount.
- Invoice for jobs paid later: customer, job, amount, due date.
- Cash book: money in and out, with a running balance.
- Petty cash: a small float for small items, with a slip for each use and a weekly top-up.
- Stock card for each fast-moving part: bought, used, left.
- Job cards (Unit 3): link each sale to the work done.
Debtors and creditors
Debtors owe you; creditors are owed by you. Keep a list with amounts and dates. Chase debtors politely at agreed intervals; a deposit for parts reduces your risk. Pay creditors on time to keep supply.
A sample month: cash book
Example figures. Opening cash 1 March GH¢1,000.
| Date | Details | In (GH¢) | Out (GH¢) | Balance (GH¢) |
|---|---|---|---|---|
| 1 Mar | Opening cash | 1,000 | 1,000 | |
| 2 Mar | Spare parts bought | 450 | 550 | |
| 3 Mar | Pump service, Ama | 250 | 800 | |
| 5 Mar | Plug sale | 60 | 860 | |
| 7 Mar | Rent | 300 | 560 | |
| 8 Mar | Tiller service | 215 | 775 | |
| 10 Mar | Transport | 120 | 655 | |
| 12 Mar | Chain sharpening | 30 | 685 | |
| 15 Mar | Pump service | 250 | 935 | |
| 18 Mar | Phone data | 40 | 895 | |
| 20 Mar | Diesel pump bleed and filter | 320 | 1,215 | |
| 25 Mar | Group service day, 4 pumps | 900 | 2,115 | |
| 28 Mar | Owner's drawings | 500 | 1,615 |
Totals. Receipts (excluding opening cash): 250 + 60 + 215 + 30 + 250 + 320 + 900 = GH¢2,025. Payments: 450 + 300 + 120 + 40 + 500 = GH¢1,410. Closing cash = 1,000 + 2,025 − 1,410 = GH¢1,615, which matches the last balance.
Trial-style check
At month end: (1) the cash book closing balance equals the cash in the box plus the MoMo balance and bank balance (reconciliation, below); (2) receipts and payments totals add up; (3) the stock card for parts agrees with the shelf count; (4) the assets equal liabilities plus equity (below). If a check fails, find the cause before you go on.
Income statement (profit and loss) for March
Cost of parts used = parts bought 450 + opening stock 0 − closing stock counted 150 = GH¢300.
| Line | GH¢ |
|---|---|
| Sales (receipts) | 2,025 |
| Less cost of parts used | 300 |
| Gross profit | 1,725 |
| Rent | 300 |
| Transport | 120 |
| Phone data | 40 |
| Depreciation of tools (2,400 − 400 salvage) ÷ 5 years ÷ 12 months = 33.33, shown as 33 | 33 |
| Total expenses | 493 |
| Net profit | 1,232 |
Drawings (GH¢500) are not an expense; they are the owner taking money out of the business.
Balance sheet at 31 March
| Assets | GH¢ | Liabilities and equity | GH¢ |
|---|---|---|---|
| Cash | 1,615 | Liabilities (none) | 0 |
| Parts stock | 150 | Owner's capital (opening) | 3,400 |
| Tools, net (2,400 − 33) | 2,367 | Add net profit | 1,232 |
| Less drawings | (500) | ||
| Total assets | 4,132 | Total liabilities and equity | 4,132 |
Check: 1,615 + 150 + 2,367 = 4,132, and 3,400 + 1,232 − 500 = 4,132. Opening capital is the opening cash GH¢1,000 plus tools GH¢2,400.
Pricing, margin and mark-up
- Margin = profit ÷ price. Mark-up = profit ÷ cost. A 20% margin on price needs a price = cost ÷ 0.80; a 20% mark-up is cost × 1.20. Do not mix them: a 25% mark-up equals a 20% margin.
- Break-even jobs = fixed monthly costs ÷ margin per job in cash.
- Price to cover parts, your time, fuel, travel, a share of rent and tools, a profit and a safety margin. Do not copy the cheapest competitor.
Cash-flow forecast (3 months, example)
| April | May | June | |
|---|---|---|---|
| Opening cash | 1,000 | 1,500 | 2,300 |
| Receipts | 2,000 | 2,400 | 2,800 |
| Payments | 1,500 | 1,600 | 1,700 |
| Net cash flow | 500 | 800 | 1,100 |
| Closing cash | 1,500 | 2,300 | 3,400 |
Reconciliation (bank and MoMo)
Each month compare: the cash book balance with the cash counted; the bank statement with the cash book (find deposits not yet banked and cheques not yet cleared); and the MoMo statement with MoMo receipts and fees. List the differences and find each cause. Withholding tax certificates from customers go in your tax file.
Tax records
If you use the Modified Taxation Scheme, keep the turnover records GRA needs. If you are VAT-registered, keep VAT invoices and returns by the last working day of the next month. If you employ people, SSNIT by the 14th and PAYE by the 15th. Keep everything at least 6 years.
Your own month
Example figures. Opening cash GH¢800 and tools GH¢1,800 (salvage GH¢300, life 5 years). Receipts: 12 pump services at GH¢250, 6 plug and filter sales at GH¢50, 4 tiller services at GH¢200. Payments: parts bought GH¢1,100; rent GH¢350; transport GH¢180; data GH¢40; drawings GH¢600. Parts stock left at month end: GH¢250 (opening stock GH¢0). (a) Total receipts. (b) Closing cash. (c) Cost of parts used. (d) Monthly depreciation. (e) Net profit. (f) Does the balance sheet balance (opening capital = opening cash + tools)? (g) Break-even jobs if fixed costs are rent, transport and data, and the average cash margin per job is GH¢150.
Tools and items for this unit
| Item | What it is and when you use it | Size or type |
|---|---|---|
| Cash book, ledger, stock card | Money and stock records | Exercise books |
| Calculator | Costing and break-even | Any |
| MoMo and bank statements | For reconciliation | Monthly |
Defined in Level 1 Appendix A12, Level 2 Appendix B13 and Appendix C8 below.
Keep a month of books
- For a pretend or real month, record every sale and payment in a cash book with a running balance.
- Keep a stock card for three parts and a debtors list.
- At month end prepare the income statement and balance sheet and do the three checks.
- Do a reconciliation with a (sample) bank or MoMo statement given by the trainer.
- Write a half-page note: what the numbers say and one action.
Collect real prices
Collect three real price quotes for each of: a spark plug, an air filter and a hose clamp, and the time a service takes. Use them to cost one job.
Check yourself
- Write the accounting equation.
- Are the owner's drawings an expense?
- What is the difference between margin and mark-up?
Unit 7 · Grow, sustain and present your plan
A business that grows too fast can fail as surely as one that never starts. Grow by trust, quality and cash, and keep your name clean.
Competency standard
| Learning outcome | Performance criteria: the trainee… |
|---|---|
| 7.1 Build quality and customer care | sets standards, handles complaints and keeps customers |
| 7.2 Price and plan growth | adjusts prices, adds services and plans to scale safely |
| 7.3 Win contracts and partners | prepares a quote or tender and works with suppliers and groups |
| 7.4 Keep records for loans and succession | prepares what a lender wants and plans for the future |
| 7.5 Present a 12-month plan | presents a one-page plan and cash-flow forecast to a panel |
Range. A small engine and pump business in its first two years. Evidence. Capstone presentation and written plan.
Ask a qualified expert. This is general information, not legal, tax or financial advice. Ask a qualified lawyer before you sign a contract, take a partner or write a will. Check with GRA or a qualified accountant on tax. Ask your bank, a licensed insurer or a qualified accountant for loans and insurance. For fuel, fire, exhaust and pressure work, ask a qualified mechanic or a GhIE-registered engineer.
Quality systems and customer care
- Use the job card, handover test and guarantee from Unit 3 on every job.
- Answer messages the same day, even if only to say when you will come.
- Complaints: listen, write it down, check the facts, fix or explain, and follow up. Keep a complaints log.
- Ask for feedback and a Google review from happy customers.
- Honesty is the product. Tell farmers when they do not need a repair.
Pricing strategy
- Price by cost, margin and value: a pump back in a day is worth more than a cheap job done slowly.
- Offer service plans (Unit 1) with a clear saving for paying in advance, but keep a margin.
- Raise prices when your costs rise (parts, fuel); tell customers early and give the reason.
- Never undercut so far that you cannot cover costs and a safety margin.
Growing safely
- Prove one service is profitable before you add another.
- Add a helper only when the work and the cash can pay for one (Unit 5).
- Add services that use the same skills: hose and strainer supply, irrigation design for small plots (Unit 2), seasonal plans.
- Keep a cash reserve for slow months, such as the rainy season when pumps are used less.
- Re-do the break-even each time costs change.
Partnerships, contracts and tenders
- Suppliers: build credit slowly; pay on time.
- Farmer groups and cooperatives: a group service day or yearly contract gives steady work; ask a lawyer to review any written agreement.
- Tenders and larger buyers: a company, school or NGO may ask for a quote with your registration, TIN and references. A buyer who is a withholding agent may withhold tax. Ask GRA or an accountant.
- Honest limits: do not accept a design or installation beyond your skill; refer large or high-pressure work to a GhIE-registered engineer.
Records for loans, and succession
A lender wants: your registration papers and TIN, 6 to 12 months of cash book or statements, an income statement, a cash-flow forecast, a clear use for the money and a repayment plan. Check the lender is licensed (insurers can be checked at the NIC; for banks and microfinance ask the Bank of Ghana).
Succession and ethics. Write down who knows what: customers' machines, supplier contacts, passwords and keys. Train a successor or helper. Write a will and ask a lawyer about it. Do not bribe, do not sell unsafe work, and do not copy or mislabel spare parts.
Capstone: one-page plan and 12-month cash-flow forecast
You present to a panel (the trainer, a local mechanic or farmer, and a business adviser, such as a GEA officer if available).
One-page plan headings: name and legal form; the customers and the need; services and prices; location and equipment; people and safety; registration and permits (with "not verified" items); the money (start-up and funding); the marketing plan; the main risks; the first-year goals.
12-month cash-flow forecast: a table of 12 columns like Unit 6, with opening cash, receipts, payments, net and closing cash, and a line for loan repayment. Show a cautious case (receipts 20% lower). All figures must be labelled "example" unless you collected a real price or a verified Ghana figure.
Forecast check
Example figures. A plan shows receipts of GH¢2,400 a month and payments of GH¢1,700 a month, with opening cash GH¢1,000. (a) Closing cash after 12 months? (b) In the cautious case receipts are 20% lower; what is the monthly net, and the closing cash after 12 months? (c) What does this tell the owner?
Tools and items for this unit
| Item | What it is and when you use it | Size or type |
|---|---|---|
| One-page plan and 12-month forecast sheet | Capstone | Paper |
| Customer feedback form | Quality system | One page |
Defined in Level 1 Appendix A12, Level 2 Appendix B13 and Appendix C8 below.
Present to the panel
- Write your one-page plan and 12-month forecast with a cautious case.
- Prepare a 5-minute talk: the customer, the service, the money, the risk.
- Present to the panel; answer questions; note feedback.
- Rewrite the plan to answer the main feedback.
- Put all documents in your logbook.
Ask for feedback
Show your draft plan to a working mechanic or a farmer. Ask what they would change, and write it down.
Check yourself
- Name three things to do before you grow the business.
- What do lenders want to see?
- When do you refer a design to a GhIE-registered engineer?
Appendix C · Supervisor and designer reference layer
Sheets, tables and checklists for the supervisor, the designer and the owner of a workshop. Anything marked "example" is not a real price or a real crop figure. Anything marked "not verified" must be checked before you rely on it. Your engine, pump and hose makers' data win over every table here.
Ask a qualified expert. This appendix touches irrigation design, pressure, fuel, fire, electrical and chemical hazards, water-use law, tax, contracts, warranties and money. It is general information, not legal, tax or engineering advice. Ask a GhIE-registered engineer for any design beyond a small plot or any pressure above the pipe rating; ask a qualified mechanic for engine work; ask a qualified lawyer about contracts, warranties and permits; ask GRA or a qualified accountant about tax; ask a doctor or nurse about injury and illness; call 112 in an emergency. Do not attempt work you are not trained and authorised to do.
C1. Irrigation design toolkit
C1.1 Design sheet (blank, copy for each farm).
| Line | Entry | Source of the figure |
|---|---|---|
| Farm, plot area (m2) | measured | |
| Crop and growth stage | farmer | |
| Water need (mm per day) | district agriculture officer or FAO CROPWAT with Ghana Meteorological data: not found for the Western Region | |
| Method and efficiency (%) | maker or extension officer | |
| Net water per day (litres) = mm x m2 | calculation | |
| Gross water per day = net / efficiency | calculation | |
| Pump flow (L/s, measured) | bucket test | |
| Pumping time per day = gross / flow | calculation | |
| Suction lift, delivery height, hose length, hose size | measured | |
| Friction loss (from C1.3) | table or maker | |
| Pressure needed at emitters or sprinklers (as head) | maker | |
| Total head | sum | |
| Pump curve flow at that head | maker's curve in writing | |
| Water permission checked (C5) | WRC; District Assembly |
Crop water. Only seasonal figures for northern Ghana schemes were found in the research for this book; no figure for the Western Region was found, so none is printed. Leave the cell blank until the district agriculture officer or a CROPWAT run with local data fills it. FAO's irrigation scheduling manual covers methods for scheduling and for converting mm per day to litres per second per hectare.
C1.2 Method and pressure. FAO groups pressurised systems as low pressure 2.0 to 3.5 bar, medium 3.5 to 5.0 bar, and high above 5.0 bar; drip emitters give 0.4 to 1.0 litre per hour at 0.6 to 1.0 bar. One bar is about 10.2 m of head.
C1.3 Friction loss and hose speed (recalculated). The Hazen-Williams SI formula is: loss in metres = 10.67 x L x Q^1.852 / (C^1.852 x D^4.87), with Q in m3 per second and L and D in metres. The table below uses C = 150 (an assumed smooth-plastic value, an example, not a hose maker's figure); for C = 120 multiply by 1.51. Level 2 Appendix B5 has the table for 50, 80 and 100 mm hose. FAO says friction head rises roughly with the square of the flow. Lay-flat and old hose may lose more: ask the hose maker and a GhIE-registered engineer.
| Worked check (numbers are examples) | Working | Result |
|---|---|---|
| Flow of 200 L per minute | 200 / 60 | 3.33 L/s (12 m3 per hour) |
| 40 m of 50 mm hose, C = 150 | 10.67 x 40 x 0.00333^1.852 / (150^1.852 x 0.05^4.87) | 2.2 m of head |
| Same, C = 120 | 2.2 x 1.51 | 3.4 m of head |
| Water speed in the 50 mm hose | Q / A | 1.7 m per second |
| Same flow in 63 mm hose | formula | 0.7 m of head; 1.1 m per second |
Compare with the design sheet exercise in Unit 2, where 4 m of friction is used: 4 m is a safe, higher figure than 2.2 m for 40 m of 50 mm hose. All checked by script.
C1.4 System curve method. Total head at the plot = static height + friction (grows with the square of flow) + pressure at the emitters. Draw it on a graph of flow (across) against head (up), draw the maker's pump curve on the same graph, and the working point is where the two cross. The pump must still be on its curve with margin. Honda reminds users that discharge head capability exceeds suction capability, so keep the suction part of the head the shorter part.
C1.5 Pump choice sheet.
| Check | Pass |
|---|---|
| Curve gives the needed flow at the total head | With margin, in writing from the maker or dealer |
| Suction lift small | Well inside the practical limit: FAO says about 4.5 m for centrifugal pumps with a short suction pipe |
| Engine power above shaft power | Hydraulic kW = 0.00981 x L/s x m; shaft = hydraulic / pump efficiency. Example: 3.33 L/s at 21.2 m = 0.69 kW hydraulic; 1.39 kW shaft at 50% (example) |
| Port and hose sizes | Suction hose not smaller than the port |
| Real flow vs 5 L/s | Measured; see C5 |
C1.6 Emitters and flow. Number of emitters a pump can serve at most = pump flow in litres per hour / emitter flow. Example: 12,000 L per hour at 1.0 L per hour per emitter is 12,000 emitters; leave a large margin for pressure and head. Layout: use blocks so the pump waters one block at a time (Unit 2).
C1.7 Cost per cubic metre. Cost per m3 = (fuel litres per hour x price per litre) / flow in m3 per hour. Example only: petrol 1.2 L/h at GH¢15 gives GH¢18 an hour; at 12 m3 per hour that is GH¢1.50 per m3. A diesel pump using 0.9 L/h at an example GH¢16 gives GH¢14.40 an hour, or GH¢1.20 per m3. These are examples. Fill the sheet with a measured flow, a measured fuel use and today's fuel price. Add repairs, labour and depreciation for the true cost.
C2. Supervisor kit
C2.1 Pump commissioning sheet.
| Check | Result |
|---|---|
| Engine daily checks done (Unit 1 and Level 1 Card 2) | |
| Pump primed, time to first water (s) | |
| Strainer fully under water, hose reinforced, sealing washer fitted | |
| Measured flow (L/s) at working head | |
| Total head measured (m) | |
| Fuel used in a timed run (L/h) | |
| Noise or cavitation | |
| Customer shown start, stop, prime, daily check | |
| Customer signature, date |
C2.2 Handover sheet. Items handed over; what was done; parts replaced (give the old parts back); next service date and hours; the three daily checks; what voids the warranty (see C2.4); who to call; payment received or balance; signatures.
C2.3 Machine-history card. Machine, owner, make and model, serial, date of first service, then rows: date, hours, work done, parts, cost, next due.
C2.4 Warranty slip (template only). Job number; work covered; time limit and hour limit you choose; what is not covered (misuse, dry running, bad fuel, no daily checks, repairs by others); remedy (re-do the work or refund the labour); signed by both. Warranty and guarantee wording is a legal matter: ask a qualified lawyer to check your wording before you use it.
C2.5 Comeback log. As Level 2 Appendix B9, plus a column for the root cause and what changed in your process.
C2.6 Training sign-off matrix (trainer signs, dates and initials).
| Skill | Seen | Done under watch | Done alone | Date | Trainer |
|---|---|---|---|---|---|
| Safe refuel and mix | |||||
| Daily check and start | |||||
| Plug, filter, oil service | |||||
| Spark and fuel diagnosis | |||||
| Compression test and record | |||||
| Pump set-up and commissioning | |||||
| Chain sharpening and brake test | |||||
| Job card and handover |
C2.7 Parts list with minimum stock (example). Plugs, air filters, fuel filters, sediment cup O-rings, hose clamps, sealing washers, strainers, pull cords, carburettor kits for your most common engines, gaskets, oil. For each: part number, supplier, cost, minimum stock, reorder point. The levels depend on your own sales, so leave them blank until you have three months of records. JICA-type studies report that spare-part scarcity shortens machine life in Ghana, so choose brands you can get parts for: this is a decision rule from reading, not verified here.
C3. Maintenance and fleet management
C3.1 Service-plan builder. Items to schedule per machine come from the maker's manual. For the Honda WB pumps these include: engine oil, air cleaner, spark plug, spark arrester, sediment cup, idle speed, valve clearance, combustion chamber, fuel tank and filter, fuel tube, impeller, impeller clearance and pump inlet valve, each "whichever comes first" in hours or months; the manual also says to log operating hours for commercial use.
| Machine | Task | Interval hours (from the manual) | Interval months | Last done | Next due |
|---|---|---|---|---|---|
C3.2 Hour-meter practice. Fit or read an hour meter at every visit; if there is none, estimate hours from a log of start and stop times and fuel added. Write hours on the machine-history card and the service sticker.
C3.3 Fuel economy audit (measure, do not assume). Fill to the mark; run a measured time at a steady load; refill to the mark; litres divided by hours. Repeat after a service. A fall in fuel economy is often the first sign of a blocked air filter or a worn engine.
C3.4 Spares plan and storage calendar. Spares: see C2.7. Storage calendar for the Western Region rains: no seasonal data found: not verified. Ask the district agriculture officer for the local planting and rain calendar and mark the pre-season service and end-of-season storage dates on it.
C4. Decision tables
C4.1 Which engine for which job.
| Job | Likely choice | Notes |
|---|---|---|
| Small vegetable plot, short days | Small petrol pump (2-inch class) | Low cost; short hours |
| Longer daily hours, larger flow | Diesel pump | Higher cost, lower fuel use per hour in the examples in Level 2 Unit 5 |
| Chainsaw, brush cutter | Two-stroke | Mixed fuel; maker's ratio |
| Hard soil preparation | Power tiller | Petrol or diesel |
| Grid power available | Electric pump | Check electrical work with a certified electrician (Energy Commission) |
| Sunny site, no fuel supply | Solar pump | See the hub's Solar Energy module |
C4.2 Petrol, diesel, grid electric, solar and hand pumps: the decision table. Structure only. Cost columns are blank because no verified local cost data was found; fill with dealer quotes and a dated price survey. Research notes that Ghana studies describe fuel pump costs as heavy for farmers and that solar pay-as-you-own schemes exist: not verified here (partial sources).
| Option | Cost per m3 (fill) | Breakdown risk | Repair skill needed | Who services it |
|---|---|---|---|---|
| Petrol pump | Small-engine mechanic (this course) | You | ||
| Diesel pump | Diesel mechanic | You or a diesel specialist | ||
| Grid electric | Certified electrician | Electrician | ||
| Solar | Solar installer | Certified installer | ||
| Hand or treadle | Simple | Local welder |
C4.3 Repair or replace: the yearly cost rule. Yearly cost of keeping the old machine = repair cost spread over the years it will last + yearly fuel + yearly service + the risk of downtime. Yearly cost of a new machine = (price - resale) / years + yearly fuel + service. Choose the lower yearly cost, and remember that a new machine has lower fuel use and warranty. Worked example in Unit 4. Never forget the fuel cost: it is the hidden cost.
C4.4 Hire or own. Own when hours per year are high enough that (price + upkeep) / hours is lower than the hire rate; hire when use is a few days a season. Fill with real quotes.
C4.5 New or reconditioned: the inspection list. Run the engine from cold; compression test with dry and wet readings and a written record (Level 2 B2); check for leaks, smoke, noise and play in the crankshaft; look for new paint over rust; ask what was replaced; written warranty. Advice on second-hand engines carries a liability: ask a qualified mechanic and a lawyer to check any quote or guarantee wording.
C5. Ghana compliance checklist
The two right-hand columns are blank until you check. "Verified on" must be a date.
| Item | What the sources say | Who to ask | Verified on |
|---|---|---|---|
| Business name | ORC registration; fees in Unit 5 | ORC | |
| Tax identity | Ghana Card number as TIN for individuals | GRA | |
| Business operating permit | STMA portal; fee for engine and pump workshop not verified | STMA | |
| Water: pumping from a river or stream for a customer | Manual abstraction exempt (reg. 9); mechanical abstraction up to 5 L/s is exempt from the permit but must be registered with the District Assembly (regs. 10 and 11); the fee schedule in the text read is in 2001 values, current fees not verified | Water Resources Commission; District Assembly | |
| Does the pump pass 5 L/s? | Best-case flows of the Honda WB20XT and WB30XT are 9.6 and 17.3 L/s; measure the real flow at the working head | Water Resources Commission | |
| Selling or storing fuel | Commercial storage and sale needs an NPA licence; small quantities not verified | NPA; Ghana National Fire Service | |
| Fire certificate | The Fire Precaution (Premises) Regulations 2003 (L.I. 1724) are reported to require a fire permit and certificate for premises: not verified at the text | Ghana National Fire Service | |
| Environment | Act 917 was repealed and absorbed by the Environmental Protection Act 2025 (Act 1124). Whether a small engine workshop must register, and where to take used oil: not verified | EPA Western Regional office | |
| Chainsaws | A news report says the ban on chainsaw lumber milling is in force; the regulation number is not verified | Forestry Commission | |
| Insurance | Licensed insurers only | NIC |
C6. Business annex
Costing sheet (example numbers). Parts GH¢___ + consumables GH¢___ + travel GH¢___ + labour (hours x rate) GH¢___ = cost; price = cost / (1 - margin). Example: cost GH¢160, margin 25% on price: 160 / 0.75 = GH¢213.33.
Price list template. Service pack | what is included | price (blank until you survey) | date of price. No real prices without a local survey.
WhatsApp quote template. "Good day [name]. For your [machine], I found [fault]. Work: [steps]. Parts: [list, prices]. Labour: [hours]. Total: GH¢[]. Deposit for parts: GH¢[]. Ready: [date]. Warranty: [terms]." Keep a copy on the job card.
C7. Worked cases (labelled worked examples, not real incidents)
| Case | What went wrong | The cheap test | The rule |
|---|---|---|---|
| Pump placed far above the water with a long thin suction hose | No prime; cavitation noise | Measure lift and hose; check with Appendix B5 | Keep suction short, low and large; best-case figures are not real figures |
| Strainer lying on the bottom of a muddy stream | Blocked strainer, low flow | Look at the strainer | Strainer fully under water, off the bottom |
| Pump runs dry | Seal destroyed | Watch the first water time | Never run dry |
| Stored mixed fuel used after months | Hard starting, gummy carburettor | Jar test, smell | Mix only what you will use; the Honda manual lists bad stored fuel as a cause of no start |
| Oversized pump bought | Pump cannot prime, or the farm passes 5 L/s | Measure real flow and compare with the curve | Size to the job; check the water-use rule |
| Reconditioned engine sold with no test record | Comeback in two weeks | Compression record | Record dry and wet readings |
| Unpaid job without a deposit | Parts paid by you, customer disappears | Deposit before parts | Always take a deposit that covers parts |
Add your own real cases here, with the date, what was found, the figure measured and what it cost.
C8. Tools and Items Glossary (added at Level 3)
These items are added to the lists in Level 1 Appendix A12 and Level 2 Appendix B13. Also called: other common English or trade names. Local names for tools differ from town to town. Use the standard name given here when you order or ask for help, and show the picture.
| Item | What it is and what it does | Size or type | Also called | Used in |
|---|---|---|---|---|
| Drip tape (drip line) | Thin hose with built-in emitters along its length | Wall thickness and emitter spacing by maker | drip line, drip hose, T-tape | U2 |
| Emitter (dripper) | A small outlet that releases water drop by drop; FAO: 0.4 to 1.0 L/h at 0.6 to 1.0 bar | By maker | dripper, drip emitter | U2 |
| Mini sprinkler and riser | A small spray head on a short pipe | Pressure by maker | micro sprinkler, sprayer on stake | U2 |
| Screen or disc filter | Stops grit blocking emitters; put it on the delivery line | Mesh by maker | mesh filter, Y-filter, irrigation filter | U2 |
| Pressure regulator | Holds the pressure at the emitters steady | By maker | pressure reducing valve, regulator | U2 |
| Flush valve | Opens at the end of a line to wash out dirt | By maker | end valve, line flush, flush end | U2 |
| PVC pipe | Rigid plastic pipe; choose the pressure class from the maker; Ghana grades not verified | By maker | PVC, rigid plastic pipe | U2 |
| Polyethylene (PE) pipe | Flexible plastic pipe for field lines | By maker | PE pipe, poly pipe, black pipe | U2 |
| Lay-flat hose | Flat hose that fills when under pressure; may lose more head than the formula says | By maker | layflat, flat hose, collapsible hose | U2 |
| Pressure gauge | Reads pressure in bar, kPa or psi; fit at the pump or first valve | 0 to 6 bar (example) | manometer, pressure meter | U2 |
| Flow-test set | Bucket of known size and stopwatch | 20 L bucket | bucket and stopwatch set | U2 |
| Test tank or drum | Holds water for bench tests | 200 L drum | water drum, test barrel | U3 |
| Air compressor | Supplies clean air for cleaning and a leak-down tester | Small workshop type | air pump, shop compressor | U3 |
| Workbench and parts shelves | Hold work and stock | Firm, level | work table, stock shelves | U3 |
| Mobile toolbox | A lockable box of tools and spares for farm visits | Medium | tool bag, field kit, tool chest | U3 |
| Hour meter | Counts engine hours | Fit to the engine | hour counter, running-hours meter | U1 |
| Job card, receipt book, cash book, stock card | Paper records for jobs, payments, money and stock | Printed or exercise books | job sheet, receipt pad, account book, stock sheet | U5, U6 |
| Warranty slip | A signed note of what you guarantee | Template in C2.4 | guarantee note, service guarantee | U3 |
| Service sticker | A label on the machine giving the next service date and hours | Self-adhesive | service label, due-date sticker | U1 |
| Fuel container labels | Labels reading PETROL or MIXED FUEL with ratio and date | Waterproof | petrol labels, mixed-fuel labels | U3 |
Start-up kit by cost class. Cheap: hand tools, rags, labels, funnel, marked cup, job books. Medium: spark tester, compression tester, pressure gauge, vice, chain-sharpening set. Dear: air compressor, leak-down tester, a vehicle. Prices: not verified; get dealer quotes.
Glossary
| Term | Meaning |
|---|---|
| Asset | Something the business owns, like cash, stock and tools |
| Break-even | The point where income equals all costs |
| Cash book | Record of money in and out with a running balance |
| Comeback | A job that returns because the first work failed |
| Creditor | Someone the business owes |
| Debtor | Someone who owes the business |
| Depreciation | The yearly fall in value of a tool or machine |
| Drawings | Money the owner takes out of the business |
| Equity | What the owner has in the business (assets minus liabilities) |
| Gross profit | Sales minus the cost of parts used |
| Margin | Profit divided by price |
| Mark-up | Profit divided by cost |
| MTS | Modified Taxation Scheme: a simple tax route for small traders |
| Reconciliation | Matching your records to the bank or MoMo statement |
| Total head | The full height of water the pump must push, including friction and pressure |
Logbook
Copy these pages into an exercise book. Your logbook is part of your assessment evidence.
- Unit 1: decision tree; machine histories; service plan and schedule
- Unit 2: design sheet; layout sketch; flow test result; recommendation
- Unit 3: job cards; workshop rules; supervising log; guarantee
- Unit 4: yearly cost sheet; recommendation; quote
- Unit 5: registration checklist; start-up budget; funding plan; one-page plan
- Unit 6: a month of books; statements; reconciliation note
- Unit 7: capstone plan; forecast; panel feedback
- Every homework, dated
Self-check quiz
- Why do you plan service by run hours?
- What do you do first in a written decision tree?
- How many litres is 1 mm of water over 1 m²?
- List the four parts of total head for a pressure system.
- What do you check before a helper works alone with a running engine?
- Write the straight-line depreciation formula.
- What is the cost to register a business name in 2026 and its yearly renewal?
- For services, is there a VAT turnover threshold?
- Name two bodies to ask before storing petrol for sale.
- Write the accounting equation.
- Are drawings an expense?
- What goes into a 12-month cash-flow forecast?
Further reading and sources
Best next reads: your engine's and pump's manuals; the hub's Money Skills Level 2, Entrepreneurial Thinking Level 2, Workplace Safety, Solar Energy (solar pumps), and Boreholes and Water Pumps.
What this module does not cover: engine rebuilding, injection-pump work, detailed hydraulic design, drone or solar irrigation (see the hub's other modules), fire certificate rules for a workshop (not verified), compulsory insurance (not verified), EPA used-oil rules (not verified), the 1% company capital duty (not settled), and current Ghana prices of engines, pumps and spares (not verified).
Every source used in this manual is listed, with links, in the Teacher Copy.